{"id":23405,"date":"2014-03-04T10:52:40","date_gmt":"2014-03-04T07:52:40","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=23405"},"modified":"2014-03-04T10:52:40","modified_gmt":"2014-03-04T07:52:40","slug":"akkuyu-ngsnin-insaatinin-yuzde-80ini-turk-firmalari-yapacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngsnin-insaatinin-yuzde-80ini-turk-firmalari-yapacak\/","title":{"rendered":"(Turkish) Akkuyu NGS\u2019nin \u0130n\u015faat\u0131n\u0131n Y\u00fczde 80\u2019ini T\u00fcrk Firmalar\u0131 Yapacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/23405\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>JSC Atomstroyexport T\u00fcrkiye \u00dcretiminden Sorumlu M\u00fcd\u00fcr Yard\u0131mc\u0131s\u0131 Anatoliy Andiyanov, 20 milyar dolarl\u0131k Akkuyu NGS Projesi`nin in\u015faat\u0131n\u0131n y\u00fczde 80`lik b\u00f6l\u00fcm\u00fcne T\u00fcrk firmalar\u0131 dahil etmek istediklerini belirterek, &#8220;Bu konuda kap\u0131lar\u0131m\u0131z tamamen a\u00e7\u0131k&#8221; dedi.<\/strong><\/p>\n<p>Akkuyu NGS Elektrik \u00dcretim A.\u015e.`den yap\u0131lan yaz\u0131l\u0131 a\u00e7\u0131klamaya g\u00f6re, Akkuyu NGS yetkilileri, Mersin Sanayi Sitesi Y\u00f6netim Kurulu \u00fcyelerine Akkuyu NGS projesinin haz\u0131rl\u0131k ve in\u015faat s\u00fcrecini anlatt\u0131lar. Mersin Sanayi Sitesi Y\u00f6<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-istemese-de-nukleer-e-ced-aliriz.png\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-9539\" title=\"akkuyu-n\u00fckleer-santrali\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-istemese-de-nukleer-e-ced-aliriz-300x185.png\" alt=\"\" width=\"300\" height=\"185\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-istemese-de-nukleer-e-ced-aliriz-300x185.png 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-istemese-de-nukleer-e-ced-aliriz-80x50.png 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-istemese-de-nukleer-e-ced-aliriz.png 481w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>netim Kurulu Ba\u015fkan\u0131 Mehmet Ali G\u00fclda\u011f`\u0131n davetiyle sanayi sitesi toplant\u0131 salonunda d\u00fczenlenen toplant\u0131ya, Akkuyu NGS A.\u015e. Ana M\u00fcteahhidi JSC Atomstroyexport T\u00fcrkiye \u00dcretiminden Sorumlu M\u00fcd\u00fcr Yard\u0131mc\u0131s\u0131 Anatoliy Andiyanov ve Mersin Bilgilendirme Merkezi M\u00fcd\u00fcr\u00fc Faruk \u00dczel de kat\u0131ld\u0131.<\/p>\n<p><strong>\u00d6ZEL \u00c7ALI\u015eMALARI RUS F\u0130RMALAR YAPACAK<\/strong><\/p>\n<p>Toplant\u0131da konu\u015fan Anatoliy Andiyanov, Akkuyu NGS in\u015faat\u0131n\u0131n, h\u00fck\u00fcmetler aras\u0131 anla\u015fmaya g\u00f6re genel m\u00fcteahhidi olan JSC Atomstroyexport taraf\u0131ndan yap\u0131laca\u011f\u0131n\u0131 hat\u0131rlatt\u0131. Kendi yapacaklar\u0131 i\u015flerin tamamen m\u00fchendislik gerektiren fiziki i\u015fler oldu\u011funu belirten Andiyanov, in\u015faat i\u015flerini ise ihaleye a\u00e7t\u0131klar\u0131n\u0131 ve ihaleyi kazanan firmalar\u0131n yapt\u0131\u011f\u0131n\u0131 kaydetti. 20 milyar dolarl\u0131k Akkuyu NGS Projesi`nin in\u015faat\u0131n\u0131n y\u00fczde 80`lik b\u00f6l\u00fcm\u00fcne T\u00fcrk firmalar\u0131 dahil etmek istediklerini ifade eden Andiyanov, NGS`nin g\u00fcvenlik sisteminin bulunaca\u011f\u0131 reakt\u00f6r binas\u0131, yard\u0131mc\u0131 bina ve elektroteknik yap\u0131lar\u0131n bulunaca\u011f\u0131 raf sisteminde \u00f6zel \u00e7al\u0131\u015fmalar yap\u0131laca\u011f\u0131n\u0131 bildirdi.