{"id":203557,"date":"2026-11-09T20:42:27","date_gmt":"2026-11-09T17:42:27","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=203557"},"modified":"2026-11-09T20:43:03","modified_gmt":"2026-11-09T17:43:03","slug":"aksa-enerjiden-3uncu-ceyrekte-52-milyar-tl-favok-ve-yeni-buyume-hamleleri","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksa-enerjiden-3uncu-ceyrekte-52-milyar-tl-favok-ve-yeni-buyume-hamleleri\/","title":{"rendered":"(Turkish) &#8217;Aksa Enerji&#8217;den 3. \u00c7eyrekte 5,2 Milyar TL FAV\u00d6K ve Yeni B\u00fcy\u00fcme Hamleleri"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/203557\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>8 \u00fclkedeki 16 santral operasyonu ve 3.700 MW kurulu g\u00fcc\u00fcyle global bir enerji \u015firketi konumuna ula\u015fan Aksa Enerji, 2026 y\u0131l\u0131n\u0131n dokuz ayl\u0131k d\u00f6nemine ili\u015fkin konsolide finansal sonu\u00e7lar\u0131n\u0131 a\u00e7\u0131klad\u0131. \u015eirketin dokuz ayl\u0131k cirosu 35,4 milyar TL, FAV\u00d6K\u2019\u00fc 12,8 milyar TL ve net d\u00f6nem k\u00e2r\u0131 2,8 milyar TL olarak ger\u00e7ekle\u015fti. FAV\u00d6K marj\u0131, ge\u00e7en y\u0131l\u0131n ayn\u0131 d\u00f6nemine g\u00f6re 4 puan art\u0131\u015fla %36 seviyesine ula\u015ft\u0131.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-203559\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/11\/aksa-enerjiden-3uncu-ceyrekte-52-milyar-tl-favok-ve-yeni-buyume-hamleleri.jpg\" alt=\"\" width=\"500\" height=\"335\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/11\/aksa-enerjiden-3uncu-ceyrekte-52-milyar-tl-favok-ve-yeni-buyume-hamleleri.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/11\/aksa-enerjiden-3uncu-ceyrekte-52-milyar-tl-favok-ve-yeni-buyume-hamleleri-300x201.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/11\/aksa-enerjiden-3uncu-ceyrekte-52-milyar-tl-favok-ve-yeni-buyume-hamleleri-500x335.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/11\/aksa-enerjiden-3uncu-ceyrekte-52-milyar-tl-favok-ve-yeni-buyume-hamleleri-75x50.jpg 75w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Haziran ay\u0131nda devreye al\u0131nan 264 MW b\u00fcy\u00fckl\u00fc\u011f\u00fcndeki Kazakistan santrali, 58 MW b\u00fcy\u00fckl\u00fc\u011f\u00fcndeki Gaziantep depolamal\u0131 g\u00fcne\u015f enerjisi santrali ve 50 MW g\u00fcce sahip \u015eanl\u0131urfa m\u00fcstakil depolama tesisi yat\u0131r\u0131mlar\u0131na ek olarak Gana Kumasi santralinin de temmuz ay\u0131nda kombine \u00e7evriminin tamamlanmas\u0131yla 2026 y\u0131l\u0131n\u0131n \u00fc\u00e7\u00fcnc\u00fc \u00e7eyre\u011finde faaliyet kar\u0131nda belirgin iyile\u015fme g\u00f6zlemlendi.<\/p>\n<p>Aksa Enerji, yeni yat\u0131r\u0131m kararlar\u0131na imza atarken, uluslararas\u0131 finansman kaynaklar\u0131yla yat\u0131r\u0131mlar\u0131n\u0131 destekleyen ad\u0131mlar att\u0131. \u015eirket, Gana\u2019daki 825 MW b\u00fcy\u00fckl\u00fc\u011f\u00fcndeki Takoradi santral projesi i\u00e7in 20 y\u0131l vadeli ve ABD dolar\u0131 bazl\u0131 garantili sat\u0131\u015f anla\u015fmas\u0131 imzalarken, Senegal do\u011fal gaz santrali ile Mersin depolamal\u0131 r\u00fczg\u00e2r enerjisi santrali i\u00e7in uzun vadeli uluslararas\u0131 finansman anla\u015fmalar\u0131 tamamland\u0131. Ekim ay\u0131nda da yat\u0131r\u0131mlar\u0131n\u0131 