{"id":25171,"date":"2014-04-11T09:56:15","date_gmt":"2014-04-11T06:56:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=25171"},"modified":"2014-04-11T10:00:06","modified_gmt":"2014-04-11T07:00:06","slug":"burokrasiye-takilan-toplam-6-6-milyar-euroluk-ruzgar-santralleri-krizi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/burokrasiye-takilan-toplam-6-6-milyar-euroluk-ruzgar-santralleri-krizi\/","title":{"rendered":"(Turkish) B\u00fcrokrasiye Tak\u0131lan Toplam 6.6 Milyar Euroluk R\u00fczgar Santralleri Krizi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/25171\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u0130n\u015faat iznini hen\u00fcz alamam\u0131\u015f r\u00fczgar santrali yat\u0131r\u0131mlar\u0131 i\u00e7in verilen s\u00fcre 2 May\u0131s\u2019ta sona eriyor. Risk alt\u0131ndaki yat\u0131r\u0131mlar\u0131n toplam\u0131 5300 megavata ula\u015f\u0131rken, bunun parasal kar\u015f\u0131l\u0131\u011f\u0131 6.6 milyar euroya ula\u015f\u0131yor. R\u00fczg\u00e2r enerjisi sekt\u00f6r\u00fcnde f\u0131rt\u0131na \u00f6ncesi sessizlik h\u00e2kim. Deyim yerindeyse sekt\u00f6rde a\u011f\u0131zlar\u0131 b\u0131\u00e7ak a\u00e7m\u0131yor. Nedeni ise lisans ald\u0131\u011f\u0131 halde b\u00fcrokrasi y\u00fcz\u00fcnden in\u015faat\u0131na hen\u00fcz ba\u015flanmam\u0131\u015f r\u00fczg\u00e2r santrallerinin lisanslar\u0131n\u0131 kaybedecek olmas\u0131. Sekt\u00f6rde \u20182 May\u0131s Sendromu\u2019 olarak adland\u0131r\u0131lan bu sorunu T\u00fcrkiye R\u00fczgar Enerjisi Birli\u011fi (T\u00dcREB) Ba\u015fkan\u0131 Mustafa Ataseven ile konu\u015ftu.<\/strong><\/p>\n<h2>Lisanslar iptal edilecek<\/h2>\n<p>Ataseven, \u201cYasal izinleri al\u0131nm\u0131\u015f 5300 megavat kapasiteye sahip 160 r\u00fczgar enerjisi santrali (RES) kapanma tehlikesiyle kar\u015f\u0131 kar\u015f\u0131ya\u201d dedi. Ataseven, \u015f\u00f6yle konu\u015ftu: \u201cBu yat\u0131r\u0131mlar\u0131n toplam tutar\u0131 6.6 milyar euro. E\u011fer bu santraller hay<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/burokrasiye-takilan-toplam-6-6-milyar-euroluk-ruzgar-santrallerinde-krizi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-25172\" title=\"burokrasiye-takilan-toplam-6-6-milyar-euroluk-ruzgar-santrallerinde-krizi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/burokrasiye-takilan-toplam-6-6-milyar-euroluk-ruzgar-santrallerinde-krizi-300x198.jpg\" alt=\"\" width=\"300\" height=\"198\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/burokrasiye-takilan-toplam-6-6-milyar-euroluk-ruzgar-santrallerinde-krizi-300x198.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/burokrasiye-takilan-toplam-6-6-milyar-euroluk-ruzgar-santrallerinde-krizi-500x330.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/burokrasiye-takilan-toplam-6-6-milyar-euroluk-ruzgar-santrallerinde-krizi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/burokrasiye-takilan-toplam-6-6-milyar-euroluk-ruzgar-santrallerinde-krizi.jpg 505w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>ata ge\u00e7erse T\u00fcrkiye y\u0131ll\u0131k 1.3 milyar dolarl\u0131k do\u011falgaz ithalat\u0131ndan kurtulacak. Dolay\u0131s\u0131yla RES yat\u0131r\u0131mlar\u0131 makro ekonomik dengeler ve cari a\u00e7\u0131\u011f\u0131n d\u00fc\u015f\u00fcr\u00fclmesi noktas\u0131nda a\u00e7\u0131s\u0131ndan hayati \u00f6nem sahip.\u201d<\/p>\n<p>Elektrik Piyasas\u0131 Kanunu\u2019nun 6. ve ge\u00e7ici 9 maddesi ile Elektrik Piyasas\u0131 Lisans Y\u00f6netmeli\u011fi\u2019nin ge\u00e7ici 15 maddesine g\u00f6re lisans a\u015famas\u0131ndaki r\u00fczgar santralleri 2 May\u0131s 2014\u2019e kadar in\u015faat izinlerini almak zorunda. E\u011fer alamazlarsa lisanslar\u0131 iptal edilecek.