{"id":24053,"date":"2014-03-18T18:17:21","date_gmt":"2014-03-18T15:17:21","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=24053"},"modified":"2014-03-18T18:17:21","modified_gmt":"2014-03-18T15:17:21","slug":"suudi-arabistandan-gunes-enerjisi-ihalesi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/suudi-arabistandan-gunes-enerjisi-ihalesi\/","title":{"rendered":"(Turkish) Suudi Arabistan\u2019dan G\u00fcne\u015f Enerjisi \u0130halesi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/24053\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Suudi Arabistan bu y\u0131l\u0131n sonuna kadar 1 GW\u2019l\u0131k g\u00fcne\u015f enerjisi ihalesi yapacak. Orta Do\u011fu G\u00fcne\u015f Enerjisi End\u00fcstrisi Birli\u011fi (MESIA) Ba\u015fkan\u0131 Vahid Fotuhi Suudi Arabistan devletinin bu y\u0131l\u0131n sonuna kadar 700-1000 MW kapasitesinde g\u00fcne\u015f enerjisi ihalesi a\u00e7aca\u011f\u0131n\u0131 s\u00f6yledi.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/suudi-arabistandan-gunes-enerjisi-ihalesi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-24054\" title=\"suudi-arabistandan-gunes-enerjisi-ihalesi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/suudi-arabistandan-gunes-enerjisi-ihalesi-300x199.jpg\" alt=\"\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/suudi-arabistandan-gunes-enerjisi-ihalesi-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/suudi-arabistandan-gunes-enerjisi-ihalesi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/suudi-arabistandan-gunes-enerjisi-ihalesi.jpg 409w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p><strong>HEDEF 40-42 GW<\/strong><br \/>\nVahid Fotuhi konuyla ilgili olarak yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, Suudi devletinin bu y\u0131l bu ihaleyi yapmak istedi\u011fini belirterek, her\u015fey haz\u0131r oldu\u011funda y\u0131l sonuna kadar a\u00e7\u0131klanan projelerin tan\u0131t\u0131m turlar\u0131n\u0131 yapacaklar\u0131n\u0131 ve bunun da 700-1000 MW aras\u0131nda olaca\u011f\u0131n\u0131 s\u00f6yledi. Ayr\u0131ca devletin 40-42 GW hedefledi\u011fini ve bu 1 GW\u2019\u0131n \u00e7ok da b\u00fcy\u00fck bir kapasite olmad\u0131\u011f\u0131n\u0131 ama Suudi Arabistan ve Orta Do\u011fu i\u00e7in heyecan verici bir b\u00f6l\u00fcm\u00fcn ba\u015flang\u0131c\u0131 oldu\u011funu da s\u00f6zlerine ekledi.<\/p>\n<p>Suudi Arabistan uzun vadede g\u00fcne\u015f enerjisine 109 milyar dolardan fazla yat\u0131r\u0131m yapmak istiyor, ancak g\u00f6zle g\u00f6r\u00fcl\u00fcr geli\u015fmeler olduk\u00e7a az&#8230;<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.enerjigunlugu.net\/suudi-arabistandan-gunes-enerjisi-ihalesi_7605.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Suudi Arabistan bu y\u0131l\u0131n sonuna kadar 1 GW\u2019l\u0131k g\u00fcne\u015f enerjisi ihalesi yapacak. Orta Do\u011fu G\u00fcne\u015f Enerjisi End\u00fcstrisi Birli\u011fi (MESIA) Ba\u015fkan\u0131 Vahid Fotuhi Suudi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":24054,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1009,165,227,13,13593,13595,2534,13594,1463,13596],"views":855,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/24053"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=24053"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/24053\/revisions"}],"predecessor-version":[{"id":24055,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/24053\/revisions\/24055"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/24054"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=24053"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=24053"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=24053"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}