{"id":201933,"date":"2025-11-25T14:18:46","date_gmt":"2025-11-25T11:18:46","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=201933"},"modified":"2025-11-25T14:19:24","modified_gmt":"2025-11-25T11:19:24","slug":"yeka-ges-2025-basvurulari-alindi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yeka-ges-2025-basvurulari-alindi\/","title":{"rendered":"(Turkish) YEKA GES-2025 Ba\u015fvurular\u0131 Al\u0131nd\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/201933\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131, g\u00fcne\u015f enerjisi santralleri (GES) i\u00e7in Yenilenebilir Enerji Kaynak Alan\u0131 (YEKA) yar\u0131\u015fma ba\u015fvurular\u0131n\u0131 ald\u0131. Toplam 650 MWe kapasiteli 8 YEKA GES yar\u0131\u015fmas\u0131na yat\u0131r\u0131mc\u0131lar yo\u011fun ilgi g\u00f6sterdi. YEKA GES-2025\u2019e 38 \u015firketten toplamda 77 ba\u015fvuru geldi. T\u00fcrkiye\u2019nin ilk y\u00fczer g\u00fcne\u015f enerjisi santrali Demirk\u00f6pr\u00fc Y\u00fczer GES\u2019e 11 ba\u015fvuru yap\u0131ld\u0131.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-201935\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/11\/yeka-ges-2025-basvurulari-alindi.jpg\" alt=\"\" width=\"500\" height=\"329\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/11\/yeka-ges-2025-basvurulari-alindi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/11\/yeka-ges-2025-basvurulari-alindi-300x197.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/11\/yeka-ges-2025-basvurulari-alindi-500x329.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/11\/yeka-ges-2025-basvurulari-alindi-76x50.jpg 76w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Enerji ve Tabii Kaynaklar Bakan\u0131 Alparslan Bayraktar,<em> \u201cY\u0131l bitmeden YEKA 2025 yar\u0131\u015fmalar\u0131n\u0131 ger\u00e7ekle\u015ftirece\u011fiz. Aralar\u0131nda uluslararas\u0131 yat\u0131r\u0131mc\u0131lar\u0131n da oldu\u011fu rekabet d\u00fczeyi y\u00fcksek yar\u0131\u015fmalar olmas\u0131n\u0131 bekliyoruz. Yar\u0131\u015fmalara girecek \u015firketlere \u015fimdiden ba\u015far\u0131lar diliyorum.\u201d<\/em> dedi.<\/p>\n<h3><strong>Ba\u015fvurular Tamam<\/strong><\/h3>\n<p>T\u00fcrkiye\u2019nin yenilenebilir enerji hedeflerinin ger\u00e7ekle\u015ftirilebilmesi amac\u0131yla devreye al\u0131nan YEKA modelinde GES\u2019ler i\u00e7in y\u00fcr\u00fct\u00fclen ba\u015fvuru s\u00fcreci tamamland\u0131. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131\u2019na 7 \u015fehirdeki 8 YEKA GES yar\u0131\u015fmas\u0131 i\u00e7in 38 \u015firket taraf\u0131ndan 77 ayr\u0131 ba\u015fvuru geldi.<\/p>\n<h3><strong>650 MWe\u2019lik Kapasite<\/strong><\/h3>\n<p>YEKA GES-2025 kapsam\u0131nda; Bolu, Erzurum, Eski\u015fehir, Kahramanmara\u015f, Mardin, Van ve Manisa\u2019da bulunan toplam 650 MWe g\u00fcc\u00fcndeki ba\u011flant\u0131 kapasitesi, yap\u0131lacak yar\u0131\u015fma sonucunda yat\u0131r\u0131mc\u0131lara tahsis edilecek. YEKA GES-2025 yar\u0131\u015fmalar\u0131n\u0131n, detayl\u0131 evrak incelemesinin ard\u0131ndan \u00f6n\u00fcm\u00fczdeki hafta yap\u0131lmas\u0131 planlan\u0131yor.<\/p>\n<h3><strong>Tavan ve Taban Fiyatlar\u0131<\/strong><\/h3>\n<p>YEKA GES-2025\u2019te toplam 8 yar\u0131\u015fma i\u00e7in ba\u015flang\u0131\u00e7 tavan fiyat\u0131, 5,50, taban fiyat 3,25 Euro-cent\/kWh olarak belirlendi. T\u00fcm yar\u0131\u015fmalarda taban fiyata ula\u015f\u0131lmas\u0131 halinde MW ba\u015f\u0131na katk\u0131 pay\u0131 art\u0131rma ba\u015flang\u0131\u00e7 fiyat\u0131 ise 10 bin Euro olacak.<\/p>\n<h3><strong>Serbest Piyasada Sat\u0131\u015f<\/strong><\/h3>\n<p>GES\u2019lerde \u00fcretilen elektrik, s\u00f6zle\u015fme imza tarihinden itibaren 60 ay boyunca serbest piyasada sat\u0131labilecek. Serbest piyasada sat\u0131\u015f s\u00fcresi bittikten sonra 20 y\u0131ll\u0131k elektrik enerjisi al\u0131m s\u00fcresi ba\u015flayacak.