{"id":202264,"date":"2026-01-08T13:43:28","date_gmt":"2026-01-08T10:43:28","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=202264"},"modified":"2026-01-08T13:43:28","modified_gmt":"2026-01-08T10:43:28","slug":"ronesans-yenilenebilir-enerji-gokcedag-resi-satin-aldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ronesans-yenilenebilir-enerji-gokcedag-resi-satin-aldi\/","title":{"rendered":"(Turkish) R\u00f6nesans Yenilenebilir Enerji &#8216;G\u00f6k\u00e7eda\u011f RES&#8217;i Sat\u0131n Ald\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/202264\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>R\u00f6nesans, yenilenebilir enerji alan\u0131ndaki b\u00fcy\u00fcme stratejisi do\u011frultusunda \u00f6nemli bir yat\u0131r\u0131m\u0131 daha portf\u00f6y\u00fcne katt\u0131. Zorlu Enerji taraf\u0131ndan i\u015fletilen G\u00f6k\u00e7eda\u011f R\u00fczg\u00e2r Enerji Santrali (RES),\u00a0<\/strong><strong>R\u00f6nesans Yenilenebilir Enerji\u00a0taraf\u0131ndan sat\u0131n al\u0131nd\u0131. S\u00f6z konusu i\u015flemle\u00a0<\/strong><strong>R\u00f6nesans\u2019\u0131n yenilenebilir enerjideki toplam kurulu g\u00fcc\u00fc 577 MW\u2019a ula\u015ft\u0131. R\u00f6nesans\u2019\u0131n, bu i\u015flemle iki y\u0131l \u00f6nce 166 MW olan kurulu g\u00fcc\u00fc yakla\u015f\u0131k 3,5 kat\u0131na \u00e7\u0131km\u0131\u015f oldu.<\/strong><\/h2>\n<div id=\"attachment_202267\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img aria-describedby=\"caption-attachment-202267\" loading=\"lazy\" class=\"wp-image-202267\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/ronesans-yenilenebilir-enerji-gokcedag-resi-satin-aldi.jpg\" alt=\"\" width=\"500\" height=\"365\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/ronesans-yenilenebilir-enerji-gokcedag-resi-satin-aldi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/ronesans-yenilenebilir-enerji-gokcedag-resi-satin-aldi-300x219.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/ronesans-yenilenebilir-enerji-gokcedag-resi-satin-aldi-500x365.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/ronesans-yenilenebilir-enerji-gokcedag-resi-satin-aldi-69x50.jpg 69w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><p id=\"caption-attachment-202267\" class=\"wp-caption-text\">Soldan sa\u011fa: Elif Yener &#8211; \u0130pek Il\u0131cak Kayaalp &#8211; Selen Zorlu Melik &#8211; Emre Hatem<\/p><\/div>\n<p>R\u00f6nesans, yenilenebilir enerji portf\u00f6y\u00fcn\u00fc g\u00fc\u00e7lendirmeye devam ediyor. T\u00fcrkiye\u2019nin temiz enerji d\u00f6n\u00fc\u015f\u00fcm\u00fcne katk\u0131 sunma, s\u00fcrd\u00fcr\u00fclebilir ve yerli enerji \u00fcretimini art\u0131rma hedefi do\u011frultusunda b\u00fcy\u00fcmesini kararl\u0131l\u0131kla s\u00fcrd\u00fcren R\u00f6nesans\u2019\u0131n grup \u015firketlerinden R\u00f6nesans Yenilenebilir Enerji, toplam 135 MW lisansl\u0131 ba\u011flant\u0131 kapasitesine sahip G\u00f6k\u00e7eda\u011f RES\u2019i sat\u0131n ald\u0131. 2,5 MW kapasiteli r\u00fczgar t\u00fcrbinlerinden olu\u015fan G\u00f6k\u00e7eda\u011f RES, g\u00fc\u00e7l\u00fc r\u00fczg\u00e2r potansiyeli sayesinde y\u00fcksek ve s\u00fcrd\u00fcr\u00fclebilir enerji \u00fcretimi imk\u00e2n\u0131 sunan stratejik bir yenilenebilir enerji yat\u0131r\u0131m\u0131 olarak \u00f6ne \u00e7\u0131k\u0131yor.<\/p>\n<h3><strong>HEDEF\u0130M\u0130ZE B\u0130R ADIM DAHA YAKLA\u015eTIK<\/strong><\/h3>\n<p><strong>R\u00f6nesans Holding Y\u00f6netim Kurulu Ba\u015fkan\u0131 \u0130pek Il\u0131cak Kayaalp<\/strong>; <em>\u201cG\u00f6k\u00e7eda\u011f R\u00fczg\u00e2r Enerji Santrali\u2019nin sat\u0131n al\u0131nmas\u0131yla birlikte, tamam\u0131 ye\u015fil enerjiden olu\u015fan kurulu g\u00fcc\u00fcm\u00fcz 577 MW\u2019a ula\u015f\u0131rken, yenilenebilir enerji proje portf\u00f6y\u00fcm\u00fcz 1.400 MW seviyesine y\u00fckseldi. Son iki y\u0131l i\u00e7inde yenilenebilir enerji kapasitemizi yakla\u015f\u0131k 3,5 kat\u0131na \u00e7\u0131kard\u0131k. \u0130n\u015fa halinde olan ve geli\u015ftirmekte oldu\u011fumuz 8 yeni yat\u0131r\u0131m\u0131m\u0131z bulunuyor. 