{"id":22782,"date":"2014-02-18T10:05:48","date_gmt":"2014-02-18T07:05:48","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=22782"},"modified":"2014-02-18T10:05:48","modified_gmt":"2014-02-18T07:05:48","slug":"tanapta-12-milyar-dolarlik-maliyet-oz-sermayeyle-karsilanacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tanapta-12-milyar-dolarlik-maliyet-oz-sermayeyle-karsilanacak\/","title":{"rendered":"(Turkish) TANAP\u2019ta 12 Milyar Dolarl\u0131k Maliyet \u00d6z Sermayeyle Kar\u015f\u0131lanacak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/22782\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Azeri gaz\u0131n\u0131 T\u00fcrkiye\u2019den Avrupa\u2019ya ta\u015f\u0131yacak TANAP Projesi\u2019nin 12 milyar dolarl\u0131k maliyeti \u00f6z sermaye ile kar\u015f\u0131lanacak. Projenin 2018\u2019e yeti\u015fmesi i\u00e7in Azerbaycan 7 milyar dolar\u0131 nakit koyacak.<\/strong><\/p>\n<p>Azerbaycan gaz\u0131n\u0131 Avrupa\u2019ya ta\u015f\u0131yacak boru hatt\u0131n\u0131n T\u00fcrkiye\u2019deki k\u0131sm\u0131n\u0131 olu\u015fturan Trans Anadolu Do\u011falgaz Boru Hatt\u0131 (TANAP), tamamen \u00f6z sermaye ile in\u015fa edilecek. H\u00fcrriyet\u2019ten Merve Erdil\u2019in haberine g\u00f6re, bu karar\u0131n arkas\u0131nda Azerilerin projenin bir an \u00f6nce hayata ge\u00e7mesine y\u00f6nelik arzusu var. Yat\u0131r\u0131m bedeli 12 milyar dolar\u0131 bulmas\u0131 beklenen TANAP\u2019\u0131n, yakla\u015f\u0131k 7 milyar dolar\u0131n\u0131 Azerbaycan Devlet Petrol Fonu nakit koyacak. Geri kalan 5 milyar dolar\u0131n yakla\u015f\u0131k 3-4 milyar dolar\u0131n\u0131 BOTA\u015e, 1-2 milyar dolar\u0131n\u0131 da BP\u2019nin \u00f6demesi \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<h2>Kredi aranm\u0131yor<\/h2>\n<p>B\u00f6ylesine b\u00fcy\u00fck \u00e7apl\u0131 bir projede neden kredi kullan\u0131lmayaca\u011f\u0131n\u0131 sordu\u011fumuz Socar T\u00fcrkiye Ba\u015fkan Yard\u0131mc\u0131s\u0131 Samir Kerimli, \u201cAzerbaycan ve T\u00fcrkiye\u2019nin, projenin stratejik durumuna g\u00f6sterdi\u011fi \u00f6nemden dolay\u0131 kredi aray\u0131\u015f\u0131nda bulunmayarak, direk \u00f6zkaynak ile yap\u0131lmas\u0131 g\u00fcndemde. Azerbaycan, TANAP\u2019\u0131n 2018\u2019de hayata ge\u00e7mesini \u00e7ok \u00f6nemsiyor. Bu nedenle finansman kaynakl\u0131 bir gecikme ya\u015famak istemiyor\u201d \u015feklinde konu\u015ftu. Kerimli, proje belli bir a\u015famaya geldikten sonra bankalar\u0131n da kat\u0131l\u0131m\u0131n\u0131n s\u00f6z konusu olabilece\u011fin<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/tanapta-12-milyar-dolarlik-maliyet-oz-sermayeyle-karsilanacak.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-22783\" title=\"tanapta-12-milyar-dolarlik-maliyet-oz-sermayeyle-karsilanacak\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/tanapta-12-milyar-dolarlik-maliyet-oz-sermayeyle-karsilanacak-300x213.jpg\" alt=\"\" width=\"300\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/tanapta-12-milyar-dolarlik-maliyet-oz-sermayeyle-karsilanacak-300x213.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/tanapta-12-milyar-dolarlik-maliyet-oz-sermayeyle-karsilanacak-70x50.jpg 70w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/tanapta-12-milyar-dolarlik-maliyet-oz-sermayeyle-karsilanacak.jpg 490w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>i s\u00f6yledi. TANAP Projesi\u2019nin y\u00fczde 70\u2019i SOCAR\u2019\u0131n, y\u00fczde 30\u2019u T\u00fcrkiye\u2019nin elinde bulunurken; \u015eahdeniz II konsorsiyumu \u00fcyelerinden BP, Socar\u2019dan y\u00fczde 12 oran\u0131nda hisse alaca\u011f\u0131n\u0131 taahh\u00fct etmi\u015fti.