{"id":21118,"date":"2014-01-19T20:54:50","date_gmt":"2014-01-19T17:54:50","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=21118"},"modified":"2014-01-19T20:54:50","modified_gmt":"2014-01-19T17:54:50","slug":"ak-ar-elektrik-duzkoy-heste-kapasite-arttiracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ak-ar-elektrik-duzkoy-heste-kapasite-arttiracak\/","title":{"rendered":"(Turkish) Ak-Ar Elektrik, D\u00fczk\u00f6y HES\u2019te Kapasite Artt\u0131racak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/21118\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ak-Ar Elektrik \u00dcretim A.\u015e., Trabzon D\u00fczk\u00f6y\u2019de D\u00fczk\u00f6y Reg\u00fclat\u00f6r\u00fc ve HES Projesi\u2019nin kapasitesini artt\u0131rmak \u00fczere \u00e7al\u0131\u015fmalar\u0131na ba\u015flad\u0131. Proje i\u00e7in izin i\u015flemleri devam ederken, \u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetleme Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc, Proje i\u00e7in \u00c7ED ba\u015fvu<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/ak-ar-elektrik-duzkoy-heste-kapasite-arttiracak.jpg\"><img loading=\"lazy\" class=\"alignleft size-full wp-image-21119\" title=\"ak-ar-elektrik-duzkoy-heste-kapasite-arttiracak\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/ak-ar-elektrik-duzkoy-heste-kapasite-arttiracak.jpg\" alt=\"\" width=\"273\" height=\"185\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/ak-ar-elektrik-duzkoy-heste-kapasite-arttiracak.jpg 273w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/ak-ar-elektrik-duzkoy-heste-kapasite-arttiracak-73x50.jpg 73w\" sizes=\"(max-width: 273px) 100vw, 273px\" \/><\/a>rusunu uygun bularak, \u00c7ED s\u00fcrecini ba\u015flatt\u0131.<\/strong><\/p>\n<p><strong>HES\u2019\u0130N KURULU G\u00dcC\u00dc 6,3 MWm<\/strong><\/p>\n<p>Trabzon \u0130li, D\u00fczk\u00f6y \u0130l\u00e7esi, Kale Dere \u00fczerinde yap\u0131m\u0131 planlanan HES\u2019in kurulu g\u00fcc\u00fc 5.74 MWm\u2019dan 6.306 MWm\/6.120 MWe\u2019a \u00e7\u0131kart\u0131lacak.<br \/>\nDaha \u00f6nce 5.74 MWm kurulu g\u00fcc\u00fcndeki projesine 30.12.2010 tarihinde \u201c\u00c7ED Gerekli De\u011fildir Karar\u0131\u201d al\u0131nm\u0131\u015f olup, projenin kapasitesinin artt\u0131r\u0131lmas\u0131 ve g\u00fczergah de\u011fi\u015fikli\u011fi yap\u0131lmas\u0131na karar verildi.<\/p>\n<p>Kale Deresi \u00fczerinde, 599.00 m talveg kotunda yer alan D\u00fczk\u00f6y Reg\u00fclat\u00f6r\u00fc ile \u00e7evrilen 3.50 m3\/s maksimum debisindeki su, uzunlu\u011fu 1610 m olan enerji t\u00fcneli vas\u0131tas\u0131yla uzunlu\u011fu 105.10 m olan cebri boru t\u00fcneline ula\u015ft\u0131r\u0131lacak, oradan toplam uzunlu\u011fu 1410.70 m olan CTP boru vas\u0131tas\u0131yla 1.20 m \u00e7ap\u0131ndaki cebri boru ile iki adet Pelton t\u00fcrbinine d\u00fc\u015f\u00fcr\u00fclecek, d\u00fc\u015f\u00fc sonucu t\u00fcrbin hareketinden enerji sa\u011flanmakta bu enerjide elektri\u011fe \u00e7evrilerek piyasaya arz edilecek.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/ak-ar-elektrik-duzkoy-heste-kapasite-arttiracak_6672.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ak-Ar Elektrik \u00dcretim A.\u015e., Trabzon D\u00fczk\u00f6y\u2019de D\u00fczk\u00f6y Reg\u00fclat\u00f6r\u00fc ve HES Projesi\u2019nin kapasitesini artt\u0131rmak \u00fczere \u00e7al\u0131\u015fmalar\u0131na ba\u015flad\u0131. Proje i\u00e7in izin i\u015flemleri devam ederken, \u00c7evresel [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":21119,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[12204,12208,5927,8055,12207,12205,63,67,1009,165,35370,1090,12206,4000],"views":800,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/21118"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=21118"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/21118\/revisions"}],"predecessor-version":[{"id":21121,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/21118\/revisions\/21121"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/21119"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=21118"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=21118"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=21118"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}