{"id":203289,"date":"2026-10-28T19:30:09","date_gmt":"2026-10-28T16:30:09","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=203289"},"modified":"2026-10-28T19:30:09","modified_gmt":"2026-10-28T16:30:09","slug":"ucay-muhendislikten-macaristanda-73-milyon-euroluk-ges-yatirimi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ucay-muhendislikten-macaristanda-73-milyon-euroluk-ges-yatirimi\/","title":{"rendered":"(Turkish) &#8217;\u00dc\u00e7ay M\u00fchendislik&#8217;ten Macaristan\u2019da 7,3 Milyon Euro\u2019luk GES Yat\u0131r\u0131m\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/203289\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>\u00dc\u00e7ay M\u00fchendislik, Macaristan\u2019da toplam 5.175 kWp kurulu g\u00fcce sahip 9 g\u00fcne\u015f enerjisi santralini b\u00fcnyesinde bar\u0131nd\u0131ran Bajai KFT\u2019nin tamam\u0131n\u0131 sat\u0131n almak \u00fczere ba\u011flay\u0131c\u0131 pay devir s\u00f6zle\u015fmesi imzalad\u0131.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-203292\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/10\/ucay-muhendislikten-macaristanda-73-milyon-euroluk-ges-yatirimi.jpg\" alt=\"\" width=\"500\" height=\"332\" data-wp-editing=\"1\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/10\/ucay-muhendislikten-macaristanda-73-milyon-euroluk-ges-yatirimi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/10\/ucay-muhendislikten-macaristanda-73-milyon-euroluk-ges-yatirimi-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/10\/ucay-muhendislikten-macaristanda-73-milyon-euroluk-ges-yatirimi-500x332.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/10\/ucay-muhendislikten-macaristanda-73-milyon-euroluk-ges-yatirimi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/10\/ucay-muhendislikten-macaristanda-73-milyon-euroluk-ges-yatirimi-450x300.jpg 450w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Y\u0131l\u0131n ilk ay\u0131nda halka arz s\u00fcrecini ba\u015far\u0131yla tamamlayan \u00dc\u00e7ay M\u00fchendislik, yenilenebilir enerji alan\u0131ndaki yat\u0131r\u0131mlar\u0131n\u0131 Avrupa pazar\u0131nda geni\u015fletmek \u00fczere \u00f6nemli bir ad\u0131m att\u0131. \u015eirketin y\u00fczde 100 i\u015ftiraki olan Macaristan merkezli \u00dc\u00e7ay Europe KFT, yine Macaristan\u2019da faaliyet g\u00f6steren Bajai KFT\u2019nin sermayesinin tamam\u0131n\u0131 temsil eden paylar\u0131 sat\u0131n almak amac\u0131yla Solar Repower KFT ile ba\u011flay\u0131c\u0131 pay devir s\u00f6zle\u015fmesi imzalad\u0131.<\/p>\n<p>7,3 milyon Euro bedelle ger\u00e7ekle\u015ftirilecek sat\u0131n alma kapsam\u0131nda Bajai KFT b\u00fcnyesinde toplam 107.781 metrekare arazi \u00fczerinde kurulu 9 g\u00fcne\u015f enerjisi santrali bulunuyor. Santrallerin toplam kurulu g\u00fcc\u00fc 4.491 kWe (AC) ve 5.175 kWp (DC) seviyesinde. Pay devrinin tamamlanmas\u0131 s\u00f6zle\u015fmede belirtilen \u015fartlar\u0131n yerine getirilmesine ve gerekli yasal izinlerin al\u0131nmas\u0131na ba\u011fl\u0131 olacak.<\/p>\n<h3><strong>Elektrik \u00fcretiminde 2067\u2019ye kadar lisans hakk\u0131<\/strong><\/h3>\n<p>Bajai KFT b\u00fcnyesindeki g\u00fcne\u015f enerjisi santrallerinin i\u015fletme haklar\u0131 lisans\u0131 2067 y\u0131l\u0131na kadar devam ediyor. Santrallerin 2040 y\u0131l\u0131na kadar \u00fcretece\u011fi elektri\u011fin ilgili yasal d\u00fczenlemeler kapsam\u0131ndaki al\u0131m garantisi \u00e7er\u00e7evesinde Macaristan devleti taraf\u0131ndan sat\u0131n al\u0131nmas\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor. 2040-2067 d\u00f6neminde \u00fcretilecek elektri\u011fin ise serbest piyasa ko\u015fullar\u0131nda sat\u0131lmas\u0131 planlan\u0131yor.<\/p>\n<p>S\u00f6z konusu yat\u0131r\u0131m\u0131n \u00dc\u00e7ay M\u00fchendislik\u2019in yenilenebilir enerji alan\u0131ndaki faaliyetlerini uluslararas\u0131 \u00f6l\u00e7ekte geli\u015ftirmesinin yan\u0131 s\u0131ra uzun vadeli gelir yap\u0131s\u0131n\u0131 desteklemesi bekleniyor.