{"id":24894,"date":"2014-04-04T10:22:04","date_gmt":"2014-04-04T07:22:04","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=24894"},"modified":"2014-04-04T10:25:09","modified_gmt":"2014-04-04T07:25:09","slug":"iett-ilk-gunes-enerjisi-elektrik-uretim-tesisini-kurdu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/iett-ilk-gunes-enerjisi-elektrik-uretim-tesisini-kurdu\/","title":{"rendered":"(Turkish) \u0130ETT \u0130lk G\u00fcne\u015f Enerjisi Elektrik \u00dcretim Tesisini Kurdu&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/24894\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u0130ETT, \u0130kitelli Motor Yenileme Fabrikas\u0131nda g\u00fcne\u015f enerjisinden elektrik \u00fcreten ilk g\u00fcne\u015f enerjili elektrik \u00fcretim tesisini kurdu.<\/strong><\/p>\n<p>\u015eebeke elektri\u011fine entegre (on-grid) olan yani \u00fcretim fazlas\u0131 elektri\u011fi ak\u00fcler yard\u0131m\u0131yla depolamak yerine \u015febekeye geri ileten sistemde, anl\u0131k elektrik t\u00fcketim ihtiyac\u0131 \u00f6nce g\u00fcne\u015f enerjisinden, yetmedi\u011fi durumlarda ise \u015febekeden kar\u015f\u0131lan\u0131yor.<\/p>\n<p>\u0130htiyac\u0131n \u00fczerinde elektrik \u00fcretil<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/iett-ilk-gunes-enerjisi-elektrik-uretim-tesisini-kurdu.jpg\"><img loading=\"lazy\" class=\"alignleft size-full wp-image-24895\" title=\"iett-ilk-gunes-enerjisi-elektrik-uretim-tesisini-kurdu\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/iett-ilk-gunes-enerjisi-elektrik-uretim-tesisini-kurdu.jpg\" alt=\"\" width=\"300\" height=\"210\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/iett-ilk-gunes-enerjisi-elektrik-uretim-tesisini-kurdu.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/iett-ilk-gunes-enerjisi-elektrik-uretim-tesisini-kurdu-71x50.jpg 71w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>mesi halinde ise \u00fcretilen fazla elektrik \u015febekeye veriliyor. Sistemde, kimyasal bile\u015fen i\u00e7eren ak\u00fcler kullan\u0131lmad\u0131\u011f\u0131 i\u00e7in \u00e7evreye de zarar verilmiyor.<\/p>\n<p>G\u00fcne\u015f \u0131\u015f\u0131\u011f\u0131n\u0131 do\u011frudan elektri\u011fe \u00e7eviren toplam 42 adet PV (Fotovoltaik) g\u00fcne\u015f pilinden olu\u015fan sistem, \u015fimdiden \u0130ETT Motor Yenileme Fabrikas\u0131n\u0131n elektrik ihtiyac\u0131n\u0131n y\u00fczde 2,67\u2019sini kar\u015f\u0131lamaya ba\u015flad\u0131. Enerji maliyetlerindeki kazan\u0131m ile kendi yat\u0131r\u0131m maliyetini 4-5 y\u0131lda amorti etmesi beklenen g\u00fcne\u015f enerjili elektrik \u00fcretim tesisi, ilk etapta haftal\u0131k olarak 270 kWh (kilovat saat), y\u0131ll\u0131k ise 14000 kWh \u00fcretim yapacak.<\/p>\n<p>\u0130ETT Genel M\u00fcd\u00fcr\u00fc Dr. Hayri Bara\u00e7l\u0131, konuyla ilgili olarak \u015funlar\u0131 s\u00f6yledi: \u201c\u00dclkemizdeki di\u011fer kamu kurumlar\u0131na da \u00f6rnek olabilecek bu projenin hem \u0130ETT\u2019nin hem de di\u011fer kamu kurumlar\u0131n\u0131n alternatif enerji kaynaklar\u0131 kullan\u0131m\u0131na \u00f6nemli \u00f6l\u00e7\u00fcde y\u00f6n vermesini bekliyoruz. Enerji t\u00fcketimlerinin olduk\u00e7a yo\u011fun oldu\u011fu \u00fclkemizde, at\u0131lacak k\u00fc\u00e7\u00fck ad\u0131mlarla da olsa kamunun enerjiyi verimli kullanmas\u0131, enerji maliyetlerinin ekonomimiz \u00fczerindeki y\u00fck\u00fcn\u00fcn hafifletilmesine katk\u0131 sa\u011flayaca\u011f\u0131n\u0131 d\u00fc\u015f\u00fcn\u00fcyorum.<\/p>\n<p>Att\u0131\u011f\u0131m\u0131z bu ad\u0131mlarla \u0130kitelli Motor Yenileme Fabrikas\u0131\u2019nda ba\u015flatt\u0131\u011f\u0131m\u0131z bu projeyi t\u00fcm garajlar\u0131m\u0131zda ve hizmet binalar\u0131m\u0131zda yayg\u0131nla\u015ft\u0131rmay\u0131 hedefliyoruz. Bu sayede hem enerjide verimlili\u011fi yakalamak hem de iklim de\u011fi\u015fikli\u011fi ile m\u00fccadeleye katk\u0131da bulunmak hedefimize bir ad\u0131m daha yakla\u015fm\u0131\u015f olaca\u011f\u0131z.\u201d<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.haberedikkat.com\/haber\/IETT-ilk-gunes-enerjisi-elektrik-uretim-tesisini-kurdu\/130598\" target=\"_blank\">HabereDikkat<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u0130ETT, \u0130kitelli Motor Yenileme Fabrikas\u0131nda g\u00fcne\u015f enerjisinden elektrik \u00fcreten ilk g\u00fcne\u015f enerjili elektrik \u00fcretim tesisini kurdu. \u015eebeke elektri\u011fine entegre (on-grid) olan yani \u00fcretim [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":24895,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[185,14064,260,63,67,1009,165,5725,2403,227,13,12474,107,2087,14061,14063,1405,14062],"views":794,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/24894"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=24894"}],"version-history":[{"count":4,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/24894\/revisions"}],"predecessor-version":[{"id":24898,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/24894\/revisions\/24898"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/24895"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=24894"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=24894"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=24894"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}