{"id":23503,"date":"2014-03-06T10:32:44","date_gmt":"2014-03-06T07:32:44","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=23503"},"modified":"2014-03-06T10:32:44","modified_gmt":"2014-03-06T07:32:44","slug":"izmire-gunesten-ormanlar-projesiyle-500-kilowatlik-gunes-sistemi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/izmire-gunesten-ormanlar-projesiyle-500-kilowatlik-gunes-sistemi\/","title":{"rendered":"(Turkish) \u0130zmir\u2019e \u2018G\u00fcne\u015ften Ormanlar\u2019 Projesiyle, 500 Kilowatl\u0131k G\u00fcne\u015f Sistemi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/23503\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ege Orman Vakf\u0131\u2019n\u0131n \u0130zmir Kalk\u0131nma Ajans\u0131\u2019ndan (\u0130ZKA) destek alarak hayata ge\u00e7irdi\u011fi \u201cG\u00fcne\u015ften Ormanlar\u2019 projesi kapsam\u0131nda, 500 kilowatl\u0131k G\u00fcne\u015f Enerji Sistemi kuruluyor. Projeyle, Menderes-Pancar\u2019da kiralanan arazide g\u00fcne\u015ften elektrik \u00fcretilecek. Gelirle yeni orman alanlar\u0131 olu\u015fturulacak.<\/strong><\/p>\n<p>Ege Orman Vakf\u0131\u2019n\u0131n \u0130ktisadi \u0130\u015fletmesi EGEVAK taraf\u0131ndan \u0130ZKA\u2019ya sunulan ve onaylanan \u201cG\u00fcne\u015ften Ormanlar\u2019 projesi kapsam\u0131nda; Merk Solar Enerji \u00c7\u00f6z\u00fcmleri San. ve Tic. A.\u015e. \u201c500 kilowatl\u0131k G\u00fcne\u015f Enerji Sistemi\u2019nin kurulumu i\u00e7in a\u00e7\u0131lan ihaleyi kazanm\u0131\u015ft\u0131. Vakf\u0131n \u0130ktisadi \u0130\u015fletmesi E<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/izmire-gunesten-ormanlar-projesiyle-500-kilowatlik-gunes-enerji-sistemi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-23504\" title=\"izmire-gunesten-ormanlar-projesiyle-500-kilowatlik-gunes-enerji-sistemi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/izmire-gunesten-ormanlar-projesiyle-500-kilowatlik-gunes-enerji-sistemi-300x211.jpg\" alt=\"\" width=\"300\" height=\"211\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/izmire-gunesten-ormanlar-projesiyle-500-kilowatlik-gunes-enerji-sistemi-300x211.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/izmire-gunesten-ormanlar-projesiyle-500-kilowatlik-gunes-enerji-sistemi-70x50.jpg 70w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/izmire-gunesten-ormanlar-projesiyle-500-kilowatlik-gunes-enerji-sistemi.jpg 440w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>GEVAK ve Merk Solar Enerji aras\u0131nda imzalanan s\u00f6zle\u015fmenin ard\u0131ndan \u201cG\u00fcne\u015f Enerji Sistemi\u2019nin kurulumu i\u00e7in saha haz\u0131rl\u0131k \u00e7al\u0131\u015fmalar\u0131 ba\u015flad\u0131. Kurulum \u00e7al\u0131\u015fmalar\u0131 25 May\u0131s 2014 tarihine kadar tamamlanacak.<\/p>\n<h2>Enerji tar\u0131msal sulamada kullan\u0131lacak<\/h2>\n<p>G\u00fcne\u015ften Ormanlar projesi ile ilgili bilgi veren Ege Orman Vakf\u0131 \u0130ktisadi \u0130\u015fletmesi EGEVAK\u2019\u0131n Proje Koordinat\u00f6r\u00fc Kadir Bilgili, \u201cProjenin toplam b\u00fct\u00e7esi 1 milyon 868 bin TL. bu rakam\u0131n y\u00fczde 50\u2032sini \u0130ZKA kar\u015f\u0131l\u0131yor. Proje kapsam\u0131nda, Menderes-Pancar\u2019da kiralanan arazide g\u00fcne\u015f enerjisinden 800 bin kilowat elektrik enerjisi \u00fcretilecek. \u00dcretti\u011fimiz elektri\u011fin bir