{"id":23768,"date":"2014-03-11T17:28:30","date_gmt":"2014-03-11T14:28:30","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=23768"},"modified":"2014-03-11T17:28:30","modified_gmt":"2014-03-11T14:28:30","slug":"boydak-enerji-firtina-elektrik-uretim-sirketini-satin-aldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/boydak-enerji-firtina-elektrik-uretim-sirketini-satin-aldi\/","title":{"rendered":"(Turkish) Boydak Enerji, F\u0131rt\u0131na Elektrik \u00dcretim \u015eirketi\u2019ni Sat\u0131n Ald\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/23768\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Boydak Enerji, 21.6 megavat b\u00fcy\u00fckl\u00fc\u011f\u00fcndeki S\u00fcmer Hidroelektrik Santrali\u2019nin t\u00fcm haklar\u0131na sahip F\u0131rt\u0131na Elektrik \u00dcretim \u015eirketi\u2019ni b\u00fcnyesine <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/boydak-enerji-firtina-elektrik-uretim-sirketini-satin-aldi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-23769\" title=\"boydak-enerji-firtina-elektrik-uretim-sirketini-satin-aldi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/boydak-enerji-firtina-elektrik-uretim-sirketini-satin-aldi-300x198.jpg\" alt=\"\" width=\"300\" height=\"198\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/boydak-enerji-firtina-elektrik-uretim-sirketini-satin-aldi-300x198.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/boydak-enerji-firtina-elektrik-uretim-sirketini-satin-aldi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/boydak-enerji-firtina-elektrik-uretim-sirketini-satin-aldi.jpg 473w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>katt\u0131. B\u00f6ylece, Boydak Enerji\u2019nin portf\u00f6y b\u00fcy\u00fckl\u00fc\u011f\u00fc 428 megavata ula\u015ft\u0131. Mobilya, kablo tel, demir \u00e7elik, tekstil-kimya, lojistik, havac\u0131l\u0131k, finans ve enerji alanlar\u0131nda 8 sekt\u00f6rde, 43 \u015firketi ile faaliyet g\u00f6steren Boydak Holding\u2019e ba\u011fl\u0131 Boydak Enerji, 2014 y\u0131l\u0131nda da yat\u0131r\u0131mlar yap\u0131yor.<\/strong><\/p>\n<p>Boydak Enerji Genel M\u00fcd\u00fcr\u00fc G\u00fcltekin Eran\u0131l, Boydak Enerji\u2019nin yeni sat\u0131n almalarla b\u00fcy\u00fcd\u00fc\u011f\u00fcn\u00fc ve son sat\u0131n alma ile 203 megavat\u0131 i\u015fletmede, toplam 428 megavatl\u0131k portf\u00f6y b\u00fcy\u00fckl\u00fc\u011f\u00fcne ula\u015ft\u0131\u011f\u0131n\u0131 belirten \u015f\u00f6yle devam etti:<\/p>\n<p>\u201cDevam eden di\u011fer projelerle birlikte ilk a\u015famada 2015 y\u0131l\u0131 sonuna kadar 500 megavat kurulu g\u00fcce ula\u015fmay\u0131 hedefliyoruz. 2017 sonuna kadar ise 1000 megavatl\u0131k portf\u00f6y b\u00fcy\u00fckl\u00fc\u011f\u00fc ile sekt\u00f6r\u00fcm\u00fczdeki liderlik hedefine daha \u00e7ok yakla\u015fm\u0131\u015f olaca\u011f\u0131z.\u201d<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.haber3.com\/boydak-enerji-firtina-elektriki-aldi-2537116h.htm\" target=\"_blank\">Haber3<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Boydak Enerji, 21.6 megavat b\u00fcy\u00fckl\u00fc\u011f\u00fcndeki S\u00fcmer Hidroelektrik Santrali\u2019nin t\u00fcm haklar\u0131na sahip F\u0131rt\u0131na Elektrik \u00dcretim \u015eirketi\u2019ni b\u00fcnyesine katt\u0131. B\u00f6ylece, Boydak Enerji\u2019nin portf\u00f6y b\u00fcy\u00fckl\u00fc\u011f\u00fc 428 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":23769,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[6698,68,61,19,63,67,1009,165,13434,6699,1339,13433],"views":860,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/23768"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=23768"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/23768\/revisions"}],"predecessor-version":[{"id":23771,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/23768\/revisions\/23771"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/23769"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=23768"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=23768"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=23768"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}