{"id":202188,"date":"2026-01-04T20:00:04","date_gmt":"2026-01-04T17:00:04","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=202188"},"modified":"2026-01-04T20:00:55","modified_gmt":"2026-01-04T17:00:55","slug":"akfen-yenilenebilir-enerjinin-kocalar-res-projesindeki-kapasite-artisi-tamamlandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akfen-yenilenebilir-enerjinin-kocalar-res-projesindeki-kapasite-artisi-tamamlandi\/","title":{"rendered":"(Turkish) &#8217;Akfen Yenilenebilir Enerji&#8217;nin Kocalar RES&#8217;inin Kapasite Art\u0131\u015f\u0131 Tamamland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/202188\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Akfen Yenilenebilir Enerji A.\u015e.,<\/strong>\u00a0\u00c7anakkale\u2019de yer alan\u00a0<strong>Kocalar R\u00fczg\u00e2r Enerjisi Santrali (RES)<\/strong>\u00a0kapasite art\u0131\u015f projesi kapsam\u0131nda, projenin kalan\u00a0<strong>11,8 MW\u2019l\u0131k<\/strong>\u00a0b\u00f6l\u00fcm\u00fcn\u00fc de ticari \u00fcretime ald\u0131.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-202191\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/akfen-yenilenebilir-enerji-nin-kocalar-res-projesindeki-kapasite-artisi-tamamlandi-sirketin-kurulu-gucu-887-mw-a-ulasti_2471829.jpg\" alt=\"\" width=\"500\" height=\"324\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/akfen-yenilenebilir-enerji-nin-kocalar-res-projesindeki-kapasite-artisi-tamamlandi-sirketin-kurulu-gucu-887-mw-a-ulasti_2471829.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/akfen-yenilenebilir-enerji-nin-kocalar-res-projesindeki-kapasite-artisi-tamamlandi-sirketin-kurulu-gucu-887-mw-a-ulasti_2471829-300x194.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/akfen-yenilenebilir-enerji-nin-kocalar-res-projesindeki-kapasite-artisi-tamamlandi-sirketin-kurulu-gucu-887-mw-a-ulasti_2471829-500x324.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/akfen-yenilenebilir-enerji-nin-kocalar-res-projesindeki-kapasite-artisi-tamamlandi-sirketin-kurulu-gucu-887-mw-a-ulasti_2471829-77x50.jpg 77w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>\u015eirketin %100 ba\u011fl\u0131 ortakl\u0131\u011f\u0131\u00a0<strong>Is\u0131der Enerji \u00dcretim Pazarlama \u0130thalat ve \u0130hracat A.\u015e.<\/strong>\u00a0taraf\u0131ndan y\u00fcr\u00fct\u00fclen Kocalar RES kapasite art\u0131\u015f projesinin ilk b\u00f6l\u00fcmleri daha \u00f6nce 7 Kas\u0131m ve 5 Aral\u0131k 2025 tarihlerinde devreye al\u0131nm\u0131\u015ft\u0131. 26 Aral\u0131k 2025 itibar\u0131yla tamamlanan son a\u015famayla birlikte,\u00a0<strong>santralin toplam 29,5 MW\u2019l\u0131k kurulu g\u00fcc\u00fcn\u00fcn tamam\u0131 ticari \u00fcretime<\/strong>\u00a0ge\u00e7mi\u015f oldu.<\/p>\n<p>Bu geli\u015fmeyle birlikte Akfen Yenilenebilir Enerji, yat\u0131r\u0131m program\u0131 kapsam\u0131nda yer alan birinci a\u015fama r\u00fczg\u00e2r enerjisi kapasite art\u0131\u015f projelerinin kalan b\u00f6l\u00fcm\u00fcn\u00fc de tamamlad\u0131. B\u00f6ylece \u015firket, toplam\u00a0<strong>102,2 MW\u2019l\u0131k RES kapasite art\u0131\u015f yat\u0131r\u0131mlar\u0131n\u0131<\/strong>\u00a0ba\u015far\u0131yla hayata ge\u00e7irdi.<\/p>\n<p>Ger\u00e7ekle\u015ftirilen yat\u0131r\u0131mlar sonucunda Akfen Yenilenebilir Enerji, i\u015fletmekte oldu\u011fu\u00a0<strong>yenilenebilir enerji santrallerinde toplam 887 MW kurulu g\u00fc\u00e7 kapasitesine ula\u015ft\u0131<\/strong>. \u015eirket, bu b\u00fcy\u00fckl\u00fckle birlikte tamamen yenilenebilir kaynaklara dayal\u0131 \u00fcretim portf\u00f6y\u00fcn\u00fc planlanan takvim do\u011frultusunda geni\u015fletmi\u015f oldu.