{"id":203473,"date":"2026-11-06T17:23:00","date_gmt":"2026-11-06T14:23:00","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=203473"},"modified":"2026-11-06T17:23:00","modified_gmt":"2026-11-06T14:23:00","slug":"firat-edastan-elazigin-karakocan-ilcesine-guclu-enerji-altyapi-yatirimi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/firat-edastan-elazigin-karakocan-ilcesine-guclu-enerji-altyapi-yatirimi\/","title":{"rendered":"(Turkish) &#8217;F\u0131rat EDA\u015e&#8217;tan Elaz\u0131\u011f\u2019\u0131n Karako\u00e7an \u0130l\u00e7esine G\u00fc\u00e7l\u00fc Enerji Altyap\u0131 Yat\u0131r\u0131m\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/203473\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>F\u0131rat EDA\u015e, Elaz\u0131\u011f\u2019\u0131n Karako\u00e7an il\u00e7esinde enerji arz\u0131n\u0131n s\u00fcreklili\u011fini ve hizmet kalitesini art\u0131rmak amac\u0131yla altyap\u0131 modernizasyon \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcr\u00fcyor. Birinci etap kapsam\u0131nda ger\u00e7ekle\u015ftirilen \u00e7al\u0131\u015fmalarla elektrik \u015febekesi modernize edilirken, il\u00e7enin farkl\u0131 b\u00f6lgelerinde ve k\u00f6ylerinde altyap\u0131 yat\u0131r\u0131mlar\u0131n\u0131n 2027 y\u0131l\u0131nda da devam etmesi planlan\u0131yor.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-203476\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/11\/firat-edastan-elazigin-karakocan-ilcesine-guclu-enerji-altyapi-yatirimi-1.jpg\" alt=\"\" width=\"500\" height=\"349\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/11\/firat-edastan-elazigin-karakocan-ilcesine-guclu-enerji-altyapi-yatirimi-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/11\/firat-edastan-elazigin-karakocan-ilcesine-guclu-enerji-altyapi-yatirimi-1-300x209.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/11\/firat-edastan-elazigin-karakocan-ilcesine-guclu-enerji-altyapi-yatirimi-1-500x349.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/11\/firat-edastan-elazigin-karakocan-ilcesine-guclu-enerji-altyapi-yatirimi-1-72x50.jpg 72w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>F\u0131rat Elektrik Da\u011f\u0131t\u0131m A.\u015e. (F\u0131rat EDA\u015e), Elaz\u0131\u011f\u2019\u0131n Karako\u00e7an il\u00e7esinde elektrik arz\u0131n\u0131n s\u00fcreklili\u011fini sa\u011flamak, ar\u0131za say\u0131lar\u0131n\u0131 minimize etmek ve vatanda\u015flara sunulan hizmet kalitesini en \u00fcst seviyeye \u00e7\u0131karmak amac\u0131yla haz\u0131rlanan b\u00fcy\u00fck kapsaml\u0131 altyap\u0131 yat\u0131r\u0131m\u0131na ba\u015flad\u0131. \u0130l\u00e7ede ba\u015flat\u0131lan bu modernizasyon hamlesi, b\u00f6lgenin enerji vizyonunu tamamen de\u011fi\u015ftirecek.<\/p>\n<p>\u0130lk proje i\u00e7in toplam yat\u0131r\u0131m maliyeti yakla\u015f\u0131k 25 milyon TL olarak \u00f6ng\u00f6r\u00fclen \u00e7al\u0131\u015fma kapsam\u0131nda, ekonomik \u00f6mr\u00fcn\u00fc tamamlam\u0131\u015f ve d\u0131\u015f etkenlere a\u00e7\u0131k olan havai hat \u015febekesi ortadan kald\u0131r\u0131l\u0131yor. \u0130l\u00e7ede 2.500 metre yer alt\u0131 kaz\u0131s\u0131 ger\u00e7ekle\u015ftirilerek altyap\u0131 modern hatlarla yenileniyor. Proje dahilinde 3.500 metre yer alt\u0131 kablosu serilirken, \u00e7evre dostu ve tasarruflu 40 adet LED armat\u00fcr\u00fcn de tesisi sa\u011flan\u0131yor.<\/p>\n<h3><strong>\u0130ki Yeni Da\u011f\u0131t\u0131m Merkezi ile G\u00fc\u00e7l\u00fc Altyap\u0131<\/strong><\/h3>\n<p>\u00c7al\u0131\u015fmalar kapsam\u0131nda teknolojik \u00f6mr\u00fcn\u00fc dolduran 2 adet direk tipi trafonun s\u00f6k\u00fcm i\u015flemlerine ba\u015flan\u0131rken, yerlerine enerji y\u00f6netimini \u00e7ok daha g\u00fcvenli ve stabil hale getirecek 2 adet modern Da\u011f\u0131t\u0131m Merkezi kuruluyor. Karako\u00e7an\u2019\u0131n enerji \u015febekesine adeta can suyu olacak bu yeni merkezler, ar\u0131za kaynakl\u0131 kesintileri en aza indirirken, olas\u0131 ar\u0131zalara m\u00fcdahale s\u00fcrelerini de ciddi oranda k\u0131saltacak.<\/p>\n<h3><strong>\u00c7al\u0131\u015fmalar K\u0131sa S\u00fcrede Tamamlanacak<\/strong><\/h3>\n<p>Karako\u00e7an halk\u0131n\u0131n hak etti\u011fi kesintisiz ve kaliteli enerji konforunu sunmak i\u00e7in ba\u015flat\u0131lan \u00e7al\u0131\u015fmalar\u0131n k\u0131sa s\u00fcre i\u00e7erisinde tamamlanmas\u0131 planlan\u0131yor. Yat\u0131r\u0131m\u0131n koordineli bir \u015fekilde y\u00fcr\u00fct\u00fcld\u00fc\u011f\u00fcn\u00fc belirten yetkililer, proje bitti\u011finde Karako\u00e7an&#8217;\u0131n elektrik da\u011f\u0131t\u0131m altyap\u0131s\u0131n\u0131n \u00e7ok daha g\u00fc\u00e7l\u00fc, g\u00fcvenilir ve hava \u015fartlar\u0131ndan etkilenmeyen s\u00fcrd\u00fcr\u00fclebilir bir yap\u0131ya kavu\u015faca\u011f\u0131n\u0131n alt\u0131n\u0131 \u00e7iziyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. F\u0131rat EDA\u015e, Elaz\u0131\u011f\u2019\u0131n Karako\u00e7an il\u00e7esinde enerji arz\u0131n\u0131n s\u00fcreklili\u011fini ve hizmet kalitesini art\u0131rmak amac\u0131yla altyap\u0131 modernizasyon \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcr\u00fcyor. Birinci etap kapsam\u0131nda ger\u00e7ekle\u015ftirilen \u00e7al\u0131\u015fmalarla [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":203475,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[4249,118200,112268,52939,29896,56152,23713],"views":7,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/203473"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=203473"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/203473\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/203475"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=203473"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=203473"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=203473"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}