{"id":22997,"date":"2014-02-21T18:13:12","date_gmt":"2014-02-21T15:13:12","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=22997"},"modified":"2014-02-21T18:13:12","modified_gmt":"2014-02-21T15:13:12","slug":"mng-holding-fildisinde-3-hes-yapacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/mng-holding-fildisinde-3-hes-yapacak\/","title":{"rendered":"(Turkish) MNG Holding Fildi\u015fi\u2019nde 3 HES Yapacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/22997\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>MNG Holding, Afrika\u2019n\u0131n en bat\u0131s\u0131nda 3 HES yap\u0131m\u0131 i\u00e7in anla\u015fma a\u015famas\u0131na geldi. MNG Holding CEO\u2019su Mehmet Nazif G\u00fcnal ve Fildi\u015fi Sahili Enerji Bakan\u0131 Adama Toungara, MNG Holding\u2019in bu \u00fclkenin bat\u0131s\u0131nda hidroelektrik santralleri in\u015fa etmesi i\u00e7in 1.9 milyar dolar tutar\u0131nda anla\u015fmaya ili\u015fkin\u00a0g\u00f6r\u00fc\u015fmelerin ileri a\u015famada oldu\u011funu s\u00f6ylediler.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/mng-holding-fildisinde-3-hes-yapacak.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-22998\" title=\"mng-holding-fildisinde-3-hes-yapacak\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/mng-holding-fildisinde-3-hes-yapacak-300x201.jpg\" alt=\"\" width=\"300\" height=\"201\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/mng-holding-fildisinde-3-hes-yapacak-300x201.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/mng-holding-fildisinde-3-hes-yapacak-74x50.jpg 74w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/mng-holding-fildisinde-3-hes-yapacak.jpg 362w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p>Fildi\u015fi Sahili 10 y\u0131l s\u00fcren siyasi sorunlar\u0131n ard\u0131ndan h\u0131zla b\u00fcy\u00fcyen ekonomisini desteklemek i\u00e7in enerji altyap\u0131s\u0131na b\u00fcy\u00fck yat\u0131r\u0131m yap\u0131yor. H\u00fck\u00fcmetle Sassandra Nehri \u00fczerine \u00fc\u00e7 baraj yap\u0131m\u0131 i\u00e7in g\u00f6r\u00fc\u015fme halinde olan MNG\u2019nin CEO\u2019su G\u00fcnal, Fildi\u015fi Sahili Ba\u015fbakan\u0131 Daniel Kablan Duncan ile g\u00f6r\u00fc\u015ft\u00fc. G\u00fcnal daha sonra yapt\u0131\u011f\u0131 a\u00e7\u0131klamada \u201cProje 540 megawatt kapasitesinde. Projenin \u00fc\u00e7 baraj i\u00e7in maliyeti 1.9 milyar dolar civar\u0131nda. \u00d6ncelikle h\u00fck\u00fcmet ile anla\u015fma sa\u011flamam\u0131z gerekiyor. Anla\u015fma imzalan\u0131rsa in\u015faat d\u00f6rt y\u0131l s\u00fcrecek\u201d dedi.<\/p>\n<p>Toungara ise hidroelektrik santrallerin MNG\u2019ye ait olaca\u011f\u0131n\u0131 ve MNG\u2019nin \u00fcretilen enerjiyi ulusal iletim \u015firketine sataca\u011f\u0131n\u0131 belirterek, \u201cProje tamamen \u00f6zel, h\u00fck\u00fcmet tek kuru\u015f harcamayacak\u201d dedi.<\/p>\n<p>G\u00f6r\u00fc\u015fmelerin elektri\u011fin sat\u0131n al\u0131naca\u011f\u0131 fiyat \u00fczerinde odakland\u0131\u011f\u0131n\u0131 belirten Toungara, \u201cAnla\u015fman\u0131n imzalanmas\u0131 i\u00e7in son a\u015famalarday\u0131z\u201d \u015feklinde konu\u015ftu.<\/p>\n<p>Kaynak: <a href=\"http:\/\/emlak.haber7.com\/projeler\/haber\/1130273-mng-fildisinde-hes-yapacak\" target=\"_blank\">Haber 7<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.MNG Holding, Afrika\u2019n\u0131n en bat\u0131s\u0131nda 3 HES yap\u0131m\u0131 i\u00e7in anla\u015fma a\u015famas\u0131na geldi. MNG Holding CEO\u2019su Mehmet Nazif G\u00fcnal ve Fildi\u015fi Sahili Enerji Bakan\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":22998,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[13005,13006,63,67,1009,165,13004,35370,1090,13007,13003],"views":1144,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/22997"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=22997"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/22997\/revisions"}],"predecessor-version":[{"id":23000,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/22997\/revisions\/23000"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/22998"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=22997"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=22997"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=22997"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}