{"id":202213,"date":"2026-01-06T19:32:03","date_gmt":"2026-01-06T16:32:03","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=202213"},"modified":"2026-01-06T19:41:55","modified_gmt":"2026-01-06T16:41:55","slug":"yeka-ges-2025-yarismalarinin-sozlesmeleri-imzalandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yeka-ges-2025-yarismalarinin-sozlesmeleri-imzalandi\/","title":{"rendered":"(Turkish) YEKA GES-2025 Yar\u0131\u015fmalar\u0131n\u0131n S\u00f6zle\u015fmeleri \u0130mzaland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/202213\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan d\u00fczenlenen YEKA GES-2025 yar\u0131\u015fmalar\u0131 kapsam\u0131nda, 8 ayr\u0131 alanda toplam 650 megavat kapasite tahsis edilen projeler i\u00e7in s\u00f6zle\u015fmeler imzaland\u0131. Yar\u0131\u015fmalar sonucunda yakla\u015f\u0131k 102 milyon Euro\u2019luk katk\u0131 pay\u0131 sa\u011fland\u0131.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-202216\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/yeka-ges-2025-yarismalarinin-sozlesmeleri-imzalandi.jpg\" alt=\"\" width=\"500\" height=\"329\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/yeka-ges-2025-yarismalarinin-sozlesmeleri-imzalandi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/yeka-ges-2025-yarismalarinin-sozlesmeleri-imzalandi-300x197.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/yeka-ges-2025-yarismalarinin-sozlesmeleri-imzalandi-500x329.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/yeka-ges-2025-yarismalarinin-sozlesmeleri-imzalandi-76x50.jpg 76w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>25 Kas\u0131m 2025\u2019te ger\u00e7ekle\u015ftirilen YEKA GES-2025 yar\u0131\u015fmalar\u0131n\u0131n s\u00f6zle\u015fmeleri, Enerji ve Tabii Kaynaklar Bakan Yard\u0131mc\u0131s\u0131 Zafer Demircan\u2019\u0131n kat\u0131l\u0131m\u0131yla, Enerji \u0130\u015fleri Genel M\u00fcd\u00fcr\u00fc Ahmet \u00d6zkaya ve yar\u0131\u015fmay\u0131 kazanan firmalar\u0131n yetkilileri taraf\u0131ndan bug\u00fcn Bakanl\u0131kta imzaland\u0131.<\/p>\n<h3><strong>60 Ayl\u0131k S\u00fcre\u00e7 Ba\u015flad\u0131<\/strong><\/h3>\n<p>Yar\u0131\u015fmay\u0131 kazanan \u015firketler, s\u00f6zle\u015fme imza tarihinden itibaren \u00fcrettikleri elektri\u011fi 60 ay s\u00fcre ile serbest piyasada satabilecek. Daha sonra 20 y\u0131l s\u00fcreyle \u00fcretilen elektrik, kilovatsaat ba\u015f\u0131na 3,25 euro\/cent fiyat ile iletim sistemine verilecek.\u00a0S\u00f6zle\u015fmelerin imzalanmas\u0131yla birlikte, firmalar i\u00e7in 60 ayl\u0131k serbest piyasada sat\u0131\u015f s\u00fcreci resmen ba\u015flam\u0131\u015f oldu.<\/p>\n<h3><strong>Bakan Yard\u0131mc\u0131s\u0131 Demircan: Devam Edece\u011fiz<\/strong><\/h3>\n<p>\u0130mza t\u00f6reninde konu\u015fan <strong>Bakan Yard\u0131mc\u0131s\u0131 Zafer Demircan<\/strong>, <em>\u201cG\u00f6sterdi\u011finiz ihtimam ve rekabet, bizi hem devam\u0131n\u0131 getirme a\u00e7\u0131s\u0131ndan umutland\u0131r\u0131yor hem de sekt\u00f6r\u00fcn bize olan g\u00fcvenini g\u00f6sterme a\u00e7\u0131s\u0131ndan kendimizi iyi hissediyoruz. Bakanl\u0131k olarak YEKA&#8217;lar\u0131 her y\u0131l en az 2 bin megavat olarak planlamaya devam ediyoruz. Bundan sonra da bu \u015fekilde devam edece\u011fiz.\u201d<\/em> dedi. Demircan, YEKA GES-2025 kapsam\u0131nda ilk y\u00fczer GES kapasitesinin de yat\u0131r\u0131mc\u0131yla bulu\u015ftu\u011funu an\u0131msatt\u0131. YEKA\u2019lar\u0131n enerji sekt\u00f6r\u00fc i\u00e7in \u00f6nemli bir i\u015f potansiyeli oldu\u011funu ifade eden Demircan, yat\u0131r\u0131mlar\u0131n hay\u0131rl\u0131 ve u\u011furlu olmas\u0131 temennisinde de bulundu.<\/p>\n<h3><strong>102 Milyon Euro Katk\u0131 Bedeli<\/strong><\/h3>\n<p>Bolu, Erzurum, Eski\u015fehir, Kahramanmara\u015f, Mardin, Van ve Manisa\u2019da bulunan toplam 650 MW kapasiteli 8 adet ba\u011flant\u0131 kapasitesi, yap\u0131lan yar\u0131\u015fmalar\u0131n ard\u0131ndan yat\u0131r\u0131mc\u0131lara tahsis edilmi\u015fti. S\u00f6z konusu yar\u0131\u015fmalar\u0131n neticesinde de toplamda yakla\u015f\u0131k 102 milyon Euro\u2019luk bir katk\u0131 bedeli sa\u011fland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan d\u00fczenlenen YEKA GES-2025 yar\u0131\u015fmalar\u0131 kapsam\u0131nda, 8 ayr\u0131 alanda toplam 650 megavat kapasite tahsis edilen projeler i\u00e7in [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":202216,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[1972,1635,2326,2569,2206,4269,116013],"views":15,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/202213"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=202213"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/202213\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/202216"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=202213"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=202213"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=202213"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}