<\/p>\n<p>TUREB Ba\u015fkan\u0131 Ataseven \u201cBu projeler hayata ge\u00e7mezse s\u00f6z konusu santrallerin y\u0131ll\u0131k \u00fcretiminden elde edilecek 244 milyon liral\u0131k devlet katk\u0131 pay\u0131 gelirlerinden mahrum kalacak. Ayr\u0131ca TE\u0130A\u015e taraf\u0131ndan bu santrallerin devreye girece\u011fi \u00f6ng\u00f6r\u00fclerek yap\u0131m\u0131na ba\u015flanan veya devam eden trafo merkezleri ve enerji nakil hatt\u0131 yat\u0131r\u0131mlar\u0131 bo\u015funa yap\u0131lm\u0131\u015f olacak\u201d diye konu\u015ftu.<\/p>\n<p>Sorunun \u00e7\u00f6z\u00fcm\u00fc i\u00e7in T\u00fcrkiye B\u00fcy\u00fck Millet Meclisi (TBMM) Enerji ve Tabii Kaynaklar Komisyonu\u2019yla g\u00f6r\u00fc\u015f\u00fcld\u00fc. Hemen ard\u0131ndan da Enerji Bakanl\u0131\u011f\u0131 ve Enerji Piyasas\u0131 D\u00fczenleme Kurumu (EPDK) ile temasa ge\u00e7ildi. TUREB Ba\u015fkan\u0131 Ataseven sorunun \u00e7\u00f6z\u00fcm\u00fc i\u00e7in iki yol oldu\u011funu belirterek \u015funlar\u0131 s\u00f6yledi: \u201cSorunun \u00e7\u00f6z\u00fcm\u00fc i\u00e7in Elektrik Piyasas\u0131 Lisans Y\u00f6netmeli\u011fi ve Elektrik Piyasas\u0131 Kanununda d\u00fczenlemeye gidilmesi laz\u0131m. Burada ya y\u00f6netmelik veya kanun de\u011fi\u015fikli\u011fine gidilebilir. Ayr\u0131ca EPDK isterse m\u00fccbir sebep kapsam\u0131nda ba\u015fvurular\u0131 yeniden ele al\u0131p, lisans iptallerinin \u00f6n\u00fcne ge\u00e7ebilir.\u201d<\/p>\n<h2>\u0130mar izni ilk s\u0131rada yer al\u0131yor<\/h2>\n<p>T\u00fcrkiye R\u00fczgar Enerjisi Birli\u011fi verilerine g\u00f6re lisanlamada en b\u00fcy\u00fck sorunu imar izinleri olu\u015fturuyor. \u0130mar izni i\u00e7in bekleyen yat\u0131r\u0131mlar\u0131n b\u00fcy\u00fckl\u00fc\u011f\u00fc 760 megavat. \u0130kinci s\u0131rada Orman ve Su i\u015fleri Bakanl\u0131\u011f\u0131 geliyor. Bu kurumdan izin bekleyen yat\u0131r\u0131mc\u0131lar\u0131n yat\u0131r\u0131mlar\u0131 677 megavata ula\u015f\u0131yor. Genel izin i\u00e7in bekleyen yat\u0131r\u0131mlar 634.5 megavat iken, Genel Etkile\u015fim Analizi i\u00e7in bekleyen yat\u0131r\u0131mlar\u0131n toplam\u0131 545 megavat oldu.<\/p>\n<p><strong>Haberin <a href=\"http:\/\/haber.gazetevatan.com\/ruzgar-enerjisinde-6-6-milyar-euroluk-kriz-nasil-cozulecek\/625739\/4\/yazarlar\" target=\"_blank\">Devam\u0131 \u0130\u00e7in TIKLAYIN&gt;&gt;<\/a><\/strong><\/p>\n<p>Yazan: Ufuk \u015eANLI<\/p>\n<p>Kaynak: Vatan<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u0130n\u015faat iznini hen\u00fcz alamam\u0131\u015f r\u00fczgar santrali yat\u0131r\u0131mlar\u0131 i\u00e7in verilen s\u00fcre 2 May\u0131s\u2019ta sona eriyor. Risk alt\u0131ndaki yat\u0131r\u0131mlar\u0131n toplam\u0131 5300 megavata ula\u015f\u0131rken, bunun parasal [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":25172,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[63,67,1009,165,3977,474,14208,69,16,5132,1682,3390],"views":488,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/25171"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=25171"}],"version-history":[{"count":6,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/25171\/revisions"}],"predecessor-version":[{"id":25178,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/25171\/revisions\/25178"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/25172"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=25171"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=25171"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=25171"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}