devreye almaya devam eden Aksa Enerji, K\u0131r\u015fehir\u2019deki Al\u0131\u00e7 Depolamal\u0131 GES\u2019i ticari i\u015fletmeye alarak yenilenebilir enerjideki kurulu g\u00fcc\u00fcn\u00fc 156 MW\u2019a \u00e7\u0131kard\u0131. \u015eirket, Ekim ay\u0131nda KKTC\u2019deki Kalecik Santrali\u2019nin kurulu g\u00fcc\u00fcn\u00fc 35 MW art\u0131\u015fla 223 MW\u2019a y\u00fckseltmek \u00fczere K\u0131br\u0131s T\u00fcrk Elektrik Kurumu (KIB-TEK) ile ek protokol imzalad\u0131\u011f\u0131n\u0131 duyurdu.<\/p>\n<h3><strong>Gana\u2019da 825 MW\u2019l\u0131k Yat\u0131r\u0131mla Uzun Vadeli B\u00fcy\u00fcme<\/strong><\/h3>\n<p>Aksa Enerji, \u00fc\u00e7\u00fcnc\u00fc \u00e7eyrekte Gana\u2019n\u0131n Takoradi b\u00f6lgesinde 825 MW kapasiteli do\u011fal gaz kombine \u00e7evrim santrali kurmak \u00fczere Electricity Company of Ghana ile 20 y\u0131l s\u00fcreli, ABD dolar\u0131 bazl\u0131 garantili enerji sat\u0131\u015f anla\u015fmas\u0131 imzalad\u0131. Santralin kurulumunu ve i\u015fletmesini \u00fcstlenecek \u015firket, bu yat\u0131r\u0131mla Gana\u2019daki \u00fcretim kapasitesini art\u0131r\u0131rken, uzun vadeli s\u00f6zle\u015fmelere dayanan d\u00f6viz bazl\u0131 gelir yap\u0131s\u0131n\u0131 da g\u00fc\u00e7lendirmeyi hedefliyor.<\/p>\n<p>Kumasi 2. faz ve Takoradi yat\u0131r\u0131mlar\u0131n\u0131n tamamlanmas\u0131yla Aksa Enerji\u2019nin Gana\u2019daki toplam kurulu g\u00fcc\u00fcn\u00fcn 1.545 MW\u2019a ula\u015faca\u011f\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor. Senegal, Gabon ve Burkina Faso yat\u0131r\u0131mlar\u0131n\u0131n da devreye girmesiyle \u015firketin Afrika\u2019daki toplam kurulu g\u00fcc\u00fcn\u00fcn 2.240 MW\u2019a y\u00fckselmesi hedefleniyor.<\/p>\n<h3><strong>Senegal ve Mersin Yat\u0131r\u0131mlar\u0131na Uzun Vadeli Finansman<\/strong><\/h3>\n<p>Aksa Enerji, Senegal\u2019deki 255 MW kapasiteli do\u011fal gaz kombine \u00e7evrim santrali i\u00e7in Helaba Bank ile SERV garantili, 10 y\u0131l vadeli 57 milyon avroluk kredi s\u00f6zle\u015fmesi imzalad\u0131.\u00a0Santralde \u00fcretilecek elektri\u011fin 25 y\u0131l boyunca avroya endeksli tarife ve al\u0131m garantisi kapsam\u0131nda \u015febekeye aktar\u0131lmas\u0131 planlan\u0131yor.<\/p>\n<p>T\u00fcrkiye\u2019deki depolamal\u0131 yenilenebilir enerji yat\u0131r\u0131mlar\u0131 kapsam\u0131nda ise 112 MW kapasiteli Mersin Depolamal\u0131 R\u00fczg\u00e2r Enerjisi Santrali i\u00e7in BBVA\u2019n\u0131n Hong Kong \u015fubesiyle 124 milyon ABD dolar\u0131 tutar\u0131nda kredi s\u00f6zle\u015fmesi Sinosure garantisi kapsam\u0131nda imzaland\u0131.<\/p>\n<h3><strong>Naci A\u011fbal: \u201cB\u00fcy\u00fcme hedeflerimizi uzun vadeli garantili gelir yap\u0131s\u0131 ve finansal disiplinle destekliyoruz\u201d<\/strong><\/h3>\n<div id=\"attachment_203560\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img aria-describedby=\"caption-attachment-203560\" loading=\"lazy\" class=\"wp-image-203560\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/11\/naci-agbal.jpg\" alt=\"\" width=\"500\" height=\"382\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/11\/naci-agbal.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/11\/naci-agbal-300x229.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/11\/naci-agbal-500x382.