{"id":24445,"date":"2014-03-26T18:30:35","date_gmt":"2014-03-26T15:30:35","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=24445"},"modified":"2014-03-26T19:08:53","modified_gmt":"2014-03-26T16:08:53","slug":"csun-bloomberg-tarafindan-dunya-capinda-1-seviye-tier-1-uretici-secildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/csun-bloomberg-tarafindan-dunya-capinda-1-seviye-tier-1-uretici-secildi\/","title":{"rendered":"(Turkish) CSUN, D\u00fcnya \u00c7ap\u0131nda 1. Seviye (Tier-1) \u00dcretici Se\u00e7ildi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/24445\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>G\u00fcne\u015f h\u00fccreleri ve panelleri \u00fcretiminde faaliyet g\u00f6steren ve Seul Enerji ile birlikte \u0130stanbul Tuzla\u2019da 300MW kapasiteli T\u00fcrkiye\u2019nin ilk g\u00fcne\u015f h\u00fccresi fabrikas\u0131n\u0131 ve en b\u00fcy\u00fck g\u00fcne\u015f paneli fabrikas\u0131n\u0131 hayata ge\u00e7iren CSUN, Bloomberg Yeni Enerji Finans (\u201cBNEF\u201d) G\u00fcne\u015f Paneli \u00dcreticileri Kategorilendirmesinde \u201cTier-1\u201d seviyesinde lanse edildi.\u00a0 BNEF, kapsaml\u0131 g\u00fcne\u015f paneli \u00fcretimi pazar\u0131nda, PV g\u00fcne<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/csun-bloomberg-tarafindan-dunya-capinda-1-seviye-tier-1-uretici-secildi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-24446\" title=\"csun-bloomberg-tarafindan-dunya-capinda-1-seviye-tier-1-uretici-secildi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/csun-bloomberg-tarafindan-dunya-capinda-1-seviye-tier-1-uretici-secildi-300x204.jpg\" alt=\"\" width=\"300\" height=\"204\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/csun-bloomberg-tarafindan-dunya-capinda-1-seviye-tier-1-uretici-secildi-300x204.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/csun-bloomberg-tarafindan-dunya-capinda-1-seviye-tier-1-uretici-secildi-73x50.jpg 73w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/csun-bloomberg-tarafindan-dunya-capinda-1-seviye-tier-1-uretici-secildi.jpg 480w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\u015f paneli \u00fcreticilerinin proje geli\u015ftiriciler, EPC\u2019ler ve yat\u0131r\u0131mc\u0131lar\u0131n kolay ve \u015feffaf bilgiye ula\u015fmas\u0131na ve kredilendirilmesine yard\u0131m gibi temelleri dikkate al\u0131yor.<\/strong><\/p>\n<p>BNEF, ge\u00e7mi\u015f iki y\u0131l i\u00e7erisinde devlet kalk\u0131nma bankas\u0131 olmayan en az 3 farkl\u0131 finans kurulu\u015fu taraf\u0131ndan geri \u00f6demesiz (non-recourse) olarak projelere finans sa\u011flanan \u00fcreticiler aras\u0131ndan belirleniyor. Bu kriterlerde se\u00e7im yap\u0131l\u0131rken geri \u00f6demesiz olarak finanse edilen projelerin ticari ve kurumsal bankalar taraf\u0131ndan de\u011ferlendirilmesi ve dolay\u0131s\u0131yla onlar\u0131n \u00e7ok kat\u0131 kalite standartlar\u0131n\u0131 sa\u011flayan bir \u00fcretici olmas\u0131 gerekiyor BNEF y\u00f6neticisi Jenny Chase konu ile ilgili ; \u201c BNEF olarak CSUN\u2019\u0131 Tier-1 \u00fcretici olarak memnuniyetle onayl\u0131yoruz ve bunu 2014 G\u00fcne\u015f Enerjisi Pazar\u0131 yay\u0131n\u0131m\u0131zda da yay\u0131nlayarak duyuraca\u011f\u0131z\u201d \u015feklinde ifade etti.<\/p>\n<p>CSUN\u2019\u0131n CEO\u2019su Stephen Cai ise \u201c Tier-1 seviyesinde \u00fcretici olarak lanse edilmek, y\u00fcksek kalite \u00fcr\u00fcnler sunan, yat\u0131r\u0131mc\u0131lar ve m\u00fc\u015fterilerimiz i\u00e7in g\u00fcvenli bir tercih unsuru olan CSUN\u2019\u0131n s\u00fcrekli geli\u015fen k\u00fcresel stratejisinin \u00f6nemli bir kilometre ta\u015flar\u0131ndan birisidir\u201d \u015feklinde belirtti. \u0130lave olarak Cai, \u201cTier-1 seviyesinde olmak, proje geli\u015ftirenler ve EPC m\u00fc\u015fterilerimiz i\u00e7in finansal kaynaklara daha rahat ve g\u00fcvenle ula\u015f\u0131lmas\u0131n\u0131 kolayla\u015ft\u0131racakt\u0131r. BNEF derecelendirme sistemi ise b\u00fct\u00fcn m\u00fc\u015fterilerimiz taraf\u0131ndan g\u00fcvenli bir de\u011ferlendirme arac\u0131 olarak kabul edilmektedir.\u201d<\/p>\n<p>Yay\u0131nc\u0131: <a href=\"https:\/\/www.enerjigazetesi.ist\" target=\"_blank\">Enerji Gazetesi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.G\u00fcne\u015f h\u00fccreleri ve panelleri \u00fcretiminde faaliyet g\u00f6steren ve Seul Enerji ile birlikte \u0130stanbul Tuzla\u2019da 300MW kapasiteli T\u00fcrkiye\u2019nin ilk g\u00fcne\u015f h\u00fccresi fabrikas\u0131n\u0131 ve en [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":24446,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[13816,4559,7603,63,67,1009,165,227,13,13815,13817,1405,5499,1329,13818],"views":954,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/24445"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=24445"}],"version-history":[{"count":6,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/24445\/revisions"}],"predecessor-version":[{"id":24474,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/24445\/revisions\/24474"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/24446"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=24445"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=24445"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=24445"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}