{"id":23023,"date":"2014-02-23T14:33:00","date_gmt":"2014-02-23T11:33:00","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=23023"},"modified":"2014-02-23T14:33:00","modified_gmt":"2014-02-23T11:33:00","slug":"nordex-turkiyede-uc-res-icin-turbin-siparisi-aldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/nordex-turkiyede-uc-res-icin-turbin-siparisi-aldi\/","title":{"rendered":"(Turkish) Nordex, T\u00fcrkiye\u2019de \u00dc\u00e7 RES \u0130\u00e7in T\u00fcrbin Sipari\u015fi Ald\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/23023\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Alman r\u00fczgar t\u00fcrbini \u00fcreticisi Nordex, T\u00fcrkiye\u2019de ger\u00e7ekle\u015ftirilecek \u00fc\u00e7 ayr\u0131 r\u00fczgar enerjisi projesi i\u00e7in t\u00fcrbin sipari\u015fi ald\u0131\u011f\u0131 a\u00e7\u0131klad\u0131. Nordex taraf\u0131ndan konu ile ilgili yap\u0131lan a\u00e7\u0131klamaya g\u00f6re \u015firket \u0130zmir ve Manisa\u2019da ger\u00e7ekle\u015ftirilecek olan projeler i\u00e7in toplam 37.6 MW g\u00fcc\u00fcnde r\u00fczg\u00e2r t\u00fcrbini tedarik edecek.<\/strong><\/p>\n<p>\u015eirket taraf\u0131ndan sa\u011flanacak t\u00fcrbinler \u00c7e\u015fme RES ve Alia\u011fa RES projelerinin hayata ge\u00e7irilmesi ve halihaz\u0131rda devrede olan Akres Projesinin kapasitesinin art\u0131r\u0131lmas\u0131 i\u00e7in kullan\u0131lacak.<\/p>\n<p><strong>\u00c7E\u015eME RES PROJES\u0130<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/nordex-turkiyede-uc-res-icin-turbin-siparisi-aldi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-23024\" title=\"nordex-turkiyede-uc-res-icin-turbin-siparisi-aldi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/nordex-turkiyede-uc-res-icin-turbin-siparisi-aldi-300x204.jpg\" alt=\"\" width=\"300\" height=\"204\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/nordex-turkiyede-uc-res-icin-turbin-siparisi-aldi-300x204.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/nordex-turkiyede-uc-res-icin-turbin-siparisi-aldi-73x50.jpg 73w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/nordex-turkiyede-uc-res-icin-turbin-siparisi-aldi.jpg 472w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><br \/>\n18 MW kurulu g\u00fcc\u00fcnde olacak \u00c7e\u015fme RES projesi, ABK \u00c7e\u015fme Enerji \u00dcretim A.\u015e. taraf\u0131ndan geli\u015ftirilecek iken santrale bu y\u0131l\u0131n yaz d\u00f6neminde alt\u0131 adet N117\/3000 t\u00fcrbini sa\u011flanacak. \u015eirketin a\u00e7\u0131klamas\u0131na g\u00f6re orta-y\u00fcksek r\u00fczgarl\u0131 alanlar i\u00e7in geli\u015ftirilen t\u00fcrbinler santralin kapasite fakt\u00f6r\u00fcn\u00fc y\u00fczde 38\u2019\u00fcn \u00fczerine \u00e7\u0131karacak.<\/p>\n<p><strong>AL\u0130A\u011eA RES PROJES\u0130<\/strong><\/p>\n<p>Ak\u00e7a Holding taraf\u0131ndan geli\u015ftirilecek olan Alia\u011fa RES projesinde ise, \u015firketin en son geli\u015ftirdi\u011fi modellerinden olan N117\/2400 t\u00fcrbinleri kullan\u0131lacak. Bu santralin in\u015fa \u00e7al\u0131\u015fmalar\u0131na 2014 yaz\u0131nda ba\u015flanacak iken, santralin kapasite fakt\u00f6r\u00fc y\u00fczde 36 olacak.<\/p>\n<p><strong>AKRES PROJES\u0130<\/strong><\/p>\n<p>Karesi Enerji`nin sahip oldu\u011fu ve 2011 y\u0131l\u0131nda yine Nordex taraf\u0131ndan sa\u011flanan N90\/2500 t\u00fcrbinleri kullan\u0131larak devreye al\u0131nan Akres projesi i\u00e7in ise d\u00f6rt adet N100\/2500 t\u00fcrbinleri sa\u011flanacak iken bu santralin kurulu g\u00fcc\u00fc 45 MW`tan 55 MW`a y\u00fckselecek.<\/p>\n<p>Nordex`ten konu ile ilgili yap\u0131lan a\u00e7\u0131klamada de\u011ferlendirmesini payla\u015fan \u015firketin Y\u00f6netim Kurulu \u00fcyesi Lars Bondo Krogsgaard \u015funlar\u0131 s\u00f6yledi; &#8220;Bu anla\u015fmalar \u00fcr\u00fcn stratejimizi tamam\u0131yla yans\u0131t\u0131yor. Birlikte \u00e7al\u0131\u015ft\u0131\u011f\u0131m\u0131z yat\u0131r\u0131mc\u0131larla t\u00fcm lokasyonlarda en iyi \u00fcr\u00fcnleri garanti ediyoruz. T\u00fcrkiye`deki ba\u015far\u0131l\u0131 \u00e7al\u0131\u015fmalar\u0131m\u0131za devam ediyor olmaktan da mutluluk duyuyoruz&#8221;<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.enerjigunlugu.net\/nordex-turkiyede-uc-res-icin-turbin-siparisi-aldi_7235.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Alman r\u00fczgar t\u00fcrbini \u00fcreticisi Nordex, T\u00fcrkiye\u2019de ger\u00e7ekle\u015ftirilecek \u00fc\u00e7 ayr\u0131 r\u00fczgar enerjisi projesi i\u00e7in t\u00fcrbin sipari\u015fi ald\u0131\u011f\u0131 a\u00e7\u0131klad\u0131. Nordex taraf\u0131ndan konu ile ilgili yap\u0131lan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":23024,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[13029,12093,13028,13027,13026,63,67,1009,165,12094,2455,69,16,13025],"views":2234,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/23023"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=23023"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/23023\/revisions"}],"predecessor-version":[{"id":23025,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/23023\/revisions\/23025"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/23024"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=23023"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=23023"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=23023"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}