{"id":24594,"date":"2014-03-29T16:32:08","date_gmt":"2014-03-29T13:32:08","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=24594"},"modified":"2014-03-29T16:32:08","modified_gmt":"2014-03-29T13:32:08","slug":"petkim-resi-alstom-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/petkim-resi-alstom-kuracak\/","title":{"rendered":"(Turkish) Petkim RES`i Alstom Kuracak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/24594\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Petkim, \u0130zmir Alia\u011fa`da in\u015fa edilecek 51 MW`lik r\u00fczgar santralini 55 milyon Euro bedelle Alstom kuracak. Petkim, SOCAR T\u00fcrkiye\u2019nin \u201cPetkim \u2013 Value Site 2023\u201d vizyonu do\u011frultusunda &#8220;Rafineri- Petrokimya &#8211; Enerji &#8211; Lojistik Entegrasyonu&#8221; kapsam\u0131nda ger\u00e7ekle\u015ftirece\u011fi Petkim R\u00fczgar Enerjisi Santrali yat\u0131r\u0131m\u0131 i\u00e7in Alstom ile anahtar teslimi bir anla\u015fma imzalad\u0131.<\/strong><\/p>\n<p><strong>AL\u0130A\u011eA`DA \u0130MZA T\u00d6REN\u0130 D\u00dcZENLEND\u0130<\/strong><\/p>\n<p>Petkim Alia\u011fa\u2019da d\u00fczenlenen imza t\u00f6renine SOCAR T\u00fcrkiye ile Alstom T\u00fcrkiye\u2019nin \u00fcst d\u00fczey y\u00f6neticileri kat\u0131l\u0131rken imzalar\u0131<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/petkim-resi-alstom-kuracak.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-24595\" title=\"petkim-resi-alstom-kuracak\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/petkim-resi-alstom-kuracak-300x213.jpg\" alt=\"\" width=\"300\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/petkim-resi-alstom-kuracak-300x213.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/petkim-resi-alstom-kuracak-70x50.jpg 70w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/petkim-resi-alstom-kuracak.jpg 387w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a> SOCAR T\u00fcrkiye Y\u00f6netim Kurulu Ba\u015fkan\u0131 ve Petkim Y\u00f6netim Kurulu Ba\u015fkan\u0131 Vagif Aliyev, SOCAR T\u00fcrkiye Ba\u015fkan\u0131 Kenan Yavuz, Alstom Power R\u00fczg\u00e2r \u0130\u015fkolu Proje Direkt\u00f6r\u00fc Laurent Verdier ve Alstom T\u00fcrkiye \u00dclke Ba\u015fkan\u0131 Adil Tekin att\u0131.<\/p>\n<p><strong>YAVUZ: YEN\u0130LENEB\u0130L\u0130R ENERJ\u0130 \u00d6NEML\u0130<\/strong><\/p>\n<p>SOCAR T\u00fcrkiye Ba\u015fkan\u0131 Kenan Yavuz &#8220;Enerji \u00fcretimimizi \u00e7e\u015fitlendirecek Petkim RES, uzun vadeli yat\u0131r\u0131m planlar\u0131m\u0131z sonucunda olu\u015fturmak istedi\u011fimiz entegre de\u011fer zincirinin \u00f6nemli bir halkas\u0131n\u0131 temsil ediyor&#8221; dedi. SOCAR T\u00fcrkiye olarak yenilenebilir enerjinin \u00f6nemine inand\u0131klar\u0131n\u0131 belirten Kenan Yavuz, &#8220;Bu inanc\u0131m\u0131z\u0131n bir yans\u0131mas\u0131 olarak da Petkim Yar\u0131madas\u0131\u2019nda Petkim RES yat\u0131r\u0131m\u0131na imza at\u0131yoruz. \u00dclkemizin enerji stratejisinin en ba\u015f\u0131nda gelen yenilenebilir enerjiye destek konusunda SOCAR T\u00fcrkiye olarak \u00fczerimize d\u00fc\u015fen sorumlulu\u011fu yerine getiriyoruz, getirmeye de devam edece\u011fiz&#8221; dedi.