{"id":202466,"date":"2026-01-26T14:02:30","date_gmt":"2026-01-26T11:02:30","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=202466"},"modified":"2026-01-26T14:02:30","modified_gmt":"2026-01-26T11:02:30","slug":"turkiye-elektrik-uretim-ve-tuketiminde-rekor-kirdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiye-elektrik-uretim-ve-tuketiminde-rekor-kirdi\/","title":{"rendered":"(Turkish) &#8217;T\u00fcrkiye&#8217; Elektrik \u00dcretim ve T\u00fcketiminde Rekor K\u0131rd\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/202466\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>T\u00fcrkiye\u2019nin elektrik kurulu g\u00fcc\u00fc, aral\u0131k ay\u0131 sonu itibariyle 122 bin 519 megavata y\u00fckseldi. 2025 y\u0131l\u0131nda toplam t\u00fcketim 360 bin 929 gigavatsaat ile t\u00fcm zamanlar\u0131n en y\u00fcksek seviyesine ula\u015f\u0131rken, y\u0131ll\u0131k bazda \u00fcretim de 362 bin 992 gigavatsaat ile rekor k\u0131rd\u0131. Enerji ve Tabii Kaynaklar Bakan\u0131 Alparslan Bayraktar, T\u00fcrkiye&#8217;nin g\u00fcne\u015f ve r\u00fczg\u00e2r kurulu g\u00fcc\u00fcn\u00fc 2035&#8217;te 120 bin megavata \u00e7\u0131karmay\u0131 hedeflediklerini an\u0131msatarak \u201cG\u00fcne\u015f ve r\u00fczg\u00e2r kurulu g\u00fcc\u00fcm\u00fcz\u00fcn toplam\u0131, 40 bin megavata yakla\u015ft\u0131. B\u00f6ylece, g\u00fcne\u015f ve r\u00fczg\u00e2rda 120 bin megavat kurulu g\u00fc\u00e7 hedefimizin \u00fc\u00e7te birini yakalad\u0131k\u201d dedi.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-202469\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/turkiye-elektrik-uretim-ve-tuketiminde-rekor-kirdi.jpg\" alt=\"\" width=\"500\" height=\"329\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/turkiye-elektrik-uretim-ve-tuketiminde-rekor-kirdi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/turkiye-elektrik-uretim-ve-tuketiminde-rekor-kirdi-300x197.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/turkiye-elektrik-uretim-ve-tuketiminde-rekor-kirdi-500x329.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/turkiye-elektrik-uretim-ve-tuketiminde-rekor-kirdi-76x50.jpg 76w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>T\u00fcrkiye\u2019nin elektrik kurulu g\u00fcc\u00fc, 2025\u2019in aral\u0131k ay\u0131nda da y\u00fckselmeyi s\u00fcrd\u00fcrd\u00fc. T\u00fcrkiye\u2019nin elektrik kurulu g\u00fcc\u00fc, aral\u0131k ay\u0131 sonu itibariyle 122 bin 519 megavata \u00e7\u0131kt\u0131.<\/p>\n<h3><strong>Yenilenebilir Enerjinin Pay\u0131 Y\u00fczde 62,3<\/strong><\/h3>\n<p>Yenilenebilir enerjinin kurulu g\u00fc\u00e7 i\u00e7indeki pay\u0131 da y\u00fckseli\u015fine devam etti. Toplam elektrik kurulu g\u00fcc\u00fcn\u00fcn, y\u00fczde 62,3\u2019\u00fcne kar\u015f\u0131l\u0131k gelen 76 bin 281 megavatl\u0131k k\u0131sm\u0131n\u0131 yenilenebilir enerji olu\u015fturdu.<\/p>\n<h3><strong>Rekor T\u00fcketim ve \u00dcretim<\/strong><\/h3>\n<p>2025 y\u0131l\u0131nda toplam elektrik t\u00fcketimi 360 bin 929 gigavatsaat ile t\u00fcm zamanlar\u0131n en y\u00fcksek seviyesine \u00e7\u0131karken, bu t\u00fcketime 362 bin 992 gigavatsaatlik rekor \u00fcretimle kar\u015f\u0131l\u0131k verildi.<\/p>\n<h3><strong>R\u00fczg\u00e2r ve G\u00fcne\u015fin Pay\u0131 Y\u00fczde 32,6<\/strong><\/h3>\n<p>Ge\u00e7en y\u0131l sonu itibariyle elektrik kurulu g\u00fcc\u00fcnde g\u00fcne\u015fin pay\u0131 25 bin 109 megavat ile y\u00fczde 20,5\u2019e, r\u00fczg\u00e2r\u0131n pay\u0131 da 14 bin 774 megavat ile y\u00fczde 12,1\u2019e eri\u015fti. G\u00fcne\u015f ve r\u00fczg\u00e2r kurulu g\u00fcc\u00fcn\u00fcn toplam\u0131 ise 2025\u2019te y\u00fczde 32,6 ile 39 bin 883 megavata \u00e7\u0131km\u0131\u015f oldu.