<\/p>\n<p><strong>2015 YILINDA ANA \u0130HALELERE \u00c7IKILACAK<\/strong><\/p>\n<p>Bu \u00f6zel \u00e7al\u0131\u015fmalar\u0131 tecr\u00fcbeli Rus firmalar\u0131n\u0131n \u00fcstlenece\u011fini dile getiren Andiyanov, &#8220;Onun d\u0131\u015f\u0131nda kalan in\u015faatla ilgili t\u00fcm \u00e7al\u0131\u015fmalar, T\u00fcrk firmalar\u0131 taraf\u0131ndan ger\u00e7ekle\u015ftirilecek. \u00d6zellikle t\u00fcrbin b\u00f6l\u00fcm\u00fcndeki destekleyici ve so\u011futucu malzemeler, pompalar, bas\u0131n\u00e7 kaplar\u0131, s\u0131cakl\u0131k ayarlay\u0131c\u0131lar, vanalar, kablolar, borular ve reakt\u00f6r binas\u0131n\u0131 T\u00fcrk \u015firketler yapacak. \u0130hale ilanlar\u0131m\u0131z Rosatom ve Akkuyu NGS`nin resmi internet sitesinde yay\u0131nlanmaktad\u0131r. Dolay\u0131s\u0131yla ihalelerimiz uluslararas\u0131 ihalelerdir.<\/p>\n<p>ISO 9001 2008 yap\u0131m\u0131 14\/100 ve i\u015f g\u00fcvenli\u011fi belgesi olan, i\u015flerini gerekli kalite ve s\u00fcrede yapacaklar\u0131n\u0131 d\u00fc\u015f\u00fcnen t\u00fcm firmalar bu ihalelere kat\u0131l\u0131m g\u00f6sterebilir. Fiyat belirlemede de T\u00fcrkiye kurallar\u0131 ge\u00e7erli olacakt\u0131r. Asgari tutar belirlenecek, \u00fczerine \u00e7\u0131k\u0131lamayacak ve alt\u0131nda fiyat verilemeyecek. \u00c7evresel Etki De\u011ferlendirmesi (\u00c7ED) olumlu raporunun ard\u0131ndan 2015 y\u0131l\u0131nda ana ihalelere \u00e7\u0131k\u0131lacak&#8221; dedi.<\/p>\n<p><strong>12 B\u0130N K\u0130\u015e\u0130 \u00c7ALI\u015eACAK<\/strong><\/p>\n<p>Akkuyu NGS sahas\u0131nda \u015fu anda 2 T\u00fcrk firmas\u0131yla \u00e7al\u0131\u015f\u0131ld\u0131\u011f\u0131n\u0131 an\u0131msatan Andiyanov, &#8220;\u015eu anda sahada yakla\u015f\u0131k 150 ki\u015fi \u00e7al\u0131\u015f\u0131yor. \u00c7ED olumlu raporunun ard\u0131ndan a\u00e7\u0131lacak ihaleler neticesinde bu say\u0131 Rusya`dan gelen uzmanlar ve T\u00fcrk \u00e7al\u0131\u015fanlarla birlikte yakla\u015f\u0131k 12 bini bulacak&#8221; ifadelerini kulland\u0131.<\/p>\n<p>Santralin enerji \u00fcretilecek b\u00f6l\u00fcmlerinde \u00e7al\u0131\u015facak T\u00fcrk uzmanlar\u0131n yeti\u015fmesi halinde Rus uzmanlar\u0131n santralde \u00e7al\u0131\u015fmaya devam edip etmeyece\u011fine ili\u015fkin bir soruyu Andiyanov, &#8220;Ba\u015flang\u0131\u00e7 olarak i\u015fletimde Rus uzmanlar olacak. Ulusal N\u00fckleer Ara\u015ft\u0131rma \u00dcniversitesi Moskova Fizik M\u00fchendisli\u011fi Enstit\u00fcs\u00fc`nde (MEPhI) e\u011fitim g\u00f6ren T\u00fcrk \u00f6\u011frenciler, e\u011fitimlerini tamamlad\u0131\u011f\u0131nda i\u015fin uzman\u0131 olacaklar. Ama 60 y\u0131ll\u0131k i\u015fletim s\u00fcresince enerji \u00fcretilecek b\u00f6l\u00fcmlerde Rus personel bulunmaya devam edecek. Bizim amac\u0131m\u0131z bu projenin y\u00fczde 80`inin T\u00fcrkiye`de olmas\u0131. Bu konuda kap\u0131lar\u0131m\u0131z tamamen a\u00e7\u0131k. Anlatmaya haz\u0131r\u0131z ve bu ihaleleri ne \u015fekilde kazanaca\u011f\u0131n\u0131z\u0131 anlatmaya a\u00e7\u0131\u011f\u0131z&#8221; diyerek yan\u0131tlad\u0131.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.enerjigunlugu.net\/akkuyu-ngsnin-insaatinin-yuzde-80ini-turk-firmalar_7361.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.JSC Atomstroyexport T\u00fcrkiye \u00dcretiminden Sorumlu M\u00fcd\u00fcr Yard\u0131mc\u0131s\u0131 Anatoliy Andiyanov, 20 milyar dolarl\u0131k Akkuyu NGS Projesi`nin in\u015faat\u0131n\u0131n y\u00fczde 80`lik b\u00f6l\u00fcm\u00fcne T\u00fcrk firmalar\u0131 dahil etmek [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9539,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[13232,13231,63,67,1009,165,5902,13230,71,21,3586],"views":602,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/23405"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=23405"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/23405\/revisions"}],"predecessor-version":[{"id":23407,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/23405\/revisions\/23407"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/9539"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=23405"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=23405"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=23405"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}