{"id":23343,"date":"2014-03-03T10:46:02","date_gmt":"2014-03-03T07:46:02","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=23343"},"modified":"2014-03-03T10:46:02","modified_gmt":"2014-03-03T07:46:02","slug":"alakirda-2-hesin-ced-raporu-kabul-edildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/alakirda-2-hesin-ced-raporu-kabul-edildi\/","title":{"rendered":"(Turkish) Alak\u0131r\u2019da 2 HES\u2019in \u00c7ED Raporu Kabul Edildi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/23343\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Antalya \u00c7evre ve \u015eehircilik \u0130l M\u00fcd\u00fcrl\u00fc\u011f\u00fc, 4 HES\u2019in faaliyette oldu\u011fu Alak\u0131r Nehri \u00fczerinde planlanan Alak\u0131r 1 ve Alak\u0131r 2 adl\u0131 yeni HES\u2019ler i\u00e7in \u00c7ED raporunun kabul edildi\u011fini, inceleme s\u00fcresinin sona erdi\u011fini duyurdu.<\/strong><\/p>\n<p>Antalya \u2019n\u0131n Kumluca \u0130l\u00e7esi B\u00fcy\u00fckalan K\u00f6y\u00fc s\u0131n\u0131rlar\u0131 i\u00e7erisinde, Ado Madencilik Elektrik \u00dcretim San. ve Tic. A.\u015e. taraf\u0131ndan yap\u0131lmas\u0131 planlanan \u2018Alak\u0131r-1 Reg\u00fclat\u00f6r\u00fc ve HES (3,968MWm\/3,790MWe)\u2019 ile \u2018Alak\u0131r-2 HES-Kurulu g\u00fcc\u00fc 4,389 MWm\/4,18 MWe-Malzeme Oca\u011f\u0131, K\u0131rma Eleme Tesisi ve Haz\u0131r Beton \u00dcretim Tesisi\u2019 projelerine ili\u015fkin olarak \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131 Komisyonu, inceleme ve de\u011ferlendirme s\u00fcrecini tamamlad\u0131. <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/alakirda-2-hesin-ced-raporu-kabul-edildi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-23344\" title=\"alakirda-2-hesin-ced-raporu-kabul-edildi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/alakirda-2-hesin-ced-raporu-kabul-edildi-300x213.jpg\" alt=\"\" width=\"300\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/alakirda-2-hesin-ced-raporu-kabul-edildi-300x213.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/alakirda-2-hesin-ced-raporu-kabul-edildi-70x50.jpg 70w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/03\/alakirda-2-hesin-ced-raporu-kabul-edildi.jpg 407w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>\u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131 \u0130nceleme De\u011ferlendirme Komisyonu karar\u0131na ili\u015fkin \u0130l M\u00fcd\u00fcrl\u00fc\u011f\u00fc\u2019nden 26 \u015eubat 2014\u2032te yap\u0131lan duyuruda, her iki \u00c7ED raporunun nihai kabul edildi\u011fi, inceleme ve de\u011ferlendirme s\u00fcre\u00e7lerinin sona erdirildi\u011fi a\u00e7\u0131kland\u0131.<\/p>\n<h2>10 g\u00fcn g\u00f6r\u00fc\u015flere a\u00e7\u0131k<\/h2>\n<p>\u2018\u00c7ED olumlu\u2019 anlam\u0131na gelen duyurularda, raporlar\u0131n \u00c7evre ve \u015eehircilik \u0130l M\u00fcd\u00fcrl\u00fc\u011f\u00fc hizmet binas\u0131nda 10 i\u015fg\u00fcn\u00fc s\u00fcresince g\u00f6r\u00fc\u015flere a\u00e7\u0131ld\u0131\u011f\u0131, projelere ili\u015fkin soru ve \u00f6nerilerin Antalya Valili\u011fi veya Bakanl\u0131k \u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc\u2019ne yaz\u0131l\u0131 olarak bildirilmesi gerekti\u011fi belirtildi.<\/p>\n<h2>iki rapora da dava a\u00e7\u0131lacak<\/h2>\n<p>Bakanl\u0131\u011f\u0131n Alak\u0131r\u2019da kurulmas\u0131 planlanan HES\u2019lere kar\u015f\u0131 m\u00fccadele y\u00fcr\u00fcten Alak\u0131r Nehri Karde\u015fli\u011fi, her iki HES i\u00e7in de \u2018\u00c7ED Olumlu\u2019 karar\u0131 verilmemesi i\u00e7in internet \u00fczerinden 30 binin \u00fczerinde imza toplayarak Bakanl\u0131\u011fa iletmi\u015fti. Alak\u0131r Nehri Karde\u015fli\u011fi \u00fcyeleri, her iki raporun nihai kabul edilmesi \u00fczerine bu kararlar\u0131n iptali i\u00e7in mahkemeye gidilece\u011fini belirtti.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.radikal.com.tr\/cevre\/alakirda_2_hesin_onu_acildi-1178927\" target=\"_blank\">Radikal<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Antalya \u00c7evre ve \u015eehircilik \u0130l M\u00fcd\u00fcrl\u00fc\u011f\u00fc, 4 HES\u2019in faaliyette oldu\u011fu Alak\u0131r Nehri \u00fczerinde planlanan Alak\u0131r 1 ve Alak\u0131r 2 adl\u0131 yeni HES\u2019ler i\u00e7in [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":23344,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[13210,13211,5465,63,67,1009,165,35370,1090],"views":763,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/23343"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=23343"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/23343\/revisions"}],"predecessor-version":[{"id":23345,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/23343\/revisions\/23345"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/23344"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=23343"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=23343"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=23343"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}