<\/p>\n<p>Hazar Stratejisi Enstit\u00fcs\u00fc (HASEN) evsahipli\u011finde d\u00fczenlenen TANAP konulu toplant\u0131da konu\u015fan Enerji Bakanl\u0131\u011f\u0131 M\u00fcste\u015far Yard\u0131mc\u0131s\u0131 Sefa Sad\u0131k Aytekin, Azerbaycan\u2019\u0131n T\u00fcrkiye\u2019nin en d\u00fc\u015f\u00fck maliyetli ve stratejik gaz tedarik\u00e7isi oldu\u011funu vurgulayarak, \u201cTANAP\u2019tan ilk a\u015famada 16 milyar metrek\u00fcp (bcm) do\u011falgaz akacak. Bunun 10 bcm\u2019i Avrupa\u2019ya gidecek, 6 bcm\u2019i T\u00fcrkiye\u2019de kalacak. \u0130leriki a\u015famada ise hattan 31 bcm gaz ak\u0131\u015f\u0131 olacak. TANAP, \u015eahdeniz 2 gaz\u0131n\u0131n yan\u0131s\u0131ra, ilerleyen fazlarda Azerbaycan\u2019\u0131n di\u011fer sahalar\u0131ndan, T\u00fcrkmenistan\u2019dan, Irak\u2019tan ve Do\u011fu Akdeniz\u2019den gelen gaz\u0131 da ta\u015f\u0131yabilir. T\u00fcrkmen gaz\u0131n\u0131n TANAP\u2019a verilmesi daha uzun vadeli bir hedef. Irak ise T\u00fcrkiye i\u00e7in k\u0131sa ve orta vadede ciddi bir hedef\u201d dedi. Aytekin, gelecekte ilave yat\u0131r\u0131mlarla bu hatt\u0131n kapasitesinin 60 milyar metrek\u00fcpe kadar y\u00fckseltilebilece\u011fini de ekledi.<\/p>\n<h2>Daha \u00e7ok gaz gelecek<\/h2>\n<p>BP T\u00fcrkiye Ba\u015fkan\u0131 Bud Fackrell, ge\u00e7ti\u011fimiz y\u0131l \u015eahdeniz II Konsorsiyumu \u00fcyelerinin 19 farkl\u0131 \u015firketle 100 milyar dolar de\u011ferinde gaz sat\u0131n al\u0131m kontrat\u0131 imzalad\u0131\u011f\u0131n\u0131 belirterek, \u201cAvrupa\u2019da 2035 y\u0131l\u0131nda enerji talebi y\u00fczde 6 oran\u0131nda daralacak ama do\u011falgaz talebi ve ithalata olan ba\u011f\u0131ml\u0131l\u0131k daha da artacak\u201d dedi. TANAP\u2019\u0131n ilk faz\u0131ndaki 10 bcm Avrupa\/6 bcm T\u00fcrkiye rasyosunun, projenin ileriki fazlar\u0131nda korunup korunmayaca\u011f\u0131n\u0131 sordu\u011fumuz Fackrell, \u201c10-6 rasyosu, ilerleyen gaz senaryolar\u0131 i\u00e7in kal\u0131c\u0131 de\u011fil\u201d dedi. B\u00f6ylece T\u00fcrkiye, daha fazla gaz TANAP\u2019tan \u00e7ekebilecek.<\/p>\n<h2>Bu \u00e7apta boru yok<\/h2>\n<p>SOCAR T\u00fcrkiye Ba\u015fkan Yard\u0131mc\u0131s\u0131 Samir Kerimli, 1841 kilometrelik TANAP\u2019\u0131n 20 ilden ge\u00e7erek tamamlanaca\u011f\u0131n\u0131 s\u00f6yleyerek, \u015f\u00f6yle devam etti: \u201cG\u00fcrcistan s\u0131n\u0131r\u0131ndan Eski\u015fehir\u2019e kadar 56 in\u00e7 geni\u015fli\u011finde boru d\u00f6\u015fenecek. D\u00fcnyada bu b\u00fcy\u00fckl\u00fckte bir proje, sadece Kazakistan\u2019dan \u00c7in\u2019e kadar denendi. Eski\u015fehir\u2019den Yunanistan s\u0131n\u0131r\u0131na kadar ise 48 in\u00e7lik boru d\u00f6\u015fenecek. 2018\u2019de gaz ge\u00e7i\u015fini sa\u011flamay\u0131 planl\u0131yoruz. \u0130lk fazda 16 bcm gaz ge\u00e7eek. Faz 2 ile 24, Faz 3 ile 31 bcm gaz ta\u015f\u0131may\u0131 planl\u0131yoruz.\u201d<\/p>\n<p><strong>Haberin <a href=\"http:\/\/www.hurriyet.com.tr\/ekonomi\/25812592.asp\" target=\"_blank\">Devam\u0131 \u0130\u00e7in TIKLAYIN&gt;&gt;<\/a><\/strong><\/p>\n<p>Kaynak: H\u00fcrriyet<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Azeri gaz\u0131n\u0131 T\u00fcrkiye\u2019den Avrupa\u2019ya ta\u015f\u0131yacak TANAP Projesi\u2019nin 12 milyar dolarl\u0131k maliyeti \u00f6z sermaye ile kar\u015f\u0131lanacak. Projenin 2018\u2019e yeti\u015fmesi i\u00e7in Azerbaycan 7 milyar dolar\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":22783,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[5929,3307,92,226,63,67,1009,165,12912,12913,12914,769,2297,1281,846],"views":610,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/22782"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=22782"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/22782\/revisions"}],"predecessor-version":[{"id":22785,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/22782\/revisions\/22785"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/22783"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=22782"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=22782"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=22782"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}