{"id":22714,"date":"2014-02-16T20:50:59","date_gmt":"2014-02-16T17:50:59","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=22714"},"modified":"2014-02-16T20:50:59","modified_gmt":"2014-02-16T17:50:59","slug":"zorlunun-alasehir-jesinin-kapasite-artisina-onay","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/zorlunun-alasehir-jesinin-kapasite-artisina-onay\/","title":{"rendered":"(Turkish) Zorlu\u2019nun Ala\u015fehir JES\u2019inin Kapasite Art\u0131\u015f\u0131na Onay!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/22714\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Zorlu Jeotermal Enerji Elektrik \u00dcretim A.\u015e., Manisa Ala\u015fehir Erenk\u00f6y\u2019de kuraca\u011f\u0131 Ala\u015fehir Jeotemal Enerji Santral\u0131 Projesi\u2019nin kapasitesini 45 MW\u2019a y\u00fckseltmesi i\u00e7in \u00c7ED onay\u0131 verildi. \u00c7evresel Etki De\u011ferlendirme \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc, kapasite art\u0131\u015f\u0131na ili\u015f<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/zorlu-enerji-avrupa-komisyonu-odul.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-9508\" title=\"zorlu-enerji\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/zorlu-enerji-avrupa-komisyonu-odul-300x183.jpg\" alt=\"\" width=\"300\" height=\"183\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/zorlu-enerji-avrupa-komisyonu-odul-300x183.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/zorlu-enerji-avrupa-komisyonu-odul-80x48.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/zorlu-enerji-avrupa-komisyonu-odul.jpg 490w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>kin \u00c7ED Olumlu karar\u0131n\u0131 ge\u00e7ti\u011fimiz g\u00fcnlerde ald\u0131. EPDK taraf\u0131ndan da kapasite art\u0131\u015f\u0131na ili\u015fkin lisans tadili ger\u00e7ekle\u015ftirilmesi ile izin prosed\u00fcr\u00fc tamamlanm\u0131\u015f olacak.<\/strong><\/p>\n<p><strong>PROJE\u2019N\u0130N YAKLA\u015eIK YATIRIM MAL\u0130YET\u0130 110 M\u0130LYON DOLAR<\/strong><\/p>\n<p>15 MW`l\u0131k kapasite art\u0131\u015f\u0131 yap\u0131lacak Proje\u2019nin yakla\u015f\u0131k yat\u0131r\u0131m maliyeti 110 milyon Dolar olacak olup, Alasehir JES Projesi kapsam\u0131nda, 10 tanesi \u00fcretim ve 9 tanesi reenjeksiyon olmak \u00fczere 19 adet jeotermal kuyu sondaj\u0131 yap\u0131lmas\u0131 planlan\u0131yor.<\/p>\n<p>Santral\u2019da jeotermal enerji kullan\u0131larak 45 MWe e\u015fde\u011ferinde elektrik \u00fcretilmesi planlanmakta olup \u00fcretim miktar\u0131 300.000.000 kWh\/y\u0131l olarak, kapasite fakt\u00f6r\u00fc %96 olarak \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<p>\u0130n\u015faat \u00f6ncesi d\u00f6nem 22 ay, insaat d\u00f6nemi 38 ay olmak \u00fczere 60 ayda tamamlanmas\u0131 planlanan tesis, 154 kV Alasehir TM\u2019 ne tek hat semas\u0131na uygun ba\u011flanacak. Proje`nin \u00f6mr\u00fc ise 30 y\u0131l olarak \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.enerjigunlugu.net\/zorlunun-alasehir-jesinin-kapasite-artisina-onay_7146.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Zorlu Jeotermal Enerji Elektrik \u00dcretim A.\u015e., Manisa Ala\u015fehir Erenk\u00f6y\u2019de kuraca\u011f\u0131 Ala\u015fehir Jeotemal Enerji Santral\u0131 Projesi\u2019nin kapasitesini 45 MW\u2019a y\u00fckseltmesi i\u00e7in \u00c7ED onay\u0131 verildi. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9508,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[12885,12886,63,67,1009,165,58,56,10686,6322,10764,12884,12883],"views":810,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/22714"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=22714"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/22714\/revisions"}],"predecessor-version":[{"id":22715,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/22714\/revisions\/22715"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/9508"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=22714"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=22714"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=22714"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}