{"id":20649,"date":"2014-01-10T10:12:24","date_gmt":"2014-01-10T07:12:24","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=20649"},"modified":"2014-01-10T10:15:47","modified_gmt":"2014-01-10T07:15:47","slug":"2%c3%97255-mw-soma-denis-linyit-termik-santrali-projesi-icin-imzalar-atildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/2%c3%97255-mw-soma-denis-linyit-termik-santrali-projesi-icin-imzalar-atildi\/","title":{"rendered":"(Turkish) 2\u00d7255 MW Soma Deni\u015f Linyit Termik Santrali Projesi \u0130\u00e7in \u0130mzalar At\u0131ld\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/20649\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Kolin \u015eirketler Grubu b\u00fcnyesinde faaliyet g\u00f6steren Hidro-Gen Enerji \u0130thalat \u0130hracat Da\u011f\u0131t\u0131m ve Ticaret A.\u015e. taraf\u0131ndan Manisa Soma\u2019da g<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/2x255-mw-soma-denis-linyit-yakitli-termik-santral-projesi-icin-imzalar-atildi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-20650\" title=\"2x255-mw-soma-denis-linyit-yakitli-termik-santral-projesi-icin-imzalar-atildi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/2x255-mw-soma-denis-linyit-yakitli-termik-santral-projesi-icin-imzalar-atildi-300x212.jpg\" alt=\"\" width=\"300\" height=\"212\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/2x255-mw-soma-denis-linyit-yakitli-termik-santral-projesi-icin-imzalar-atildi-300x212.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/2x255-mw-soma-denis-linyit-yakitli-termik-santral-projesi-icin-imzalar-atildi-70x50.jpg 70w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/2x255-mw-soma-denis-linyit-yakitli-termik-santral-projesi-icin-imzalar-atildi.jpg 474w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>er\u00e7ekle\u015ftirilmesi planlanan, 2\u00d7255 MW Soma Deni\u015f Linyit Yak\u0131tl\u0131 Termik Santral Projesinin yap\u0131m\u0131 i\u00e7in Harbin Electric International Company Limited aras\u0131nda anahtar teslim olarak s\u00f6zle\u015fme imzaland\u0131.<\/strong><\/p>\n<p>Anla\u015fma kapsam\u0131nda buhar t\u00fcrbini Siemens\u2019ten, ak\u0131\u015fkan yatakl\u0131 kazan Foster Wheeler firmas\u0131ndan tedarik edilecek.<\/p>\n<p>5 aral\u0131k 2013 g\u00fcn\u00fc Ankara\u2019da d\u00fczenlenen t\u00f6renle imzalar at\u0131ld\u0131.<\/p>\n<p>Bu proje yerli linyit k\u00f6m\u00fcr potansiyelini kullanmak isteyen T\u00fcrkiye i\u00e7in \u00a0\u00f6nemli bir kilometre ta\u015f\u0131 olarak g\u00f6r\u00fcl\u00fcyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2014\/01\/09\/2x255-mw-soma-denis-linyit-yakitli-termik-santral-projesi-icin-imzalar-atildi\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Kolin \u015eirketler Grubu b\u00fcnyesinde faaliyet g\u00f6steren Hidro-Gen Enerji \u0130thalat \u0130hracat Da\u011f\u0131t\u0131m ve Ticaret A.\u015e. taraf\u0131ndan Manisa Soma\u2019da ger\u00e7ekle\u015ftirilmesi planlanan, 2\u00d7255 MW Soma Deni\u015f [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":20650,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[63,67,1009,165,11994,11991,11990,11995,11993,11996,11992],"views":1114,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/20649"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=20649"}],"version-history":[{"count":9,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/20649\/revisions"}],"predecessor-version":[{"id":20659,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/20649\/revisions\/20659"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/20650"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=20649"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=20649"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=20649"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}