b\u00f6l\u00fcm\u00fc ile Menderes-O\u011flananas\u0131\u2019nda bulunan 30 bin a\u011fa\u00e7l\u0131k zeytinli\u011fimizin tar\u0131msal sulamas\u0131 i\u00e7in kullan\u0131lan elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131lay\u0131p, ihtiya\u00e7 fazlas\u0131 \u00fcretilen elektri\u011fi de GED\u0130Z EDA\u015e\u2019a sataca\u011f\u0131z. Satt\u0131\u011f\u0131m\u0131z elektrik enerjisinden gelen gelirle yeni orman alanlar\u0131 olu\u015fturup, g\u00fcne\u015fin ormanlar\u0131n\u0131 kuraca\u011f\u0131z\u201d diye konu\u015ftu.<\/p>\n<h2>B\u00f6lgedeki sanayicilere de \u00f6rnek olacak<\/h2>\n<p>Proje ile \u00fclkeye yeni orman alanlar\u0131 kazand\u0131rman\u0131n yan\u0131nda var olan a\u011fa\u00e7lar\u0131n korunmas\u0131na y\u00f6nelik bir etki de sa\u011flayacaklar\u0131n\u0131 ifade eden Bilgili, \u201cKurulum sahas\u0131ndaki y\u0131ll\u0131k elektrik enerjisi \u00fcretimi yakla\u015f\u0131k 800 bin kilowat olarak ger\u00e7ekle\u015fecek. Bu miktarda enerji \u00fcretimi, y\u0131ll\u0131k 502 bin 204 kilogram karbon sal\u0131m\u0131n\u0131n engellenmesi anlam\u0131na gelmektedir. Bu da y\u0131ll\u0131k yakla\u015f\u0131k olarak 1100 adet a\u011fac\u0131n kurtar\u0131lmas\u0131n\u0131 sa\u011flayacak. Fotovoltaik g\u00fc\u00e7 sistemlerinin \u00f6mr\u00fc 30 senedir. Bu zaman i\u00e7inde g\u00fcne\u015f parlayarak Ege Orman Vakf\u0131\u2019n\u0131n daha fazla ormanla\u015ft\u0131rma ve e\u011fitim projelerini ger\u00e7ekle\u015ftirmesini sa\u011flayacak\u201d dedi.<\/p>\n<p>Kadir Bilgili, projenin b\u00f6lgeye \u00f6rnek te\u015fkil edecek bir yat\u0131r\u0131m modeli olu\u015fturaca\u011f\u0131n\u0131, \u00f6zellikle sanayicilerin ihtiya\u00e7 duyduklar\u0131 elektrik enerjilerini bo\u015f at\u0131l duran \u00e7at\u0131lar\u0131nda veya arazilerinde ger\u00e7ekle\u015ftirmeleri konusunda \u00f6zendirici olaca\u011f\u0131n\u0131 ve fosil enerji kaynaklar\u0131n\u0131n sebep oldu\u011fu \u00e7evre sorunlar\u0131n\u0131n \u00f6nlemesinde model olaca\u011f\u0131n\u0131 belirtti.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.radikal.com.tr\/cevre\/izmir_gunesten_orman_uretecek-1179668\" target=\"_blank\">Radikal<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ege Orman Vakf\u0131\u2019n\u0131n \u0130zmir Kalk\u0131nma Ajans\u0131\u2019ndan (\u0130ZKA) destek alarak hayata ge\u00e7irdi\u011fi \u201cG\u00fcne\u015ften Ormanlar\u2019 projesi kapsam\u0131nda, 500 kilowatl\u0131k G\u00fcne\u015f Enerji Sistemi kuruluyor. Projeyle, Menderes-Pancar\u2019da [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":23504,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[13290,12455,5070,63,67,1009,165,502,227,939,13,13288,5411,1429,2328,13289],"views":850,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/23503"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=23503"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/23503\/revisions"}],"predecessor-version":[{"id":23505,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/23503\/revisions\/23505"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/23504"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=23503"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=23503"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=23503"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}