<\/p>\n<h3><strong>\u201cPLANLADI\u011eIMIZ YATIRIMLARIMIZI <\/strong><strong>EKS\u0130KS\u0130K \u015eEK\u0130LDE TAMAMLADIK\u201d<\/strong><\/h3>\n<div id=\"attachment_202190\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img aria-describedby=\"caption-attachment-202190\" loading=\"lazy\" class=\"wp-image-202190\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/mustafa-kemal-gungor.jpg\" alt=\"\" width=\"500\" height=\"320\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/mustafa-kemal-gungor.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/mustafa-kemal-gungor-300x192.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/mustafa-kemal-gungor-500x320.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2026\/01\/mustafa-kemal-gungor-78x50.jpg 78w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><p id=\"caption-attachment-202190\" class=\"wp-caption-text\">Akfen Yenilenebilir Enerji Genel M\u00fcd\u00fcr\u00fc Mustafa Kemal G\u00fcng\u00f6r<\/p><\/div>\n<p><strong>Akfen Yenilenebilir Enerji Genel M\u00fcd\u00fcr\u00fc Mustafa Kemal G\u00fcng\u00f6r<\/strong>, 2025 y\u0131l\u0131n\u0131 de\u011ferlendirirken \u015fu a\u00e7\u0131klamada bulundu: \u201c<em>2025 y\u0131l\u0131, Akfen Yenilenebilir Enerji a\u00e7\u0131s\u0131ndan planlanan yat\u0131r\u0131mlar\u0131n eksiksiz \u015fekilde tamamland\u0131\u011f\u0131, operasyonel g\u00fcc\u00fcm\u00fcz\u00fcn ve \u00fcretim kapasitemizin \u00f6nemli \u00f6l\u00e7\u00fcde artt\u0131\u011f\u0131 bir y\u0131l oldu. \u015eirketimizin birinci a\u015fama yat\u0131r\u0131m program\u0131 kapsam\u0131nda yer alan 102,2 MW\u2019l\u0131k RES kapasite art\u0131\u015f projelerini ve 85,3 MW\u2019l\u0131k hibrit GES yat\u0131r\u0131mlar\u0131n\u0131 planlanan takvim do\u011frultusunda ba\u015far\u0131yla tamamlad\u0131k. Eyl\u00fcl ay\u0131 itibar\u0131yla devreye al\u0131nan hibrit GES projelerimizle birlikte, r\u00fczg\u00e2r, g\u00fcne\u015f ve hidroelektrik kaynaklara dayal\u0131 dengeli \u00fcretim portf\u00f6y\u00fcm\u00fcz daha da g\u00fc\u00e7lendi. Bu yat\u0131r\u0131mlarla T\u00fcrkiye\u2019nin enerji d\u00f6n\u00fc\u015f\u00fcm\u00fcne somut katk\u0131lar sa\u011flarken, \u00f6n\u00fcm\u00fczdeki d\u00f6nemde de yat\u0131r\u0131m disiplinimizi koruyarak, yeni kapasite art\u0131\u015flar\u0131 ve teknoloji odakl\u0131 projelerle b\u00fcy\u00fcmemizi s\u00fcrd\u00fcrmeyi hedefliyoruz.\u201d<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Akfen Yenilenebilir Enerji A.\u015e.,\u00a0\u00c7anakkale\u2019de yer alan\u00a0Kocalar R\u00fczg\u00e2r Enerjisi Santrali (RES)\u00a0kapasite art\u0131\u015f projesi kapsam\u0131nda, projenin kalan\u00a011,8 MW\u2019l\u0131k\u00a0b\u00f6l\u00fcm\u00fcn\u00fc de ticari \u00fcretime ald\u0131. \u015eirketin %100 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":202191,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[28245,4427,10764,47850,117719],"views":27,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/202188"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=202188"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/202188\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/202191"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=202188"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=202188"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=202188"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}