{"id":23234,"date":"2014-02-27T16:09:20","date_gmt":"2014-02-27T13:09:20","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=23234"},"modified":"2014-02-27T16:09:20","modified_gmt":"2014-02-27T13:09:20","slug":"17-hes-projesi-icin-ced-olumlu-karari-verildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/17-hes-projesi-icin-ced-olumlu-karari-verildi\/","title":{"rendered":"(Turkish) 17 HES Projesi \u0130\u00e7in \u00c7ED Olumlu Karar\u0131 Verildi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/23234\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u00c7evresel Etki De\u011ferlendime \u0130zin ve Denetleme Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc, 17 Ocak ve \u015eubat aylar\u0131nda 7 Hidroelektrik Santral\u0131 (HES) Projesi i\u00e7in \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) olumlu karar\u0131 verdi.<\/strong><\/p>\n<p>\u00c7ED olumlu kararlar\u0131 verilen s\u00f6z konusu HES\u2019ler \u015f\u00f6yle;<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/17-hes-projesi-icin-ced-olumlu-karari-verildi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-23235\" title=\"17-hes-projesi-icin-ced-olumlu-karari-verildi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/17-hes-projesi-icin-ced-olumlu-karari-verildi-300x186.jpg\" alt=\"\" width=\"300\" height=\"186\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/17-hes-projesi-icin-ced-olumlu-karari-verildi-300x186.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/17-hes-projesi-icin-ced-olumlu-karari-verildi-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/17-hes-projesi-icin-ced-olumlu-karari-verildi.jpg 328w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>-Maya Enerji, Diyarbak\u0131r 50 MW Metin HES-Kayser Baraj\u0131<br \/>\n-\u015eirik\u00e7io\u011flu Elektrik, Ad\u0131yaman 26 MW Bizna Baraj\u0131 ve HES<br \/>\n-Sunel Enerji, Erzurum 35,5 MW Hunut I-II-III HES\u2019ler<br \/>\n-\u015eenkaya Elektrik, Erzurum 21,5 MW Gelinta\u015f\u0131 II Baraj\u0131, Gelinta\u015f\u0131 III Reg. ve HES<br \/>\n-Turkuaz Elektrik, Ordu 56,7 MW Fatsa HES<br \/>\n-Turkuaz Elektrik, Ordu 46,7 MW Tanyeri Baraj\u0131 ve HES<br \/>\n-Turkuaz Elektrik, Ordu 8,4 MW Hisarbey Baraj\u0131 ve Bolaman HES<br \/>\n-Mercan Enerji, Tunceli 12,20 MW Tagar Reg\u00fclat\u00f6r\u00fc ve HES<br \/>\n-Getiri Enerji, Giresun 14.88 MW Ya\u011fl\u0131dere Reg\u00fclat\u00f6r\u00fc ve HES<br \/>\n-GAE Enerji, G\u00fcm\u00fc\u015fhane 17,61 MW Derya -II Reg\u00fclat\u00f6r\u00fc ve HES<br \/>\n-Silvan Elektrik, Diyarbak\u0131r 58,58 MW Birsu-I HES<br \/>\n-Silvan Elektrik, Diyarbak\u0131r 32 MW Birsu-II HES<br \/>\n-Ayd\u0131nl\u0131k Enerji, \u015e\u0131rnak 83,75 MW Y\u00fcksekkaya Reg\u00fclat\u00f6r\u00fc ve HES<br \/>\n-Durusu Enerji, Bing\u00f6l 20,92 MW Duru I HES, Duru Baraj\u0131 (g\u00f6l hacmi 63,71 milyon m3)<br \/>\n-Durusu Enerji, Bing\u00f6l 48,36 MW Duru II HES<br \/>\n-Bucan Enerji, Ankara 11,25 MW \u00c7altepe Reg\u00fclat\u00f6r\u00fc ve HES<br \/>\n-A\u011fr\u0131 Enerji, A\u011fr\u0131 82,39 MW Bulut Baraj\u0131 ve HES<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.enerjigunlugu.net\/17-hes-projesi-icin-ced-olumlu-karari-verildi_7285.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u00c7evresel Etki De\u011ferlendime \u0130zin ve Denetleme Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc, 17 Ocak ve \u015eubat aylar\u0131nda 7 Hidroelektrik Santral\u0131 (HES) Projesi i\u00e7in \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":23235,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[13153,5465,13152,63,67,1009,165,35370,1090],"views":1836,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/23234"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=23234"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/23234\/revisions"}],"predecessor-version":[{"id":23237,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/23234\/revisions\/23237"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/23235"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=23234"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=23234"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=23234"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}