{"id":24213,"date":"2014-03-21T11:27:49","date_gmt":"2014-03-21T08:27:49","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=24213"},"modified":"2014-03-21T11:27:49","modified_gmt":"2014-03-21T08:27:49","slug":"first-solar-urdunde-52-mw-gunes-santrali-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/first-solar-urdunde-52-mw-gunes-santrali-kuracak\/","title":{"rendered":"(Turkish) First Solar \u00dcrd\u00fcn\u2019de 52 MW G\u00fcne\u015f Santrali Kuracak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/24213\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>First Solar ve Shams Ma\u2019an \u00dcrd\u00fcn\u2019de in\u015fa edecekleri 52.5 MW\u2019l\u0131k g\u00fcne\u015f enerjisi santrali i\u00e7in elektrik sat\u0131n al\u0131m anla\u015fmas\u0131 imzalad\u0131lar. Amerikan g\u00fcne\u015f paneli \u00fcreticisi First Solar ve \u00dcrd\u00fcnl\u00fc orta\u011f\u0131 Shams Ma\u2019an, \u00dcrd\u00fcn d\u00fczenleme otoritesi Ulusal Elektrik Enerjisi \u015eirketi ile 20 y\u0131ll\u0131k bir sat\u0131n al\u0131m anla\u015fmas\u0131 imzalad\u0131lar.<\/strong><\/p>\n<p><strong>PROJE 500 K\u0130\u015e\u0130L\u0130K \u0130ST\u0130HDAM SA\u011eLAYACAK<\/strong><br \/>\n52.5 MW\u2019l\u0131k g\u00fcne\u015f enerjisi santrali kurma projesi G\u00fcney \u00dcrd\u00fcn\u2019de ekonomik kalk\u0131nma giri\u015fimi olan Ma\u2019an geli\u015fme alan\u0131 inisiyatifinin bir par\u00e7as\u0131. Projenin in\u015fas\u0131 esnas\u0131nda 500 ki\u015filik bir istihdam sa\u011flanacak.<\/p>\n<p><strong>PROJE \u00dcRD\u00dcN\u2019\u00dcN ENERJ\u0130 BA\u011eIMSIZLI\u011eININ TEMS\u0130L\u0130<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/dunyanin-en-yuksek-gunes-santrali-tamamland.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-19347\" title=\"gunes-enerjisi-santrali-GES\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/dunyanin-en-yuksek-gunes-santrali-tamamland-300x192.jpg\" alt=\"\" width=\"300\" height=\"192\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/dunyanin-en-yuksek-gunes-santrali-tamamland-300x192.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/dunyanin-en-yuksek-gunes-santrali-tamamland-500x320.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/dunyanin-en-yuksek-gunes-santrali-tamamland-77x50.jpg 77w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/dunyanin-en-yuksek-gunes-santrali-tamamland.jpg 642w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><br \/>\nSham Ma\u2019an CEO\u2019su Hanna Zaglul yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, Sham Ma\u2019an g\u00fcne\u015f santralinin \u00dcrd\u00fcn\u2019\u00fcn enerji ba\u011f\u0131ms\u0131zl\u0131\u011f\u0131n\u0131n gelece\u011fini temsil etti\u011fini belirterek, sekt\u00f6r\u00fcn \u00f6nde gelen yeteneklerini,Uluslararas\u0131 finansman ve yerel ko\u015fullara tam uyan geli\u015fmi\u015f ince film teknolojisini bir araya getirerek ba\u011f\u0131ms\u0131z elektrik \u00fcretimi i\u00e7in b\u00f6lgesel bir kriter noktas\u0131 olu\u015fturduklar\u0131n\u0131 s\u00f6yledi.<\/p>\n<p><strong>F\u0130RST SOLAR \u0130NCE F\u0130LM MOD\u00dcL SA\u011eLAYACAK<\/strong><br \/>\nSham Ma\u2019an Power Generation\u2019da hisse sahibi olan First Solar,m\u00fchendislik,tedarik ve y\u00fcklenici firma olarak projeye ince film mod\u00fclleri temin edecek ve projenin bak\u0131m\u0131n\u0131 sa\u011flayacak.<\/p>\n<p><strong>ENERJ\u0130 G\u00dcVENL\u0130\u011e\u0130NDE \u0130LK ADIM<\/strong><br \/>\nFirst Solar Orta Do\u011fu \u0130\u015f Geli\u015ftirme Ba\u015fkan yard\u0131mc\u0131s\u0131 Ahmed S. Nada, bu anla\u015fman\u0131n \u00dcrd\u00fcn\u2019\u00fcn enerji g\u00fcvenli\u011fi hedeflerini ger\u00e7ekle\u015ftirmede ilk ad\u0131m oldu\u011funu belirterek, \u201c \u00dclkenin en bol enerji kayna\u011f\u0131n\u0131 etkili bir \u015fekilde de\u011ferlendirerek Shams Ma\u2019an temiz, ekonomik ve g\u00fcvenilir g\u00fcne\u015f enerjisi ile enerjide s\u00fcrd\u00fcr\u00fclebilir b\u00fcy\u00fcme ve ilerlemeye yard\u0131mc\u0131 olacak\u201d dedi.<\/p>\n<p>\u00dcrd\u00fcn h\u00fck\u00fcmeti ge\u00e7en ay toplam 200 MW\u2019l\u0131k yedi proje i\u00e7in sat\u0131n al\u0131m anla\u015fmas\u0131 ko\u015fullar\u0131n\u0131 tamamlad\u0131\u011f\u0131n\u0131 duyurmu\u015ftu.<\/p>\n<p>\u00dcrd\u00fcn\u2019de elektrik fiyatlar\u0131 \u00e7ok y\u00fcksek ve s\u0131k s\u0131k elektrik kesintisi ya\u015fan\u0131yor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.enerjigunlugu.net\/first-solar-urdunde-52-mw-gunes-santrali-kuracak_7643.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.First Solar ve Shams Ma\u2019an \u00dcrd\u00fcn\u2019de in\u015fa edecekleri 52.5 MW\u2019l\u0131k g\u00fcne\u015f enerjisi santrali i\u00e7in elektrik sat\u0131n al\u0131m anla\u015fmas\u0131 imzalad\u0131lar. Amerikan g\u00fcne\u015f paneli \u00fcreticisi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":19347,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[13700,1768,13696,343,13701,63,3196,67,1009,165,13694,2326,227,13,2569,13699,13698,13695,13697,1593],"views":825,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/24213"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=24213"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/24213\/revisions"}],"predecessor-version":[{"id":24214,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/24213\/revisions\/24214"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/19347"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=24213"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=24213"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=24213"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}