<\/p>\n<p><strong>B\u00d6LGEYE UYGUN T\u00dcRB\u0130NLER<\/strong><\/p>\n<p>Alstom T\u00fcrkiye \u00dclke Ba\u015fkan\u0131 Adil Tekin de, Petkim R\u00fczgar Santrali i\u00e7in kullan\u0131lacak Alstom ECO100 platformunda yer alan ECO110 t\u00fcrbinlerinin, sahan\u0131n r\u00fczgar h\u0131z\u0131yla m\u00fckemmel bir uyum sa\u011flad\u0131\u011f\u0131n\u0131 belirtti. Bu uyum sayesinde santralden maksimum verimiin al\u0131nabilece\u011fini kaydeden Tekin, &#8220;Petkim gibi T\u00fcrkiye\u2019nin en \u00f6nemli petrokimya tesisine bu r\u00fczgar t\u00fcrbinlerimizle enerji verece\u011fimiz i\u00e7in gurur duyuyoruz&#8221; dedi.<\/p>\n<p><strong>\u0130LK FAZ 2015`TE DEVREDE<\/strong><\/p>\n<p>Yakla\u015f\u0131k 55 milyon Euro`luk yat\u0131r\u0131mla kurulacak, toplam 51 MW\u2019l\u0131k kurulu g\u00fcce sahip Petkim RES, \u0130zmir Alia\u011fa\u2019daki Petkim Yar\u0131madas\u0131\u2019na in\u015fa edilecek ve tesislerin elektrik enerjisi ihtiyac\u0131n\u0131n kar\u015f\u0131lanmas\u0131nda \u00f6nemli bir yer tutacak. Yar\u0131madan\u0131n yenilenebilir enerji kayna\u011f\u0131 olacak olan Petkim RES\u2019in ilk faz\u0131, 2015 y\u0131l\u0131nda ve ikinci faz\u0131 da 2016\u2019da i\u015fletmeye al\u0131narak yat\u0131r\u0131m tamamlanacak.<\/p>\n<p><strong>17 R\u00dcZGAR T\u00dcRB\u0130N\u0130 D\u0130K\u0130LECEK<\/strong><\/p>\n<p>Santral i\u00e7in her biri 3 MW g\u00fcc\u00fcnde Alstom ECO110[1] t\u00fcrbinleri kullan\u0131lacak. \u0130ki fazda anahtar teslimi olarak in\u015fa edilecek santral i\u00e7in dokuz adet t\u00fcrbin arac\u0131l\u0131\u011f\u0131 ile 27 MW (9 x 3 MW), ikinci faz\u0131nda ise sekiz adet t\u00fcrbin arac\u0131l\u0131\u011f\u0131 ile 24 MW (8 x 3 MW) g\u00fc\u00e7 elde edilecek. Santral tamamland\u0131\u011f\u0131nda yakla\u015f\u0131k 200 GWh enerji \u00fcretebilecek.<\/p>\n<p><strong>ALSTOM 15 YIL BOYUNCA BAKIMI DA YAPACAK<\/strong><\/p>\n<p>Anahtar teslimi RES Projesi olarak in\u015fa edilecek olan santralin t\u00fcm in\u015faat, tedarik ve m\u00fchendislik \u00e7al\u0131\u015fmalar\u0131n\u0131 y\u00fcr\u00fctecek olan Alstom, ayr\u0131ca santrale 15 y\u0131l boyunca servis ve bak\u0131m hizmeti de sunacak. Alstom daha \u00f6nce Petkim Alia\u011fa Kojenerasyon Santrali i\u00e7in buhar t\u00fcrbini temin etmi\u015fti.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.enerjigunlugu.net\/petkim-resi-alstom-kuracak_7756.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Petkim, \u0130zmir Alia\u011fa`da in\u015fa edilecek 51 MW`lik r\u00fczgar santralini 55 milyon Euro bedelle Alstom kuracak. Petkim, SOCAR T\u00fcrkiye\u2019nin \u201cPetkim \u2013 Value Site 2023\u201d [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":24595,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[9503,63,67,1009,165,8105,3106,1568,13897,474,69,16,231,324,1567,105],"views":918,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/24594"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=24594"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/24594\/revisions"}],"predecessor-version":[{"id":24596,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/24594\/revisions\/24596"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/24595"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=24594"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=24594"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=24594"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}