{"id":21827,"date":"2014-01-30T10:26:12","date_gmt":"2014-01-30T07:26:12","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=21827"},"modified":"2014-01-30T10:26:12","modified_gmt":"2014-01-30T07:26:12","slug":"hazar-denizinde-yeni-petrol-platformu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/hazar-denizinde-yeni-petrol-platformu\/","title":{"rendered":"(Turkish) Hazar Denizi`nde Yeni Petrol Platformu!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/21827\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Hazar Denizi`nin Azerbaycan`a ait k\u0131sm\u0131nda bulunan Azeri-\u00c7\u0131rak-G\u00fcne\u015fli havzas\u0131ndaki &#8220;Do\u011fu \u00c7\u0131rak&#8221; platformundan petrol \u00fcretilmeye ba\u015fland\u0131. British Petrol\u00fcn (BP) Azerbaycan Ofisi`nden yap\u0131lan<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/hazar-denizinde-yeni-petrol-platformu.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-21828\" title=\"hazar-denizinde-yeni-petrol-platformu\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/hazar-denizinde-yeni-petrol-platformu-300x193.jpg\" alt=\"\" width=\"300\" height=\"193\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/hazar-denizinde-yeni-petrol-platformu-300x193.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/hazar-denizinde-yeni-petrol-platformu-77x50.jpg 77w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/hazar-denizinde-yeni-petrol-platformu.jpg 330w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a> a\u00e7\u0131klamaya g\u00f6re, Azeri-\u00c7\u0131rak-G\u00fcne\u015fli havzas\u0131ndaki Do\u011fu \u00c7\u0131rak platformunun yap\u0131m\u0131 tamamland\u0131.<\/strong><\/p>\n<p>\u0130n\u015fas\u0131na 2010 y\u0131l\u0131nda ba\u015flanan ve BP`nin Hazar`da kurdu\u011fu d\u00fcnya standartlar\u0131ndaki sekizinci platform olan Do\u011fu \u00c7\u0131rak`\u0131n g\u00fcnl\u00fck 183 bin varil petrol \u00e7\u0131karma kapasitesi bulunuyor. \u00c7\u0131rak ile Derinsulu G\u00fcne\u015fli platformlar\u0131 aras\u0131nda bulunan platformun yap\u0131m\u0131 i\u00e7in 4 milyar dolar harcand\u0131. Platform kapsam\u0131nda yeni kuyular\u0131n kaz\u0131lmas\u0131 i\u00e7in 2 milyar dolar daha yat\u0131r\u0131m yap\u0131lacak.<\/p>\n<p>Bug\u00fcne kadar 2,3 milyar varil petrol \u00e7\u0131kar\u0131lan Azeri-\u00c7\u0131rak-G\u00fcne\u015fli yataklar\u0131, BP (y\u00fczde 35,8), SOCAR (y\u00fczde 11,65), Chevron (y\u00fczde 11.3), INPEX (y\u00fczde 11), Statoil (y\u00fczde 8.), ExxonMobil (y\u00fczde 8), TPAO (y\u00fczde 6.8), ITOCHU (y\u00fczde 4.3) ve ONGC Videsh Limited (OVL) (y\u00fczde 2.7) \u015firketlerinden olu\u015fan konsorsiyum taraf\u0131ndan i\u015fletiliyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/hazar-denizinde-yeni-petrol-platformu_6862.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Hazar Denizi`nin Azerbaycan`a ait k\u0131sm\u0131nda bulunan Azeri-\u00c7\u0131rak-G\u00fcne\u015fli havzas\u0131ndaki &#8220;Do\u011fu \u00c7\u0131rak&#8221; platformundan petrol \u00fcretilmeye ba\u015fland\u0131. British Petrol\u00fcn (BP) Azerbaycan Ofisi`nden yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, Azeri-\u00c7\u0131rak-G\u00fcne\u015fli [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":21828,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,44],"tags":[12503,12504,853,12505,63,67,1009,165,59,79,7317,1369],"views":1179,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/21827"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=21827"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/21827\/revisions"}],"predecessor-version":[{"id":21830,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/21827\/revisions\/21830"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/21828"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=21827"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=21827"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=21827"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}