<\/p>\n<h3><strong>120 Bin Megavat Hedefinin \u00dc\u00e7te Biri<\/strong><\/h3>\n<p>Enerji ve Tabii Kaynaklar Bakan\u0131 Alparslan Bayraktar, T\u00fcrkiye&#8217;nin g\u00fcne\u015f ve r\u00fczg\u00e2r kurulu g\u00fcc\u00fcn\u00fc 2035&#8217;te 120 bin megavata \u00e7\u0131karmay\u0131 hedeflediklerini an\u0131msatarak<em> \u201cG\u00fcne\u015f ve r\u00fczg\u00e2r kurulu g\u00fcc\u00fcm\u00fcz\u00fcn toplam\u0131, 40 bin megavata yakla\u015ft\u0131. B\u00f6ylece, g\u00fcne\u015f ve r\u00fczg\u00e2rda 120 bin megavat kurulu g\u00fc\u00e7 hedefimizin \u00fc\u00e7te birini yakalad\u0131k\u201d<\/em> dedi.<\/p>\n<h3><strong>G\u00fcne\u015f ve R\u00fczg\u00e2rdan \u00dcretim de Rekor K\u0131rd\u0131\u00a0<\/strong><\/h3>\n<p>2025 y\u0131l\u0131nda g\u00fcne\u015f kaynakl\u0131 elektrik \u00fcretim oran\u0131n\u0131n y\u00fczde 10,5, r\u00fczg\u00e2r\u0131n \u00fcretimdeki oran\u0131n\u0131n da y\u00fczde 10,7 ile t\u00fcm zamanlar\u0131n en y\u00fcksek y\u0131ll\u0131k seviyesine \u00e7\u0131kt\u0131\u011f\u0131n\u0131 kaydeden Bakan Bayraktar, <em>\u201cBuna g\u00f6re, 2025 y\u0131l\u0131nda toplam elektrik \u00fcretimimizin be\u015fte birinden fazlas\u0131n\u0131 r\u00fczg\u00e2r ve g\u00fcne\u015ften kar\u015f\u0131lad\u0131k\u201d <\/em>diye konu\u015ftu. Toplam \u00fcretimin y\u00fczde 56,7\u2019sinin yerli ve yenilenebilir kaynaklardan sa\u011fland\u0131\u011f\u0131n\u0131 da ifade eden Bakan Bayraktar<em>, \u201cT\u00fcrkiye\u2019nin enerjisini, T\u00fcrkiye\u2019nin \u00f6z kaynaklar\u0131yla y\u00fckseltmeye ve arz g\u00fcvenli\u011fimizi g\u00fc\u00e7lendirmeye devam edece\u011fiz.\u201d<\/em> dedi.<\/p>\n<h3><strong>2025 Y\u0131l\u0131 aral\u0131k ay\u0131 sonu itibariyle elektrik kurulu g\u00fcc\u00fcn\u00fcn kaynaklara g\u00f6re da\u011f\u0131l\u0131m\u0131 \u015f\u00f6yledir:<\/strong><\/h3>\n<figure class=\"table\">\n<table>\n<tbody>\n<tr>\n<td><strong>KAYNAK<\/strong><\/td>\n<td><strong>KURULU G\u00dc\u00c7 (MW)<\/strong><\/td>\n<td><strong>PAY (%)<\/strong><\/td>\n<\/tr>\n<tr>\n<td><strong>Hidroelektrik<\/strong><\/td>\n<td>32.294<\/td>\n<td>26,4<\/td>\n<\/tr>\n<tr>\n<td><strong>G\u00fcne\u015f<\/strong><\/td>\n<td>25.109<\/td>\n<td>20,5<\/td>\n<\/tr>\n<tr>\n<td><strong>Do\u011fal Gaz<\/strong><\/td>\n<td>24.232<\/td>\n<td>19,8<\/td>\n<\/tr>\n<tr>\n<td><strong>R\u00fczg\u00e2r<\/strong><\/td>\n<td>14.774<\/td>\n<td>12,1<\/td>\n<\/tr>\n<tr>\n<td><strong>Yerli K\u00f6m\u00fcr<\/strong><\/td>\n<td>11.550<\/td>\n<td>9,4<\/td>\n<\/tr>\n<tr>\n<td><strong>\u0130thal K\u00f6m\u00fcr<\/strong><\/td>\n<td>10.456<\/td>\n<td>8,5<\/td>\n<\/tr>\n<tr>\n<td><strong>Biyok\u00fctle \u00a0<\/strong><\/td>\n<td>2.346<\/td>\n<td>1,9<\/td>\n<\/tr>\n<tr>\n<td><strong>Jeotermal<\/strong><\/td>\n<td>1.758<\/td>\n<td>1,4<\/td>\n<\/tr>\n<tr>\n<td><strong>TOPLAM<\/strong><\/td>\n<td><strong>122.519<\/strong><\/td>\n<td><strong>%100<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/figure>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin elektrik kurulu g\u00fcc\u00fc, aral\u0131k ay\u0131 sonu itibariyle 122 bin 519 megavata y\u00fckseldi. 2025 y\u0131l\u0131nda toplam t\u00fcketim 360 bin 929 gigavatsaat ile [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":202469,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,50],"tags":[8304,19,18,2326,13,474,16,846],"views":18,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/202466"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=202466"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/202466\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/202469"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=202466"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=202466"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=202466"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}