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/11\/naci-agbal-65x50.jpg 65w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/11\/naci-agbal-260x200.jpg 260w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><p id=\"caption-attachment-203560\" class=\"wp-caption-text\">Aksa Enerji CEO\u2019su ve \u0130cra Kurulu Ba\u015fkan\u0131\u00a0Naci A\u011fbal<\/p><\/div>\n<p><strong>Aksa Enerji CEO\u2019su ve \u0130cra Kurulu Ba\u015fkan\u0131<\/strong>\u00a0<strong>Naci A\u011fbal<\/strong>, \u015firketin performans\u0131na ili\u015fkin de\u011ferlendirmesinde \u015funlar\u0131 s\u00f6yledi:\u00a0<em>\u201cAksa Enerji olarak global b\u00fcy\u00fcme stratejimizi \u015fekillendirirken faaliyet g\u00f6sterdi\u011fimiz \u00fclkelerin uzun vadeli enerji ihtiyac\u0131n\u0131 ve yat\u0131r\u0131mlar\u0131m\u0131z\u0131n ekonomik de\u011ferini birlikte de\u011ferlendiriyoruz. \u00d6nceli\u011fimiz, mevcut operasyonlar\u0131m\u0131zda verimlili\u011fi art\u0131r\u0131rken yeni yat\u0131r\u0131mlar\u0131m\u0131zla da \u015firketimizin gelir \u00fcretme kapasitesini ve k\u00e2rl\u0131l\u0131\u011f\u0131n\u0131 g\u00fc\u00e7lendirmek. T\u00fcrkiye, Kazakistan ve Gana\u2019da devreye ald\u0131\u011f\u0131m\u0131z yat\u0131r\u0131mlar\u0131n \u00fc\u00e7\u00fcnc\u00fc \u00e7eyrekte faaliyet k\u00e2r\u0131m\u0131za sa\u011flad\u0131\u011f\u0131 katk\u0131, b\u00fcy\u00fcme stratejimizin finansal sonu\u00e7lar\u0131m\u0131za yans\u0131d\u0131\u011f\u0131n\u0131 g\u00f6steriyor. Uzun vadeli sat\u0131\u015f s\u00f6zle\u015fmeleri ve \u00e7e\u015fitlendirilmi\u015f finansman kaynaklar\u0131, bu yakla\u015f\u0131m\u0131m\u0131z\u0131 destekleyen temel unsurlar aras\u0131nda yer al\u0131yor.<\/em><\/p>\n<p><em>Yat\u0131r\u0131m d\u00f6neminde finansal disiplinin korunmas\u0131n\u0131, s\u00fcrd\u00fcr\u00fclebilir y\u00fcksek b\u00fcy\u00fcme a\u00e7\u0131s\u0131ndan belirleyici g\u00f6r\u00fcyoruz. Bu nedenle kaynaklar\u0131m\u0131z\u0131 kullan\u0131rken projelerimizin devreye al\u0131nma takvimini, nakit ak\u0131\u015f\u0131n\u0131 ve finansman ihtiya\u00e7lar\u0131n\u0131 birlikte ele al\u0131yoruz. Yurt d\u0131\u015f\u0131ndaki deneyimimiz ve T\u00fcrkiye\u2019de geli\u015ftirdi\u011fimiz depolamal\u0131 yenilenebilir enerji portf\u00f6y\u00fcm\u00fczle \u00f6n\u00fcm\u00fczdeki d\u00f6neme odaklan\u0131yor; yat\u0131r\u0131mlar\u0131m\u0131z\u0131 uzun vadeli de\u011fere d\u00f6n\u00fc\u015ft\u00fcrmeyi hedefliyoruz.\u201d<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. 8 \u00fclkedeki 16 santral operasyonu ve 3.700 MW kurulu g\u00fcc\u00fcyle global bir enerji \u015firketi konumuna ula\u015fan Aksa Enerji, 2026 y\u0131l\u0131n\u0131n dokuz ayl\u0131k [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":203559,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,51,53,49,50],"tags":[1571,109463,117600,109464,109465,118242,5287,13711,1011],"views":8,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/203557"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=203557"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/203557\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/203559"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=203557"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=203557"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=203557"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}