{"id":24236,"date":"2014-03-21T17:21:25","date_gmt":"2014-03-21T14:21:25","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=24236"},"modified":"2014-03-21T17:21:25","modified_gmt":"2014-03-21T14:21:25","slug":"orduda-16-yilda-tamamlanan-baraj-ve-hes-uretime-basliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/orduda-16-yilda-tamamlanan-baraj-ve-hes-uretime-basliyor\/","title":{"rendered":"(Turkish) Ordu\u2019da 16 Y\u0131lda Tamamlanan Baraj ve HES \u00dcretime Ba\u015fl\u0131yor&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/24236\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ordu\u2019nun Mesudiye \u0130l\u00e7esi Top\u00e7am Beldesi\u2019nde Melet Irma\u011f\u0131 \u00fczerinde yap\u0131m\u0131 16 y\u0131lda tamamlanan Top\u00e7am Baraj\u0131 ve 3 \u00fcniteli Hidroelektrik Santrali (HES), Mart ay\u0131 sonu itibariyle \u00fcretime ge\u00e7ecek. Ordu Valisi Kenan \u00c7ift\u00e7i, 2014 y\u0131l\u0131 rakamlar\u0131yla 350 milyon TLye mal olan baraj ve HESin y\u0131ll\u0131k 198 milyon kilowat saat enerji \u00fcretimi yaparak \u00fclke ekonomisine y\u0131lda 198 milyon TL katk\u0131 sa\u011flayaca\u011f\u0131n\u0131 s\u00f6yledi.<\/strong><\/p>\n<p>Devlet Su \u0130\u015fleri ( DS\u0130 ) Samsun 7nci B\u00f6lge M\u00fcd\u00fcrl\u00fc\u011f\u00fc taraf\u0131ndan Ordunun Mesudiye \u0130l\u00e7esine ba\u011fl\u0131 Top\u00e7am Beldesinden ge\u00e7en Melet Irma\u011f\u0131 \u00fczerine baraj ve 3 \u00fcniteli HES kurulmas\u0131 i\u00e7in 16 y\u0131l \u00f6nce \u00e7al\u0131\u015fma ba\u015flat\u0131ld\u0131. Kil \u00e7ekirdekli kaya dolgu tipinde g\u00f6vde yap\u0131m\u0131 6 y\u0131l \u00f6nce tamamlanarak su tutmaya ba\u015flayan 122 metre y\u00fcksekli\u011finde Top\u00e7am Baraj\u0131 ve 3 \u00fcniteden olu\u015fan Top\u00e7am HES \u00fcretim i\u00e7in g\u00fcn sayarken trib\u00fcn imalat \u00e7al\u0131\u015fmalar\u0131nda da son a\u015famaya gelindi.<\/p>\n<h2>Y\u0131lda 198 milyon kilovat saat enerji \u00fcretecek<\/h2>\n<p>Ordu Valisi Kenan \u00c7ift\u00e7i 133 milyon metre k\u00fcp suyun depolanaca\u011f\u0131 barajda, 60 megawat kurulu g\u00fc\u00e7le 3 \u00fcniteli Top\u00e7am HESte y\u0131lda 198 milyon kilowat saat enerji \u00fcretilece\u011fin<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/orduda-16-yilda-tamamlanan-baraj-ve-hes-uretime-basliyor.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-24237\" title=\"orduda-16-yilda-tamamlanan-baraj-ve-hes-uretime-basliyor\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/orduda-16-yilda-tamamlanan-baraj-ve-hes-uretime-basliyor-300x201.jpg\" alt=\"\" width=\"300\" height=\"201\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/orduda-16-yilda-tamamlanan-baraj-ve-hes-uretime-basliyor-300x201.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/orduda-16-yilda-tamamlanan-baraj-ve-hes-uretime-basliyor-74x50.jpg 74w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/orduda-16-yilda-tamamlanan-baraj-ve-hes-uretime-basliyor.jpg 475w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>i s\u00f6yledi. Top\u00e7am HESte trib\u00fcn montaj \u00e7al\u0131\u015fmalar\u0131n\u0131n son a\u015famaya geldi\u011fini, bir \u00fcnitenin 31 Martta enerji \u00fcretimine ba\u015flayaca\u011f\u0131n\u0131 belirten Vali \u00c7if\u00e7i, \u201cMelet Irma\u011f\u0131 \u00fczerinde yap\u0131m \u00e7al\u0131\u015fmas\u0131 ba\u015flayan ve kil \u00e7ekirdekli kaya dolgu olarak in\u015faa edilen Top\u00e7am Baraj\u0131 16 y\u0131lda tamamland\u0131. 