{"id":23805,"date":"2014-03-12T17:14:16","date_gmt":"2014-03-12T14:14:16","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=23805"},"modified":"2014-03-12T17:14:16","modified_gmt":"2014-03-12T14:14:16","slug":"rwe-yaz-aylarinda-soluklanacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/rwe-yaz-aylarinda-soluklanacak\/","title":{"rendered":"(Turkish) RWE Yaz Aylar\u0131nda Soluklanacak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/23805\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>RWE Generation, yaz aylar\u0131nda Lingen CCGT elektrik Santralinde \u00fcretime ara verecek. D\u00fcn \u015firket taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamada, Almanya\u2019n\u0131n Emsland b\u00f6lgesindeki Lingen Kombine do\u011falgaz t\u00fcrbini ele<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/rwe-yaz-aylarinda-soluklanacak.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-23806\" title=\"rwe-yaz-aylarinda-soluklanacak\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/rwe-yaz-aylarinda-soluklanacak-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/rwe-yaz-aylarinda-soluklanacak-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/rwe-yaz-aylarinda-soluklanacak-74x50.jpg 74w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/rwe-yaz-aylarinda-soluklanacak.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>ktrik Santrali\u2019nin (CCGT),\u00f6n\u00fcm\u00fczdeki aylarda g\u00fcne\u015f enerjisi santrallerinde elektrik \u00fcretiminin artaca\u011f\u0131 beklentisi ve buna ba\u011fl\u0131 olarak olu\u015fan d\u00fc\u015f\u00fck toptan piyasa fiyat\u0131 nedeniyle 1 May\u0131s ile 31 A\u011fustos tarihleri aras\u0131nda \u015febeke ile ba\u011flant\u0131s\u0131n\u0131n kesilece\u011fi duyuruldu.<\/strong><\/p>\n<p>A\u00e7\u0131klamada, \u015firketin ge\u00e7en yaz Lingen alan\u0131ndaki iki eski do\u011falgaz yak\u0131tl\u0131 elektrik Santrali olan Emsland B ve C\u2019deki \u00fcretimi ge\u00e7ici olarak durdurma karar\u0131 ald\u0131\u011f\u0131 belirtiliyor.<\/p>\n<p>\u015eirketin 500 milyon Euro yat\u0131r\u0131m yapt\u0131\u011f\u0131 santral 2010 Eyl\u00fcl ay\u0131nda ticari faaliyetine ba\u015flad\u0131. Santalin kapasitesi 876 MW ve % 60 verimlilik ile \u00e7al\u0131\u015f\u0131yor.<\/p>\n<p>Oxford \u00dcniverisitesi\u2019nde yap\u0131lan bir ara\u015ft\u0131rmaya g\u00f6re, ge\u00e7en y\u0131l Avrupa elektrik \u00fcretim santrallerinin % 12\u2019si kapat\u0131ld\u0131. De\u011fi\u015fen piyasa ko\u015fullar\u0131 sonucunda 2013 y\u0131l\u0131nda 21.3 GW\u2019l\u0131k gaz yak\u0131tl\u0131 en b\u00fcy\u00fck on istasyon ge\u00e7ici olarak \u00fcretime ara verdi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.enerjigunlugu.net\/rwe-yazin-soluklanacak_7511.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.RWE Generation, yaz aylar\u0131nda Lingen CCGT elektrik Santralinde \u00fcretime ara verecek. D\u00fcn \u015firket taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamada, Almanya\u2019n\u0131n Emsland b\u00f6lgesindeki Lingen Kombine do\u011falgaz t\u00fcrbini [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":23806,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[13465,13467,68,61,13466,63,67,1009,165,1325,13464,13462,3242,13461,13463],"views":799,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/23805"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=23805"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/23805\/revisions"}],"predecessor-version":[{"id":23808,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/23805\/revisions\/23808"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/23806"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=23805"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=23805"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=23805"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}