{"id":21147,"date":"2014-01-20T10:43:31","date_gmt":"2014-01-20T07:43:31","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=21147"},"modified":"2014-01-20T10:48:01","modified_gmt":"2014-01-20T07:48:01","slug":"yingli-solar-2013-yilinda-satis-rekoru-gerceklestirdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yingli-solar-2013-yilinda-satis-rekoru-gerceklestirdi\/","title":{"rendered":"(Turkish) Yingli Solar 2013 Y\u0131l\u0131nda Sat\u0131\u015f Rekoru Ger\u00e7ekle\u015ftirdi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/21147\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Yingli Solar, 2012\u2019de d\u00fcnya pazar liderli\u011fi ile 2013 y\u0131l\u0131n\u0131 da rekor sat\u0131\u015fla ger\u00e7ekle\u015ftirip 3 GW \u00fczerinde panel tedarik eden ilk g\u00fcne\u015f paneli \u00fcreticisi oldu. Merkezi \u00c7in\u2019de bulunan ve d\u00fcnyan\u0131n en b\u00fcy\u00fck g\u00fcne\u015f paneli \u00fcreticilerinden biri olan Yingli Solar, 2012\u2019de d\u00fcnya pazar lideri olarak, 2013 y\u0131l\u0131nda rekor sat\u0131\u015f ger\u00e7ekle\u015ftirip 3 GW \u00fczerinde panel tedarik eden ilk g\u00fcne\u015f paneli \u00fcreticisi oldu. Yingli Solar kazand\u0131\u011f\u0131 d\u00fcnya \u00e7ap\u0131ndaki ba\u015far\u0131y\u0131 2014 y\u0131l\u0131nda da s\u00fcrd\u00fcrmeyi ama\u00e7l\u0131yor.<\/strong><\/p>\n<p><strong>D\u00dcNYADA GER\u00c7EKLE\u015eEN BA\u015eARIS<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/07\/gunes-paneli1.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-735\" title=\"gunes-paneli\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/07\/gunes-paneli1-300x188.jpg\" alt=\"\" width=\"300\" height=\"188\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/07\/gunes-paneli1-300x188.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/07\/gunes-paneli1-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/07\/gunes-paneli1.jpg 400w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>I T\u00dcRK\u0130YE\u2019YE YANSIYOR<\/strong><br \/>\nYingli Solar T\u00fcrkiye \u00dclke M\u00fcd\u00fcr\u00fc U\u011fur K\u0131l\u0131\u00e7, \u201c2012 y\u0131l\u0131n\u0131 d\u00fcnya lideri olarak kapatm\u0131\u015ft\u0131k, liderli\u011fimizi 2013 y\u0131l\u0131nda da devam ettirmeyi ba\u015fard\u0131k. Yingli Solar, global bir marka olarak kalitesi, raporlanarak kan\u0131tlanan y\u00fcksek verimlili\u011fi ve herkes taraf\u0131ndan tercih edilen \u00fcr\u00fcnleriyle d\u00fcnya \u00e7ap\u0131nda g\u00f6sterdi\u011fi ba\u015far\u0131y\u0131 T\u00fcrkiye\u2019ye ta\u015f\u0131yor ve g\u00fcne\u015f enerjisi sekt\u00f6r\u00fcnde \u00f6nc\u00fc olmay\u0131 hedefliyor. Global ba\u015far\u0131n\u0131n bize verdi\u011fi cesaretle 2014 y\u0131l\u0131nda da T\u00fcrkiye\u2019de \u00f6nemli projeleri hayata ge\u00e7irmek \u00fczere \u00e7al\u0131\u015fmalar\u0131m\u0131z\u0131 s\u00fcrd\u00fcr\u00fcyoruz\u201d dedi.<\/p>\n<p><strong>G\u00dcNE\u015e PANEL\u0130NDE\u00a0B\u0130R YILDA 3 GW&#8230;<\/strong><br \/>\nD\u00fcnyada 20 b\u00f6lgesel \u00fclke ofisinde, 18 binden fazla \u00e7al\u0131\u015fan\u0131, 25 y\u0131ll\u0131k tecr\u00fcbesi, 7 GW\u2019tan fazla kurulu park\u0131 ve 2.5 GW \u00fcretim kapasitesiyle faaliyet g\u00f6steren, d\u00fcnyan\u0131n en b\u00fcy\u00fck g\u00fcne\u015f paneli \u00fcreticilerinden Yingli Solar, 2013 y\u0131l\u0131nda lider konumunu s\u00fcrd\u00fcr\u00fcp d\u00fcnyada sekt\u00f6r\u00fcn 1 numaras\u0131 olmay\u0131 ba\u015fard\u0131. Dahas\u0131, bir y\u0131l i\u00e7erisinde 3 GW \u00fczerinde g\u00fcne\u015f paneli tedarik eden ilk tedarik\u00e7i firma olma ba\u015far\u0131s\u0131n\u0131 g\u00f6sterdi.<\/p>\n<p>2012 y\u0131l\u0131n\u0131 global\u00a0olarak 2.2 GW kapasitesinde g\u00fcne\u015f paneli sat\u0131\u015f\u0131 ger\u00e7ekle\u015ftirip lider bitiren Yingli Solar, 2013\u2019\u00fcn ikinci \u00e7eyre\u011finde ise\u00a0t\u00fcm PV \u00fcreticileri aras\u0131nda 0,8 GW ile tek ba\u015f\u0131na t\u00fcm global sat\u0131\u015f\u0131n y\u00fczde 8\u2019ini ger\u00e7ekle\u015ftirerek bir d\u00fcnya rekorunu k\u0131rm\u0131\u015ft\u0131.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/yingli-solardan-rekor-satis_6680.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Yingli Solar, 2012\u2019de d\u00fcnya pazar liderli\u011fi ile 2013 y\u0131l\u0131n\u0131 da rekor sat\u0131\u015fla ger\u00e7ekle\u015ftirip 3 GW \u00fczerinde panel tedarik eden ilk g\u00fcne\u015f paneli \u00fcreticisi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":735,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1009,165,227,13,1657,1405,12221,6681,4206],"views":695,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/21147"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=21147"}],"version-history":[{"count":7,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/21147\/revisions"}],"predecessor-version":[{"id":21155,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/21147\/revisions\/21155"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/735"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=21147"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=21147"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=21147"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}