<\/p>\n<h3><strong>\u0130lk Y\u00fczer GES<\/strong><\/h3>\n<p>T\u00fcrkiye\u2019nin ilk y\u00fczer GES\u2019i unvan\u0131n\u0131 kazanan Demirk\u00f6pr\u00fc Y\u00fczer GES\u2019e 11 ba\u015fvuru geldi. Ge\u00e7en y\u0131l K\u0131y\u0131 Kanunu\u2019nda yap\u0131lan de\u011fi\u015fiklikle denizler, baraj g\u00f6lleri, suni g\u00f6ller ve tabii g\u00f6llerde yenilenebilir enerji \u00fcretim santralleri kurulabilmesinin \u00f6n\u00fc a\u00e7\u0131lm\u0131\u015ft\u0131. YEKA GES-2025 kapsam\u0131nda Manisa\u2019da bulunan Demirk\u00f6pr\u00fc HES rezervuar alan\u0131nda y\u00fczer GES kurulumu amac\u0131yla 35 MWe b\u00fcy\u00fckl\u00fc\u011f\u00fcnde kapasite tahsis edilecek.<\/p>\n<h3><strong>Hedef 120 Bin Megavat<\/strong><\/h3>\n<p>Enerji ve Tabii Kaynaklar Bakan\u0131 Alparslan Bayraktar, g\u00fcne\u015f ve r\u00fczg\u00e2r kurulu g\u00fcc\u00fcnde 38 bin megavat\u0131 ge\u00e7tiklerini, 2035 y\u0131l\u0131nda 120 bin megavata ula\u015fmay\u0131 hedeflediklerini belirterek \u201cHedefimize emin ad\u0131mlarla ilerlemek ad\u0131na bu y\u0131l\u0131n ba\u015f\u0131nda yeni YEKA modelini hayata ge\u00e7irdik. G\u00fcne\u015f ve r\u00fczg\u00e2rda ilk yar\u0131\u015fmalar\u0131 bu y\u0131l\u0131n ba\u015f\u0131nda yapt\u0131k. Y\u0131l bitmeden YEKA 2025 yar\u0131\u015fmalar\u0131n\u0131 da ger\u00e7ekle\u015ftirece\u011fiz. Aralar\u0131nda uluslararas\u0131 yat\u0131r\u0131mc\u0131lar\u0131n da oldu\u011fu rekabet d\u00fczeyi y\u00fcksek yar\u0131\u015fmalar olmas\u0131n\u0131 bekliyoruz. Yar\u0131\u015fmalara girecek \u015firketlere \u015fimdiden ba\u015far\u0131lar diliyorum.\u201d dedi.<\/p>\n<h3><strong>R\u00fczg\u00e2r Ba\u015fvurular\u0131 2 Aral\u0131k\u2019ta<\/strong><\/h3>\n<p>Di\u011fer yandan, r\u00fczg\u00e2r enerjisi santrallerine ili\u015fkin YEKA RES-2025 Yar\u0131\u015fmalar\u0131nda ba\u015fvurular 2 Aral\u0131k saat 10:00 ila 12:00 aras\u0131nda al\u0131nacak.<\/p>\n<p>YEKA GES-2025 kapsam\u0131nda yap\u0131lacak yar\u0131\u015fmalar, ba\u011flant\u0131 kapasiteleri ve al\u0131nan ba\u015fvuru say\u0131lar\u0131 \u015f\u00f6yle:<\/p>\n<figure class=\"table\">\n<table>\n<tbody>\n<tr>\n<td><strong>Yar\u0131\u015fma Ad\u0131<\/strong><\/td>\n<td><strong>Ba\u011flant\u0131 Kapasitesi (MWe)<\/strong><\/td>\n<td><strong>Ba\u015fvuru Say\u0131s\u0131<\/strong><\/td>\n<\/tr>\n<tr>\n<td>G25-Bolu GES<\/td>\n<td>50<\/td>\n<td>6<\/td>\n<\/tr>\n<tr>\n<td>G25-Erzurum-1 GES<\/td>\n<td>100<\/td>\n<td>9<\/td>\n<\/tr>\n<tr>\n<td>G25-Erzurum-3 GES<\/td>\n<td>85<\/td>\n<td>5<\/td>\n<\/tr>\n<tr>\n<td>G25-Eski\u015fehir GES<\/td>\n<td>260<\/td>\n<td>4<\/td>\n<\/tr>\n<tr>\n<td>G25-Kahramanmara\u015f GES<\/td>\n<td>40<\/td>\n<td>19<\/td>\n<\/tr>\n<tr>\n<td>G25-Mardin GES<\/td>\n<td>40<\/td>\n<td>15<\/td>\n<\/tr>\n<tr>\n<td>G25-Van GES<\/td>\n<td>40<\/td>\n<td>8<\/td>\n<\/tr>\n<tr>\n<td>YG25-Demirk\u00f6pr\u00fc Y\u00fczer GES<\/td>\n<td>35<\/td>\n<td>11<\/td>\n<\/tr>\n<tr>\n<td>Toplam<\/td>\n<td>650<\/td>\n<td>77<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/figure>\n<p>Kaynak: <a href=\"https:\/\/enerji.gov.tr\/haber-detay?id=31641\" target=\"_blank\" rel=\"noopener\">ETKB<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131, g\u00fcne\u015f enerjisi santralleri (GES) i\u00e7in Yenilenebilir Enerji Kaynak Alan\u0131 (YEKA) yar\u0131\u015fma ba\u015fvurular\u0131n\u0131 ald\u0131. Toplam 650 MWe kapasiteli [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":201935,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[2326,1325,25578,117544,32138],"views":18,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/201933"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=201933"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/201933\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/201935"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=201933"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=201933"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=201933"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}