{"id":201995,"date":"2025-12-17T13:52:25","date_gmt":"2025-12-17T10:52:25","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=201995"},"modified":"2025-12-17T13:52:25","modified_gmt":"2025-12-17T10:52:25","slug":"borusan-enbw-enerji-toplam-kurulu-gucunu-935-mwa-cikardi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/borusan-enbw-enerji-toplam-kurulu-gucunu-935-mwa-cikardi\/","title":{"rendered":"(Turkish) &#8217;Borusan EnBW Enerji&#8217; Toplam Kurulu G\u00fcc\u00fcn\u00fc 935 MW\u2019a \u00c7\u0131kard\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/201995\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Borusan EnBW Enerji\u2019nin\u00a0<\/strong><strong>\u0130\u00e7 Anadolu\u2019daki ilk r\u00fczg\u00e2r yat\u0131r\u0131m\u0131 Pelit RES, Sivas\u2019ta 80 MW g\u00fcc\u00fcyle \u00fcretime ba\u015flad\u0131. Borusan EnBW Enerji\u2019nin be\u015finci b\u00fcy\u00fck tesisi olan Pelit RES, her y\u0131l 178 bin ton karbondioksit sal\u0131m\u0131n\u0131 \u00f6nleyecek.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-201997\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/12\/borusan-enbw-enerji-toplam-kurulu-gucunu-935-mwa-cikardi.jpg\" alt=\"\" width=\"500\" height=\"335\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/12\/borusan-enbw-enerji-toplam-kurulu-gucunu-935-mwa-cikardi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/12\/borusan-enbw-enerji-toplam-kurulu-gucunu-935-mwa-cikardi-300x201.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/12\/borusan-enbw-enerji-toplam-kurulu-gucunu-935-mwa-cikardi-500x335.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/12\/borusan-enbw-enerji-toplam-kurulu-gucunu-935-mwa-cikardi-75x50.jpg 75w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Borusan Grubu ve Energie Baden-W\u00fcrttemberg AG\u2019nin (EnBW) ortak giri\u015fimi Borusan EnBW Enerji, \u0130\u00e7 Anadolu B\u00f6lgesi\u2019ndeki ilk projesi olan Pelit R\u00fczg\u00e2r Enerji Santrali\u2019ni (RES) Sivas\u2019ta tam kapasite devreye ald\u0131. Toplam 80 MW kurulu g\u00fcce sahip Pelit RES, Borusan EnBW Enerji portf\u00f6y\u00fcn\u00fcn be\u015finci b\u00fcy\u00fck tesisi oldu. Bu devreye al\u0131mla birlikte Borusan EnBW Enerji\u2019nin r\u00fczg\u00e2r santrali say\u0131s\u0131 10\u2019a, toplam t\u00fcrbin say\u0131s\u0131 ise 212\u2019ye ve toplam kurulu g\u00fcc\u00fc 935 MW\u2019a ula\u015ft\u0131.<\/p>\n<div id=\"attachment_201998\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img aria-describedby=\"caption-attachment-201998\" loading=\"lazy\" class=\"wp-image-201998\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/12\/borusan-enbw-enerji-toplam-kurulu-gucunu-935-mwa-cikardi-1.jpg\" alt=\"\" width=\"500\" height=\"395\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/12\/borusan-enbw-enerji-toplam-kurulu-gucunu-935-mwa-cikardi-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/12\/borusan-enbw-enerji-toplam-kurulu-gucunu-935-mwa-cikardi-1-300x237.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/12\/borusan-enbw-enerji-toplam-kurulu-gucunu-935-mwa-cikardi-1-500x395.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/12\/borusan-enbw-enerji-toplam-kurulu-gucunu-935-mwa-cikardi-1-63x50.jpg 63w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><p id=\"caption-attachment-201998\" class=\"wp-caption-text\">Borusan EnBW Enerji Genel M\u00fcd\u00fcr\u00fc Enis Amasyal\u0131<\/p><\/div>\n<p><strong>Borusan EnBW Enerji Genel M\u00fcd\u00fcr\u00fc Enis Amasyal\u0131<\/strong>, projeyle ilgili \u015fu bilgileri payla\u015ft\u0131: <em>\u201cPelit RES ile \u00fcretim haritam\u0131za \u0130\u00e7 Anadolu b\u00f6lgemizi de ekledik. B\u00f6lgenin r\u00fczg\u00e2r rejimi, y\u0131l geneline yay\u0131lan performans\u0131m\u0131z\u0131 daha dengeli hale getirirken operasyonel planlamada bize \u00f6nemli bir esneklik sa\u011fl\u0131yor. Tamam\u0131 yenilenebilir enerji tesislerinden olu\u015fan portf\u00f6y\u00fcm\u00fczdeki 80 MW\u2019l\u0131k bu yat\u0131r\u0131m\u0131m\u0131z\u0131n devreye al\u0131nmas\u0131yla; yerli ve yenilenebilir enerjinin pay\u0131n\u0131 y\u00fckselterek \u00fclkemizin enerji ba\u011f\u0131ms\u0131zl\u0131\u011f\u0131na, arz g\u00fcvenli\u011fine ve 2053 Net S\u0131f\u0131r hedeflerine katk\u0131 sunuyoruz. Pelit RES, bu yakla\u015f\u0131m\u0131n g\u00fc\u00e7l\u00fc bir \u00f6rne\u011fi olarak s\u00fcrd\u00fcr\u00fclebilir ve g\u00fcvenilir enerji \u00fcretimini destekliyor.\u201d<\/em><\/p>\n<p>Pelit RES, konumu itibar\u0131yla Borusan EnBW Enerji\u2019nin \u00fcretim portf\u00f6y\u00fcnde mevsimsel ve b\u00f6lgesel \u00e7e\u015fitlilik yarat\u0131yor. Bu sayede y\u0131l boyunca \u00fcretim dengesini g\u00fc\u00e7lendiriyor ve \u015febeke arz g\u00fcvenli\u011fine istikrarl\u0131 katk\u0131 sa\u011fl\u0131yor.<\/p>\n<p>Pelit RES y\u0131ll\u0131k yakla\u015f\u0131k 178.000 ton karbondioksit sal\u0131m\u0131n\u0131n \u00f6n\u00fcne ge\u00e7ecek. Bu, 4,6 milyon a\u011fac\u0131n karbon yakalama kapasitesine denk geliyor. Pelit RES\u2019in y\u0131ll\u0131k elektrik \u00fcretimi ise yakla\u015f\u0131k 122.000 hanenin enerji ihtiyac\u0131n\u0131 kar\u015f\u0131layacak d\u00fczeyde.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Borusan EnBW Enerji\u2019nin\u00a0\u0130\u00e7 Anadolu\u2019daki ilk r\u00fczg\u00e2r yat\u0131r\u0131m\u0131 Pelit RES, Sivas\u2019ta 80 MW g\u00fcc\u00fcyle \u00fcretime ba\u015flad\u0131. Borusan EnBW Enerji\u2019nin be\u015finci b\u00fcy\u00fck tesisi olan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":201997,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[14225,36009,117651,474,231,5484],"views":24,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/201995"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=201995"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/201995\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/201997"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=201995"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=201995"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=201995"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}