{"id":22136,"date":"2014-02-04T12:41:13","date_gmt":"2014-02-04T09:41:13","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=22136"},"modified":"2014-02-04T12:41:13","modified_gmt":"2014-02-04T09:41:13","slug":"calik-enerjiden-gurcistana-705-milyon-dolarlik-yatirim","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/calik-enerjiden-gurcistana-705-milyon-dolarlik-yatirim\/","title":{"rendered":"(Turkish) \u00c7al\u0131k Enerji`den G\u00fcrcistan`a 705 Milyon Dolarl\u0131k Yat\u0131r\u0131m&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/22136\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u00c7al\u0131k Enerji, G\u00fcrcistan`da 485 milyon dolarl\u0131k yat\u0131r\u0131mla, toplam 223.6 MW kurulu g\u00fc\u00e7te iki adet hidroelektrik santrali kuracak. Daha \u00f6nce ald\u0131\u011f\u0131 220 milyon dolarl\u0131k do\u011falgaz santrali yat\u0131r\u0131m\u0131yla birlikte \u00c7al\u0131k`\u0131n G\u00fcrcistan`daki yat\u0131r\u0131m tutar\u0131 705 milyon dolar\u0131 bulacak.<\/strong><\/p>\n<p>Rioni Nehri \u00fczerinde pe\u015fpe\u015fe iki adet barajl\u0131 hidroelektrik santrali kurulmas\u0131na ili\u015fkin a\u00e7\u0131lan ihale sonu\u00e7land\u0131. G\u00fcrcistan Enerji Bakanl\u0131\u011f\u0131 ihaleyi \u00c7al\u0131k Enerji`nin kazand\u0131\u011f\u0131n\u0131 a\u00e7\u0131klad\u0131.<\/p>\n<p><strong>\u0130K\u0130 BARAJ VE HES`E 485 M\u0130LYON DOLAR<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/calik-enerjiden-gurcistana-705-milyon-dolarlik-yatirim.jpg\"><img loading=\"lazy\" class=\"size-medium wp-image-22137 alignleft\" title=\"calik-enerjiden-gurcistana-705-milyon-dolarlik-yatirim\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/calik-enerjiden-gurcistana-705-milyon-dolarlik-yatirim-300x196.jpg\" alt=\"\" width=\"300\" height=\"196\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/calik-enerjiden-gurcistana-705-milyon-dolarlik-yatirim-300x196.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/calik-enerjiden-gurcistana-705-milyon-dolarlik-yatirim-76x50.jpg 76w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/calik-enerjiden-gurcistana-705-milyon-dolarlik-yatirim.jpg 417w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p>\u0130hale \u015fartnamesine g\u00f6re Rioni Nehri \u00fczerinde kurulacak Alpana baraj\u0131 ve hidroelektrik santralinin kurulu g\u00fcc\u00fc 70.6 MW. Ayn\u0131 nehir \u00fczerindeki ikinci tesis olacak Sadmeli Baraj\u0131 ve HES ise 153 MW kurulu g\u00fcce sahip olacak. \u0130ki tesisin toplam yat\u0131r\u0131m maliyeti 485 milyon dolar olarak a\u00e7\u0131kland\u0131.<\/p>\n<p><strong>\u0130K\u0130 HES 40 AYDA TAMAMLANACAK<\/strong><\/p>\n<p>G\u00fcrcistan Elektrik \u0130daresi ESCO`nun d\u00fczenledi\u011fi ihaleye kWh ba\u015f\u0131na 0.055 dolarl\u0131k fiyatla en iyi teklifi \u00c7al\u0131k Enerji sundu. \u0130halede iki baraj ve hidroelektrik santralinin in\u015faatlar\u0131n\u0131 40 ay i\u00e7inde tamamlamay\u0131 da taahh\u00fct eden \u00c7al\u0131k Enerji, iki santralden y\u0131lda yakla\u015f\u0131k 1 milyar kWh elektrik \u00fcretmeyi hedefliyor.<\/p>\n<p><strong>\u00c7ALIK, G\u00dcRC\u0130STAN`A TOPLAM 705 M\u0130LYON DOLAR YATIRACAK<\/strong><\/p>\n<p>\u00c7al\u0131k Enerji, Ocak 2014 ortalar\u0131nda yine G\u00fcrcistan`da 230 MW kurulu g\u00fcce sahip bir do\u011falgaz \u00e7evrim santrali kurmak \u00fczere kontrat imzalam\u0131\u015ft\u0131. \u00c7al\u0131k Enerji`nin 220 milyon dolar\u0131 do\u011falgaz \u00e7evrim santrali, 485 milyon dolar\u0131 iki adet baraj art\u0131 HES olmak \u00fczere G\u00fcrcistan`da ald\u0131\u011f\u0131 i\u015flerin toplam b\u00fcy\u00fckl\u00fc\u011f\u00fc 705 milyon dolar\u0131 buldu.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.enerjigunlugu.net\/calik-enerjiden-gurcistana-705-milyon-dolarlik-yat_6916.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u00c7al\u0131k Enerji, G\u00fcrcistan`da 485 milyon dolarl\u0131k yat\u0131r\u0131mla, toplam 223.6 MW kurulu g\u00fc\u00e7te iki adet hidroelektrik santrali kuracak. Daha \u00f6nce ald\u0131\u011f\u0131 220 milyon dolarl\u0131k [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":22137,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[598,63,67,1009,165,3405,35370,1090],"views":831,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/22136"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=22136"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/22136\/revisions"}],"predecessor-version":[{"id":22139,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/22136\/revisions\/22139"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/22137"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=22136"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=22136"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=22136"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}