{"id":20375,"date":"2014-01-05T15:51:49","date_gmt":"2014-01-05T12:51:49","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=20375"},"modified":"2014-01-05T15:51:49","modified_gmt":"2014-01-05T12:51:49","slug":"ken-kipas-elektrikden-aydina-24-mwlik-jes","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ken-kipas-elektrikden-aydina-24-mwlik-jes\/","title":{"rendered":"(Turkish) Ken Kipa\u015f Elektrik\u2019den Ayd\u0131n\u2019a 24 MW\u2019l\u0131k JES!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/20375\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ken Kipa\u015f Elektrik \u00dcretim A.\u015e., Ayd\u0131n\u2019da 24 MW\u2019l\u0131k Ken-2 Jeotermal Enerji Santrali`ni kurmak \u00fczere \u00e7al\u0131\u015fmalara ba\u015flad\u0131. Proje i\u00e7in \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) s\u00fcreci ba\u015flam\u0131\u015f olup, gerekli di\u011fer izinlerin de al\u0131nmas\u0131 ile \u00fcretim lisans\u0131n\u0131n verilmesi bekleniyor.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/ken-kipas-elektrikden-aydina-24-mwlik-jes.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-20376\" title=\"ken-kipas-elektrikden-aydina-24-mwlik-jes\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/ken-kipas-elektrikden-aydina-24-mwlik-jes-300x201.jpg\" alt=\"\" width=\"300\" height=\"201\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/ken-kipas-elektrikden-aydina-24-mwlik-jes-300x201.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/ken-kipas-elektrikden-aydina-24-mwlik-jes-500x335.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/ken-kipas-elektrikden-aydina-24-mwlik-jes-74x50.jpg 74w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/ken-kipas-elektrikden-aydina-24-mwlik-jes.jpg 600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p>Ayd\u0131n ili Kalfaf\u00f6y civar\u0131nda J-667 i\u015fletme ruhsat numaral\u0131 1.873,4 Ha\u2019l\u0131k \u201cJeotermal Kaynaklar ve Do\u011fal Mineralli Sular \u0130\u015fletme Ruhsat\u0131\u201d s\u0131n\u0131rlar\u0131 i\u00e7inde mevcut ve a\u00e7\u0131lmas\u0131 planlanan kuyulardan jeotermal kayna\u011f\u0131n \u00e7\u0131kar\u0131lmas\u0131 ve bu kaynaklar kullan\u0131larak 16.047m2 alan \u00fczerinde Santral\u2019\u0131n kurulmas\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<p>Ken Kipa\u015f Elektrik Uretim A.\u015e. taraf\u0131ndan kurulmas\u0131 planlanan Jeotermal Enerji Santrali tesisinde y\u0131lda 190.000.000 kWh elektrik enerjisi \u00fcretilmesi hedefleniyor.<\/p>\n<p><strong>SANTRAL\u0130N YER\u0130<\/strong><br \/>\nKurulmas\u0131 planlanan \u201cKen-2 Jeotermal Enerji Santrali\u201d en yak\u0131n ba\u011f evi olan yap\u0131lara ku\u015f ucumu yakla\u015f\u0131k 350 m mesafede, kuzeydo\u011fusunda bulunan \u201cY\u0131lmazk\u00f6y\u201d koyundaki en yak\u0131n yap\u0131lara ku\u015f ucumu yakla\u015f\u0131k 1 km, kuzeybat\u0131s\u0131nda bulunan \u201cKalfak\u00f6y\u201d k\u00f6y\u00fcndeki en yak\u0131n yap\u0131lara ku\u015f ucumu yakla\u015f\u0131k 3 km, g\u00fcneyindeki \u201cAyd\u0131n- Denizli Karayolu\u201dna ku\u015f ucumu yakla\u015f\u0131k 750 m, bat\u0131s\u0131ndaki 154 kv \u201cAyd\u0131n Trafo Merkezi\u201dne ku\u015f ucumu yakla\u015f\u0131k 1 km, guneybat\u0131s\u0131ndaki Ayd\u0131n \u0130l merkezindeki Il\u0131caba\u015f\u0131 Mahallesine ku\u015f ucumu yakla\u015f\u0131k 800 m mesafede bulunuyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/ken-kipas-elektrikden-aydina-24-mwlik-jes_6404.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ken Kipa\u015f Elektrik \u00dcretim A.\u015e., Ayd\u0131n\u2019da 24 MW\u2019l\u0131k Ken-2 Jeotermal Enerji Santrali`ni kurmak \u00fczere \u00e7al\u0131\u015fmalara ba\u015flad\u0131. Proje i\u00e7in \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) s\u00fcreci [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":20376,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[7179,2878,4275,63,67,1009,165,58,56,6322,11836,11837,6660],"views":1191,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/20375"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=20375"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/20375\/revisions"}],"predecessor-version":[{"id":20378,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/20375\/revisions\/20378"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/20376"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=20375"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=20375"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=20375"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}