{"id":25520,"date":"2014-04-21T03:23:15","date_gmt":"2014-04-21T00:23:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=25520"},"modified":"2014-04-21T03:23:15","modified_gmt":"2014-04-21T00:23:15","slug":"dev-termik-santral-ihalesi-2-67-milyar-dolara-ic-ictasin","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/dev-termik-santral-ihalesi-2-67-milyar-dolara-ic-ictasin\/","title":{"rendered":"(Turkish) Dev Termik Santral \u0130halesi 2.67 Milyar Dolara IC \u0130\u00e7ta\u015f\u2019\u0131n&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/25520\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye\u2019de \u00f6zelle\u015ftirmeler se\u00e7im sonras\u0131 h\u0131z kazand\u0131. Sat\u0131\u015fa \u00e7\u0131kar\u0131lan iki devasa termik santral i\u00e7in en y\u00fcksek teklif 2 milyar 671 milyon dolarla IC \u0130\u00e7ta\u015f Enerji \u00dcretim ve Ticaret A\u015e\u2019den geldi. \u0130halede 2 milyar 355 milyon dolar ba\u015flang\u0131\u00e7 tutar\u0131 ve 1 milyon dolar art\u0131rma aral\u0131\u011f\u0131yla ge\u00e7ilen a\u00e7\u0131k art\u0131rmaya, \u00c7elikler Taahh\u00fct \u0130n\u015faat ve Sanayi A\u015e-Kalyon \u0130n\u015faat Sanayi ve Ticaret A\u015e Ortak Giri\u015fim Grubu, Limak \u0130n\u015faat Sanayi ve Ticaret A\u015e ile IC \u0130\u00e7ta\u015f Enerji \u00dcretim ve Ticaret A\u015e kat\u0131ld\u0131.<\/strong><\/p>\n<p>Af\u015fin santralinden sonra en b\u00fcy\u00fck iki termik santral olan Kemerk\u00f6y ve Yenik\u00f6y termik santrallerinin ihalesi 3 turda tamamland\u0131. 6 grup ve konsorsiyumun kat\u0131ld\u0131\u011f\u0131 ihalede teklif 2 milyar 500 milyon dolar\u0131 a\u015ft\u0131.<\/p>\n<p>\u0130lk elemeli turda fiyat 1 milyar 900 mil<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/dev-termik-santral-ihalesi-2-67-milyar-dolara-ic-ictasin.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-25521\" title=\"dev-termik-santral-ihalesi-2-67-milyar-dolara-ic-ictasin\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/dev-termik-santral-ihalesi-2-67-milyar-dolara-ic-ictasin-300x197.jpg\" alt=\"\" width=\"300\" height=\"197\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/dev-termik-santral-ihalesi-2-67-milyar-dolara-ic-ictasin-300x197.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/dev-termik-santral-ihalesi-2-67-milyar-dolara-ic-ictasin-500x329.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/dev-termik-santral-ihalesi-2-67-milyar-dolara-ic-ictasin-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/dev-termik-santral-ihalesi-2-67-milyar-dolara-ic-ictasin.jpg 505w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>yon dolar oldu. \u0130lk turun sonunda Park Holding ihale d\u0131\u015f\u0131 kald\u0131. \u0130kinci elemeli turda teklif 2 milyar 152 milyon dolar oldu ve Konya \u015eeker ihale d\u0131\u015f\u0131 kald\u0131. \u00dc\u00e7\u00fcnc\u00fc ve son elemeli turda Elsan elendi ve a\u00e7\u0131k art\u0131rma b\u00f6l\u00fcm\u00fcne 2 milyar 355 milyon dolar seviyesinden ba\u015flan\u0131ld\u0131. Limak Holding a\u00e7\u0131k artt\u0131rmadan a\u015famas\u0131ndan ihaleden \u00e7ekildi. a\u00e7\u0131k art\u0131rma 2 milyar 355 milyon dolardan ba\u015flad\u0131. A\u00e7\u0131k art\u0131rmadan ilk \u00e7ekilen Limak oldu. \u0130halede teklif 2,4 milyar dolar\u0131 a\u015ft\u0131. \u0130halenin nihai a\u015famas\u0131 olan a\u00e7\u0131k art\u0131rma b\u00f6l\u00fcm\u00fc IC \u0130\u00e7ta\u015f ve Kalyon-\u00c7elikler aras\u0131nda ger\u00e7ekle\u015fti. Teklif 2 milyar 671 milyon dolar\u0131 a\u015f\u0131nca \u00c7elikler-Kalyon mola istedi. Molan\u0131n ard\u0131ndan Kalyon-\u00c7elikler ihaleden \u00e7ekildi\u011fini a\u00e7\u0131klad\u0131, ve en y\u00fcksek teklifi veren IC \u0130\u00e7ta\u015f ihalenin kazanan\u0131 oldu.<\/p>\n<p>Son tura kalan \u00c7elikler grubu Seyit\u00f6mer Termik Santrali\u2019nin \u00f6zelle\u015ftirme ihalesini de kazanm\u0131\u015ft\u0131. Bu santralden \u00e7\u0131kar\u0131lan i\u015f\u00e7iler d\u00fcn bir eylem yaparak baz\u0131 binalar\u0131 yakm\u0131\u015ft\u0131.<\/p>\n<p>S\u00f6z konusu \u00f6zelle\u015ftirmeyle Kemerk\u00f6y Termik Santrali ile ta\u015f\u0131nmazlar\u0131, Yenik\u00f6y Termik Santrali ile Yenik\u00f6y Linyitleri \u0130\u015fletmesi taraf\u0131ndan kullan\u0131lan ta\u015f\u0131n\u0131r ve ta\u015f\u0131nmazlar\u0131 sat\u0131\u015f y\u00f6ntemiyle; ilgili maden ruhsatlar\u0131 ve bu ruhsatlar\u0131n kapsad\u0131\u011f\u0131 maden sahalar\u0131 ile Kemerk\u00f6y \u0130skelesi ve geri sahas\u0131nda bulunan ta\u015f\u0131nmazlar\u0131n ise i\u015fletme hakk\u0131 kazanan gruba ge\u00e7mi\u015f oluyor.<\/p>\n<div id=\"news_content\">\n<p>Kemerk\u00f6y ve Yata\u011fan termik santrallerinin kurulu g\u00fcc\u00fc 1050 megavata kar\u015f\u0131l\u0131k geliyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2014\/04\/18\/termik-santral-ihalesi-milyar-dolar-ic-ictas-cecen-yenikoy-kemerkoy-ozellestirme-oib-ihalesi\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>\n<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye\u2019de \u00f6zelle\u015ftirmeler se\u00e7im sonras\u0131 h\u0131z kazand\u0131. Sat\u0131\u015fa \u00e7\u0131kar\u0131lan iki devasa termik santral i\u00e7in en y\u00fcksek teklif 2 milyar 671 milyon dolarla IC \u0130\u00e7ta\u015f [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":25521,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[63,67,1009,165,14360,10618,14358,14359],"views":952,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/25520"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=25520"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/25520\/revisions"}],"predecessor-version":[{"id":25522,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/25520\/revisions\/25522"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/25521"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=25520"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=25520"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=25520"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}