{"id":20285,"date":"2014-01-03T10:00:01","date_gmt":"2014-01-03T07:00:01","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=20285"},"modified":"2014-01-03T10:00:01","modified_gmt":"2014-01-03T07:00:01","slug":"kirklareline-kadife-res-projesi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kirklareline-kadife-res-projesi\/","title":{"rendered":"(Turkish) K\u0131rklareli\u2019ne Kadife RES Projesi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/20285\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Kadife Yenilenebilir Enerji ve Elektrik \u00dcretim A.\u015e. taraf\u0131ndan K\u0131rklareli\u2019nde kurulmas\u0131 hedeflenen Kadife RES Projesi i\u00e7in \u00e7al\u0131\u015fmalara ba\u015flad\u0131. Kadife R\u00fczgar Enerjisi Santral\u0131 (RES) i\u00e7in \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) s\u00fcreci ge\u00e7ti\u011fimiz g\u00fcnlerde ba\u015flad\u0131.<\/strong><\/p>\n<p>K\u0131rklareli \u0130li, Kof\u00e7az \u0130l\u00e7esi, Ta\u015ftepe, Koca<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/ruzgar-enerjisi-RES-eczacibasi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-9063\" title=\"ruzgar-enerjisi-RES\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/ruzgar-enerjisi-RES-eczacibasi-300x195.jpg\" alt=\"\" width=\"300\" height=\"195\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/ruzgar-enerjisi-RES-eczacibasi-300x195.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/ruzgar-enerjisi-RES-eczacibasi-500x326.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/ruzgar-enerjisi-RES-eczacibasi-76x50.jpg 76w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/ruzgar-enerjisi-RES-eczacibasi.jpg 574w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>yaz\u0131 ve Elmac\u0131k K\u00f6yleri, Merkez \u0130l\u00e7esi, Kuzulu K\u00f6y\u00fc Mevkii\u2019nde kurulmas\u0131 hedeflenen RES her biri 2,6 MW Kurulu g\u00fcc\u00fcnde 19 t\u00fcrbinden olu\u015facak olup, b\u00f6ylece kurulu g\u00fcc\u00fc 49,4 MW olacak.<\/p>\n<p><strong>PROJEN\u0130N YATIRIM MAL\u0130YET\u0130 98,8 M\u0130LYON TL<\/strong><\/p>\n<p>Proje\u2019nin \u00c7ED Raporunda RES\u2019in yat\u0131r\u0131m maliyeti 98,8 milyon TL olarak \u00f6ng\u00f6r\u00fcld\u00fc.<\/p>\n<p>Kadife RES projesi 117.843.438,86 m2 (11.784,3 ha) alanda kurulacak olup proje i\u015fletmeye ge\u00e7ti\u011finde y\u0131lda 173,1 GWh enerji \u00fcretimi planlan\u0131yor.<br \/>\nProje i\u00e7in; haz\u0131rl\u0131k a\u015famas\u0131 22, in\u015faat d\u00f6nemi 30 ay olmak \u00fczere toplam yat\u0131r\u0131m s\u00fcresi 52 ay olarak planlanmakta olup, projenin in\u015faat a\u015famas\u0131nda 20 ki\u015fi ve i\u015fletme a\u015famas\u0131nda 7 ki\u015fi \u00e7al\u0131\u015facak.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/kirklareline-kadife-res-projesi_6388.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Kadife Yenilenebilir Enerji ve Elektrik \u00dcretim A.\u015e. taraf\u0131ndan K\u0131rklareli\u2019nde kurulmas\u0131 hedeflenen Kadife RES Projesi i\u00e7in \u00e7al\u0131\u015fmalara ba\u015flad\u0131. Kadife R\u00fczgar Enerjisi Santral\u0131 (RES) i\u00e7in [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9063,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[2878,4275,63,67,1009,165,11799,11800,11798,3955,474,324],"views":1389,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/20285"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=20285"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/20285\/revisions"}],"predecessor-version":[{"id":20287,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/20285\/revisions\/20287"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/9063"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=20285"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=20285"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=20285"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}