<\/p>\n<h3><strong>Sat\u0131n alma halka arz gelirleriyle finanse edilecek<\/strong><\/h3>\n<p>Sat\u0131n alman\u0131n finansman\u0131nda \u00dc\u00e7ay M\u00fchendislik\u2019in halka arz s\u00fcrecinde elde etti\u011fi fonlar\u0131n kullan\u0131lmas\u0131 planlan\u0131yor.<\/p>\n<h3><strong>Yat\u0131r\u0131m\u0131n 2027\u2019den itibaren gelir ve k\u00e2rl\u0131l\u0131\u011fa katk\u0131 sa\u011flamas\u0131 bekleniyor<\/strong><\/h3>\n<div id=\"attachment_203291\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img aria-describedby=\"caption-attachment-203291\" loading=\"lazy\" class=\"wp-image-203291\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/10\/turan-sakaci.jpg\" alt=\"\" width=\"500\" height=\"327\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/10\/turan-sakaci.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/10\/turan-sakaci-300x196.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/10\/turan-sakaci-500x327.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/10\/turan-sakaci-76x50.jpg 76w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><p id=\"caption-attachment-203291\" class=\"wp-caption-text\">\u00dc\u00e7ay M\u00fchendislik \u0130cra Kurulu Ba\u015fkan\u0131 ve CEO\u2019su Turan \u015eakac\u0131<\/p><\/div>\n<p>Konuya ili\u015fkin de\u011ferlendirmelerde bulunan <strong>\u00dc\u00e7ay M\u00fchendislik \u0130cra Kurulu Ba\u015fkan\u0131 ve CEO\u2019su Turan \u015eakac\u0131<\/strong>, \u015funlar\u0131 s\u00f6yledi:<\/p>\n<p><em>\u201cYenilenebilir enerji alan\u0131ndaki yat\u0131r\u0131mlar\u0131m\u0131z\u0131 uluslararas\u0131 pazarlara ta\u015f\u0131yarak uzun vadeli b\u00fcy\u00fcme hedeflerimizi desteklemeyi ama\u00e7l\u0131yoruz. Macaristan\u2019da toplam 5.175 kWp kurulu g\u00fcce sahip 9 g\u00fcne\u015f enerjisi santralini b\u00fcnyesinde bar\u0131nd\u0131ran Bajai KFT\u2019nin tamam\u0131n\u0131 devralmaya y\u00f6nelik imzalad\u0131\u011f\u0131m\u0131z s\u00f6zle\u015fme de bu hedef do\u011frultusunda att\u0131\u011f\u0131m\u0131z \u00f6nemli ad\u0131mlardan biri.<\/em><\/p>\n<p><em>Santrallerin uzun vadeli lisans yap\u0131s\u0131 ve elektrik sat\u0131\u015f\u0131na ili\u015fkin mevcut d\u00fczenlemeler, yat\u0131r\u0131m\u0131n s\u00fcrd\u00fcr\u00fclebilir gelir potansiyelini destekleyen unsurlar aras\u0131nda yer al\u0131yor. Halka arz gelirlerimizle finanse etmeyi planlad\u0131\u011f\u0131m\u0131z bu yat\u0131r\u0131m\u0131n 2027 ve sonraki d\u00f6nemlerde konsolide gelirlerimize ve operasyonel k\u00e2rl\u0131l\u0131\u011f\u0131m\u0131za katk\u0131 sa\u011flamas\u0131n\u0131 bekliyoruz. Avrupa pazar\u0131ndaki b\u00fcy\u00fcme hedeflerimiz do\u011frultusunda yenilenebilir enerji alan\u0131ndaki f\u0131rsatlar\u0131 de\u011ferlendirmeye devam edece\u011fiz.\u201d<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u00dc\u00e7ay M\u00fchendislik, Macaristan\u2019da toplam 5.175 kWp kurulu g\u00fcce sahip 9 g\u00fcne\u015f enerjisi santralini b\u00fcnyesinde bar\u0131nd\u0131ran Bajai KFT\u2019nin tamam\u0131n\u0131 sat\u0131n almak \u00fczere ba\u011flay\u0131c\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":203292,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[118098,118097,2326,2569,6666,82809],"views":7,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/203289"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=203289"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/203289\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/203292"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=203289"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=203289"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=203289"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}