{"id":202588,"date":"2026-02-02T15:34:28","date_gmt":"2026-02-02T12:34:28","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=202588"},"modified":"2026-02-02T15:34:28","modified_gmt":"2026-02-02T12:34:28","slug":"sisecam-bulgaristan-uretim-tesisindeki-kaplamali-cam-hatti-yatirimini-tamamladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sisecam-bulgaristan-uretim-tesisindeki-kaplamali-cam-hatti-yatirimini-tamamladi\/","title":{"rendered":"(Turkish) &#8217;\u015ei\u015fecam&#8217; Bulgaristan \u00dcretim Tesisindeki Kaplamal\u0131 Cam Hatt\u0131 Yat\u0131r\u0131m\u0131n\u0131 Tamamlad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/202588\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>\u015ei\u015fecam, Bulgaristan d\u00fcz cam \u00fcretim tesisinde yer alan mevcut kaplamal\u0131 cam hatt\u0131na ek olarak y\u0131ll\u0131k 6 milyon metrekare kapasiteli yeni kaplamal\u0131 hat yat\u0131r\u0131m\u0131n\u0131 tamamlad\u0131. Toplam 20 milyon Euro\u2019luk yat\u0131r\u0131mla hayata ge\u00e7irilen yeni hat, Avrupa mimari cam pazar\u0131na y\u00f6nelik katma de\u011ferli \u00fcr\u00fcn kapasitesini g\u00fc\u00e7lendirirken, \u015firketin uluslararas\u0131 sat\u0131\u015flar\u0131n\u0131 art\u0131racak.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-202590\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/02\/sisecam-bulgaristan-uretim-tesisindeki-kaplamali-cam-hatti-yatirimini-tamamladi.jpg\" alt=\"\" width=\"500\" height=\"375\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/02\/sisecam-bulgaristan-uretim-tesisindeki-kaplamali-cam-hatti-yatirimini-tamamladi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/02\/sisecam-bulgaristan-uretim-tesisindeki-kaplamali-cam-hatti-yatirimini-tamamladi-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/02\/sisecam-bulgaristan-uretim-tesisindeki-kaplamali-cam-hatti-yatirimini-tamamladi-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/02\/sisecam-bulgaristan-uretim-tesisindeki-kaplamali-cam-hatti-yatirimini-tamamladi-67x50.jpg 67w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Cam ve kimyasallar sekt\u00f6rlerinin global oyuncusu \u015ei\u015fecam, Bulgaristan\u2019daki d\u00fcz cam tesisinde mevcut kaplamal\u0131 cam hatt\u0131na ek olarak ikinci bir kaplamal\u0131 cam hatt\u0131n\u0131 devreye ald\u0131. Toplam 20 milyon Euro\u2019luk yat\u0131r\u0131mla kurulan yeni hat, \u015ei\u015fecam\u2019\u0131n Avrupa mimari cam pazar\u0131na y\u00f6nelik katma de\u011ferli \u00fcr\u00fcn kapasitesini ve rekabet g\u00fcc\u00fcn\u00fc \u00f6nemli \u00f6l\u00e7\u00fcde art\u0131racak. Temperlenebilir, ileri performansl\u0131 ve enerji verimlili\u011fi odakl\u0131 \u00fcr\u00fcnlerin \u00fcretimine imk\u00e2n sa\u011flayacak olan hat, \u015ei\u015fecam\u2019a \u00fcr\u00fcn \u00e7e\u015fitlili\u011fi, operasyonel esneklik ve Ar-Ge \u00e7al\u0131\u015fmalar\u0131nda daha geni\u015f bir hareket alan\u0131 sunacak.<\/p>\n<p>Yeni hat yat\u0131r\u0131m\u0131 ile kazan\u0131lan ilave kapasite sayesinde \u015ei\u015fecam; y\u00fcksek \u0131\u015f\u0131k ge\u00e7irgenli\u011fi ile maksimum \u0131s\u0131 yal\u0131t\u0131m\u0131 sa\u011flayan y\u00fcksek teknolojili kaplamal\u0131 camlar, ku\u015f dostu cam ve otomotiv sekt\u00f6r\u00fcne y\u00f6nelik \u0131s\u0131t\u0131labilir atermik camlar gibi katma de\u011ferli \u00e7\u00f6z\u00fcmlerini Avrupa pazar\u0131na daha y\u00fcksek hacimlerle sunmay\u0131 hedefliyor. \u015eirket bu yat\u0131r\u0131mla s\u00fcrd\u00fcr\u00fclebilir ve y\u00fcksek performansl\u0131 cam talebine yan\u0131t verirken, uluslararas\u0131 sat\u0131\u015flar\u0131n\u0131n toplam sat\u0131\u015flar\u0131 i\u00e7indeki pay\u0131n\u0131 da g\u00fc\u00e7lendirmi\u015f olacak.