2028 y\u0131l\u0131na kadar ye\u015fil enerji alan\u0131nda 2 GW\u2019l\u0131k yat\u0131r\u0131m ger\u00e7ekle\u015ftirmeyi ve T\u00fcrkiye\u2019nin en b\u00fcy\u00fck \u00fc\u00e7 ye\u015fil enerji oyuncusundan biri olmay\u0131 hedefliyoruz. T\u00fcrkiye\u2019nin enerji d\u00f6n\u00fc\u015f\u00fcm\u00fcne katk\u0131 sa\u011flamaktan ve daha temiz, daha dayan\u0131kl\u0131 bir gelecek in\u015fa etmekten gurur duyuyoruz\u201d<\/em> dedi.<\/p>\n<h3><strong>\u0130LK G\u00dcNDEN \u0130T\u0130BAREN GEL\u0130R \u00dcRETEN STRATEJ\u0130K VARLIK<\/strong><\/h3>\n<p>Devral\u0131nd\u0131\u011f\u0131 ilk g\u00fcnden itibaren gelir \u00fcreten bir varl\u0131k niteli\u011fi ta\u015f\u0131yarak R\u00f6nesans\u2019a operasyonel ve finansal katk\u0131 sa\u011flayacak G\u00f6k\u00e7eda\u011f RES, mevcut altyap\u0131n\u0131n etkin kullan\u0131m\u0131 sayesinde, ilave \u015febeke yat\u0131r\u0131m\u0131 gerektirmeden kapasite art\u0131\u015f\u0131 ve yeni proje geli\u015ftirme potansiyeli ta\u015f\u0131yor.<\/p>\n<p>Santralin t\u00fcm bak\u0131m ve i\u015fletme faaliyetlerini b\u00fcnyesine alarak operasyonel verimlili\u011fi art\u0131rmay\u0131 hedefleyen R\u00f6nesans, t\u00fcrbin yenileme (repowering) ve kapasite art\u0131\u015f\u0131 yat\u0131r\u0131mlar\u0131yla mevcut altyap\u0131y\u0131 en verimli \u015fekilde de\u011ferlendirmeyi ama\u00e7l\u0131yor. Bu kapsamda, t\u00fcrbinlerin bir k\u0131sm\u0131n\u0131n daha b\u00fcy\u00fck ve verimli yeni nesil t\u00fcrbinlerle de\u011fi\u015ftirilmesiyle T\u00fcrkiye\u2019deki ilk ve en b\u00fcy\u00fck t\u00fcrbin yenileme (repowering) projelerinden birinin hayata ge\u00e7irilmesi hedefleniyor.<\/p>\n<p>Lisans kapsam\u0131nda izin verilen kapasite art\u0131\u015f\u0131, mekanik g\u00fc\u00e7 y\u00fckseltimi uygulamalar\u0131 sayesinde santralin kurulu g\u00fcc\u00fcn\u00fcn art\u0131r\u0131lmas\u0131; buna paralel olarak y\u0131ll\u0131k enerji \u00fcretiminin de \u00f6nemli \u00f6l\u00e7\u00fcde y\u00fckseltilmesi planlan\u0131yor.<\/p>\n<h3><strong>UZUN VADEL\u0130, G\u00dc\u00c7L\u00dc YATIRIM PROF\u0130L\u0130<\/strong><\/h3>\n<p>G\u00f6k\u00e7eda\u011f RES, uzun vadeli lisans s\u00fcresi ve istikrarl\u0131 \u00fcretim yap\u0131s\u0131yla g\u00fc\u00e7l\u00fc bir yat\u0131r\u0131m profili sunuyor. Proje, ge\u00e7mi\u015fte uluslararas\u0131 finans kurulu\u015flar\u0131n\u0131n deste\u011fiyle hayata ge\u00e7irilmi\u015f olmas\u0131yla da T\u00fcrkiye yenilenebilir enerji sekt\u00f6r\u00fcnde \u00f6nemli bir kilometre ta\u015f\u0131 olarak konumlan\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. R\u00f6nesans, yenilenebilir enerji alan\u0131ndaki b\u00fcy\u00fcme stratejisi do\u011frultusunda \u00f6nemli bir yat\u0131r\u0131m\u0131 daha portf\u00f6y\u00fcne katt\u0131. Zorlu Enerji taraf\u0131ndan i\u015fletilen G\u00f6k\u00e7eda\u011f R\u00fczg\u00e2r Enerji Santrali (RES),\u00a0R\u00f6nesans [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":202267,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[117754,87826,117753,231,312,1339,344],"views":21,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/202264"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=202264"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/202264\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/202267"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=202264"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=202264"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=202264"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}