{"id":22572,"date":"2014-02-13T10:30:06","date_gmt":"2014-02-13T07:30:06","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=22572"},"modified":"2014-02-13T10:30:06","modified_gmt":"2014-02-13T07:30:06","slug":"teias-iletim-hatlarini-helikopterle-denetleyecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/teias-iletim-hatlarini-helikopterle-denetleyecek\/","title":{"rendered":"(Turkish) TE\u0130A\u015e, \u0130letim Hatlar\u0131n\u0131 Helikopterle Denetleyecek!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/22572\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>TE\u0130A\u015e b\u00fcnyesindeki 50.000 km 380 kV ve 154 kV enerji iletim hatlar\u0131n\u0131n, hat yak\u0131n\u0131nda u\u00e7acak helikopterlere monte edilen elektro-optik ekipmanlarla havadan kontrol edilerek, iletim hatlar\u0131ndaki ar\u0131zal\u0131 veya ar\u0131za olabilecek yerlerin tespit edilip kay\u0131t alt\u0131na al\u0131nmas\u0131, belirli formatta ve periyotta raporlanmas\u0131, ar\u0131za durumunda TE\u0130A\u015e\u2019\u0131n talep etmesi halinde ar\u0131za yeri tespiti, ar\u0131za mahalline personel ve\/veya malzeme nakli i\u00e7in 1095 g\u00fcn (3 y\u0131l) s\u00fcre ile hizmet al\u0131m\u0131 i\u015fini 27.05.2013 tarihli 2012-\u0130\u015eD\/7 referansl\u0131 S\u00f6zle\u015f<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/teias-iletim-hatlarini-helikopterle-denetleyecek.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-22573\" title=\"teias-iletim-hatlarini-helikopterle-denetleyecek\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/teias-iletim-hatlarini-helikopterle-denetleyecek-300x191.jpg\" alt=\"\" width=\"300\" height=\"191\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/teias-iletim-hatlarini-helikopterle-denetleyecek-300x191.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/teias-iletim-hatlarini-helikopterle-denetleyecek-78x50.jpg 78w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/teias-iletim-hatlarini-helikopterle-denetleyecek.jpg 445w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>me ile y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fcnde bulunduran AIR METHODS CORPORATION\/ABD Firmas\u0131n\u0131n alt y\u00fcklenicisi Kaan Air A.\u015e.\u2019nin heliportunda s\u00f6zle\u015fme h\u00fck\u00fcmleri gere\u011fince helikopterlerin ve g\u00f6rev te\u00e7hizat\u0131n\u0131n kabul\u00fc 08.01.2014 tarihinde yap\u0131ld\u0131.<\/strong><\/p>\n<p>\u0130\u015fin Teknik \u015eartnamesini de haz\u0131rlayan ve 11. \u0130T\u0130GM \u0130\u015fletme M\u00fcd\u00fcr\u00fc \u00d6mer BAYD\u0130LL\u0130, 14. \u0130T\u0130GM Grup M\u00fcd\u00fcr Yard\u0131mc\u0131s\u0131 Y\u00fcksel YAVUZ, 15. \u0130T\u0130GM Grup M\u00fcd\u00fcr Yard\u0131mc\u0131s\u0131 \u0130lhami C\u0130VELEK, 8. \u0130T\u0130GM Grup Ba\u015f M\u00fchendisi Adem YURTSEVER, \u0130DB \u0130letim Hatlar\u0131 M\u00fcd\u00fcr\u00fc Hikmet \u00d6ZDEM\u0130R, \u0130DB \u0130letim Hatlar\u0131 M\u00fcd\u00fcr Yard\u0131mc\u0131s\u0131 Ersen \u00c7APANG\u0130L, \u0130DB Teknik \u015eef (G) Orhan DEM\u0130RHAN\u2019dan olu\u015fan Kabul Komisyonu S\u00f6zle\u015fme h\u00fck\u00fcmleri dahilinde helikopterleri, elektro-optik ekipmanlar\u0131 (termal, korona ve video kameralar ile foto\u011fraf makinesi) ve kay\u0131t sistemini tetkik ederek kabul i\u015flemini tamamlad\u0131.<\/p>\n<p>Komisyon \u00fcyeleri \u00e7evredeki iletim hatlar\u0131 \u00fczerinde u\u00e7arak elektro-optik te\u00e7hizat\u0131n \u00e7al\u0131\u015fmas\u0131n\u0131 da kontrol etti. Ayn\u0131 tarihte \u0130\u015fletme Dairesi Ba\u015fkan\u0131 M.Y\u0131lmaz H\u00d6KELEK taraf\u0131ndan heliport tesisleri, helikopterler ve g\u00f6rev te\u00e7hizat\u0131 tetkik edildi.<\/p>\n<p>S\u00f6zle\u015fme gere\u011fi y\u00fcklenici ve TE\u0130A\u015e\u2019ca verilecek kar\u015f\u0131l\u0131kl\u0131 e\u011fitimleri takiben y\u00fcklenici en ge\u00e7 Mart-2014\u2019de \u00f6ncelikle 1. ve 20. \u0130letim Tesis ve \u0130\u015fletme Grup M\u00fcd\u00fcrl\u00fcklerinin sorumlulu\u011funda bulunan iletim hatlar\u0131nda helikopterle denetleme i\u015flerine fiilen ba\u015flamay\u0131 planl\u0131yor. \u0130\u015fletme Dairesi Ba\u015fkanl\u0131\u011f\u0131 hen\u00fcz e\u011fitim safhas\u0131nda olan canl\u0131 bak\u0131m projesinde de ileride gerekli yerlerde helikopter kullan\u0131larak canl\u0131 bak\u0131m yap\u0131lmas\u0131n\u0131 hedefliyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2014\/02\/12\/teias-iletim-hatlarinin-helikopterlerle-denetlenmesi-isinde-helikopterlerin-kabulunu-yapti\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.TE\u0130A\u015e b\u00fcnyesindeki 50.000 km 380 kV ve 154 kV enerji iletim hatlar\u0131n\u0131n, hat yak\u0131n\u0131nda u\u00e7acak helikopterlere monte edilen elektro-optik ekipmanlarla havadan kontrol edilerek, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":22573,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[12825,68,61,63,67,1009,12823,165,12824,1582],"views":1600,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/22572"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=22572"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/22572\/revisions"}],"predecessor-version":[{"id":22576,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/22572\/revisions\/22576"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/22573"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=22572"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=22572"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=22572"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}