<\/p>\n<p><strong>\u015ei\u015fecam Genel M\u00fcd\u00fcr\u00fc Can Y\u00fccel<\/strong> devreye al\u0131nan bu yat\u0131r\u0131ma dair \u015funlar\u0131 s\u00f6yledi:<em> \u201cBulgaristan\u2019daki d\u00fcz cam tesisimizde y\u0131ll\u0131k 6 milyon metrekare kapasiteli kaplamal\u0131 yeni cam hatt\u0131m\u0131z\u0131 devreye ald\u0131k. Rekabet avantaj\u0131m\u0131z\u0131 geli\u015fmi\u015f operasyonel verimlilik ve geni\u015fletilmi\u015f \u00fcr\u00fcn yelpazesiyle g\u00fc\u00e7lendirecek olan bu yat\u0131r\u0131m, portf\u00f6y\u00fcm\u00fcz i\u00e7inde katma de\u011ferli \u00fcr\u00fcnlerin oran\u0131n\u0131 art\u0131rarak m\u00fc\u015fterilerimize daha fazla de\u011fer sunmam\u0131z\u0131 sa\u011flayacak. \u015ei\u015fecam olarak stratejik \u00f6nceliklerimiz kapsam\u0131nda; verimlilik, maliyet disiplini, nakit yaratma kapasitesi ve bilan\u00e7o dayan\u0131kl\u0131l\u0131\u011f\u0131m\u0131z\u0131 g\u00fc\u00e7lendiren bir b\u00fcy\u00fcme yakla\u015f\u0131m\u0131n\u0131 benimsiyoruz. Daha \u00f6nce kamuoyu ile payla\u015ft\u0131\u011f\u0131m\u0131z \u00fczere kaplamal\u0131 cam alan\u0131nda devam eden iki yat\u0131r\u0131m\u0131m\u0131z daha bulunuyor. Tarsus d\u00fcz cam tesisimizde bu y\u0131l devreye alaca\u011f\u0131m\u0131z y\u0131ll\u0131k 7 milyon metrekare kapasiteli kaplamal\u0131 cam hatt\u0131 ve Kuzey \u0130talya\u2019daki tesisimizde devreye alma haz\u0131rl\u0131\u011f\u0131nda oldu\u011fumuz y\u0131ll\u0131k 6,5 milyon metrekare kapasiteli yeni hatt\u0131m\u0131z hayata ge\u00e7ti\u011finde, \u015ei\u015fecam\u2019\u0131n d\u00fcnya genelindeki kaplamal\u0131 cam hatlar\u0131n\u0131n say\u0131s\u0131 yediye ula\u015facak. Toplam kaplamal\u0131 cam kapasitemiz ise 48,1 milyon metrekareye \u00e7\u0131kacak. Bu \u00f6l\u00e7ek, artan kaplamal\u0131 cam talebine daha dengeli ve verimli bir \u00fcretim yap\u0131s\u0131yla yan\u0131t vermemizi sa\u011flarken, katma de\u011ferli \u00fcr\u00fcn portf\u00f6y\u00fcm\u00fcz\u00fc ve nakit yaratma kapasitemizi de destekleyecek. Yeni hatt\u0131m\u0131z ileri teknolojisi ve y\u00fcksek otomasyon seviyesi sayesinde operasyonel karl\u0131l\u0131\u011f\u0131m\u0131za katk\u0131 sa\u011flayacak.\u201d\u00a0<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u015ei\u015fecam, Bulgaristan d\u00fcz cam \u00fcretim tesisinde yer alan mevcut kaplamal\u0131 cam hatt\u0131na ek olarak y\u0131ll\u0131k 6 milyon metrekare kapasiteli yeni kaplamal\u0131 hat [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":202590,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,52],"tags":[117861,3323,117859,32733,117860],"views":15,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/202588"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=202588"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/202588\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/202590"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=202588"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=202588"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=202588"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}