{"id":21188,"date":"2014-01-20T17:19:38","date_gmt":"2014-01-20T14:19:38","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=21188"},"modified":"2014-01-20T18:18:43","modified_gmt":"2014-01-20T15:18:43","slug":"akfen-holdingin-mugladaki-sekiyaka-ii-hes-1%e2%80%b2i-enerji-uretimine-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akfen-holdingin-mugladaki-sekiyaka-ii-hes-1%e2%80%b2i-enerji-uretimine-basladi\/","title":{"rendered":"(Turkish) Akfen Holding\u2019in Mu\u011fla\u2019daki Sekiyaka II HES 1\u2032inde Enerji \u00dcretimi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/21188\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Mu\u011fla\u2019da bulunan Sekiyaka II HES 1\u2032in \u00fcretime ba\u015flamas\u0131yla Akfen HES, faaliyet g\u00f6sterdi\u011fi 9 hidroelektrik santralinde toplam 144,5 MW kurulu g\u00fc\u00e7 kapasitesine ve y\u0131ll\u0131k toplam 563 GWs \u00fcretim kapasitesine ula\u015ft\u0131.<\/strong><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/akfen-holdingin-mugladaki-sekiyaka-ii-hes-1\u2032i-enerji-uretimine-basladi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-21189\" title=\"akfen-holdingin-mugladaki-sekiyaka-ii-hes-1\u2032i-enerji-uretimine-basladi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/akfen-holdingin-mugladaki-sekiyaka-ii-hes-1\u2032i-enerji-uretimine-basladi-300x211.jpg\" alt=\"\" width=\"300\" height=\"211\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/akfen-holdingin-mugladaki-sekiyaka-ii-hes-1\u2032i-enerji-uretimine-basladi-300x211.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/akfen-holdingin-mugladaki-sekiyaka-ii-hes-1\u2032i-enerji-uretimine-basladi-70x50.jpg 70w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/akfen-holdingin-mugladaki-sekiyaka-ii-hes-1\u2032i-enerji-uretimine-basladi.jpg 467w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Akfen Holding\u2019e ba\u011fl\u0131 Akfenhes Yat\u0131r\u0131mlar\u0131 ve Enerji \u00dcretim A.\u015e.\u2019nin ba\u011fl\u0131 ortakl\u0131\u011f\u0131 Beyobas\u0131 Enerji \u00dcretimi A.\u015e.\u2019nin, Mu\u011fla ilinde bulunan Sekiyaka II HES 1 projesi enerji \u00fcretimine ba\u015flad\u0131. Enerji Piyasas\u0131 D\u00fczenleme Kurulu (EPDK) taraf\u0131ndan verilen izinle \u00fcretime ge\u00e7en ve 2,3 MW kurulu g\u00fc\u00e7 kapasitesine sahip olan Sekiyaka II HES 1\u2032in y\u0131ll\u0131k 12,3 GWs elektrik \u00fcretmesi bekleniyor.<\/p>\n<p>Akfen Holding, 20 Ocak 2014, Pazartesi g\u00fcn\u00fc Kamuoyu Ayd\u0131nlatma Platformu\u2019na (KAP) yapt\u0131\u011f\u0131 a\u00e7\u0131klamada yat\u0131r\u0131m program\u0131na uygun olarak HES santrallerini ticari enerji \u00fcretimi i\u00e7in devreye almaya devam edeceklerini belirtti. Akfen Holding, 6 Haziran 2013 tarihinde 26 MW kurulu g\u00fcce sahip Karasular Enerji \u00dcretim ve Ticaret A.\u015e.\u2019nin de sat\u0131\u015f\u0131 sonras\u0131nda, 17 Ocak 2014 tarihi itibar\u0131yle, ba\u011fl\u0131 ortakl\u0131klar\u0131 vas\u0131tas\u0131yla faaliyet g\u00f6sterdi\u011fi 9 hidroelektrik santralinde toplam 144,5 MW kurulu g\u00fc\u00e7 kapasitesine ve y\u0131ll\u0131k toplam 563 GWs \u00fcretim kapasitesine ula\u015ft\u0131.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2014\/01\/20\/akfen-holdingin-muglada-bulunan-sekiyaka-ii-hes-1i-enerji-uretimine-basladi\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Mu\u011fla\u2019da bulunan Sekiyaka II HES 1\u2032in \u00fcretime ba\u015flamas\u0131yla Akfen HES, faaliyet g\u00f6sterdi\u011fi 9 hidroelektrik santralinde toplam 144,5 MW kurulu g\u00fc\u00e7 kapasitesine ve y\u0131ll\u0131k [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":21189,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[1207,19,63,67,1009,165,18,35370,12230,1090,3089,12229],"views":1924,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/21188"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=21188"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/21188\/revisions"}],"predecessor-version":[{"id":21206,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/21188\/revisions\/21206"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/21189"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=21188"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=21188"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=21188"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}