6 y\u0131l \u00f6nce baraj g\u00f6vdesi bitirilerek su tutmaya ba\u015flam\u0131\u015ft\u0131. Top\u00e7am Baraj\u0131ndan Top\u00e7am HESe 7.5 kilometre mesafeden beton enerji t\u00fcneli ile su aktar\u0131lacak.<\/p>\n<p>133 milyon metre k\u00fcp su depolanacak olan barajda ve 3 \u00fcniteden olu\u015fan toplam 60 megawat kurulu g\u00fcce sahip olan Top\u00e7am HESte y\u0131lda 198 milyon kilowat saat enerji \u00fcretilecek. Top\u00e7am Baraj\u0131 ve HES projeleri kamula\u015ft\u0131rma, in\u015faat i\u015fleri ve elektromekanik i\u015fi dahil 2014 y\u0131l\u0131 rakamlar\u0131yla yakla\u015f\u0131k 350 milyon TLye mal oldu. Top\u00e7am HESin bir \u00fcnitesi 31 Martta \u00fcretime ba\u015fl\u0131yor, di\u011fer iki \u00fcnitesi ise May\u0131s ve Haziran aylar\u0131nda \u00fcretime ge\u00e7ecek\u201d dedi.<\/p>\n<h2>Ordu\u2019da 41 HES projesi var<\/h2>\n<p>Vali Kenan \u00c7ift\u00e7i Orduda 41 HES projesi oldu\u011funu, bunlardan 6s\u0131n\u0131n i\u015fletme, 7sinin in\u015faat, 28inin ise proje planlama a\u015famas\u0131nda oldu\u011funu da vurgulayarak HES Projelerinden 815 megavat g\u00fc\u00e7le 2 bin 763 gigavatsaat enerji \u00fcretimi planland\u0131\u011f\u0131n\u0131 da kaydetti. \u00c7ift\u00e7i, mevcut elektrik \u00fcretiminin T\u00fcrkiye \u00fcretiminin y\u00fczde 0.13\u00fcn\u00fc kar\u015f\u0131lad\u0131\u011f\u0131n\u0131, t\u00fcm HES projeleri tamamland\u0131\u011f\u0131nda Ordunun T\u00fcrkiye elektrik \u00fcretimi i\u00e7indeki pay\u0131n\u0131n ise y\u00fczde 1.15 olaca\u011f\u0131n\u0131 da s\u00f6zlerine ekledi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.sanliurfa.com\/haber171510-16_Yilda_Tamamlanan_Baraj_Ve_Hes_Uretime_Basliyor_.htm\" target=\"_blank\">\u015eanl\u0131urfa<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ordu\u2019nun Mesudiye \u0130l\u00e7esi Top\u00e7am Beldesi\u2019nde Melet Irma\u011f\u0131 \u00fczerinde yap\u0131m\u0131 16 y\u0131lda tamamlanan Top\u00e7am Baraj\u0131 ve 3 \u00fcniteli Hidroelektrik Santrali (HES), Mart ay\u0131 sonu [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":24237,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[1990,19,63,67,1009,165,18,35370,9810,1090,13715,13713,7163,7162,13714],"views":2123,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/24236"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=24236"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/24236\/revisions"}],"predecessor-version":[{"id":24239,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/24236\/revisions\/24239"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/24237"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=24236"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=24236"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=24236"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}