{"id":20193,"date":"2013-12-31T15:47:33","date_gmt":"2013-12-31T12:47:33","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=20193"},"modified":"2013-12-31T15:47:33","modified_gmt":"2013-12-31T12:47:33","slug":"cenal-enerjiye-yeniden-ced-karari","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cenal-enerjiye-yeniden-ced-karari\/","title":{"rendered":"(Turkish) Cenal Enerji\u2019ye Yeniden \u00c7ED Karar\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/20193\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Cengiz Enerji ve Alsim-Alarko firmalar\u0131n\u0131n kurdu\u011fu Cenal Enerji A.\u015e. firmas\u0131n\u0131n \u00c7anakkale\u2019nin Karabiga il\u00e7esinde in\u015fa edece\u011fi ithal k\u00f6m\u00fcr santrali i\u00e7in yeniden \u00c7ED raporu verildi. \u00c7evresel Etki De\u011ferlendirmesi, \u0130zin ve Denetleme Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc, Proje i\u00e7in yeniden yap\u0131lan \u00c7ED Raporuna ili\u015fkin incelemelerini tamamlayarak, Proje i\u00e7in yeniden \u00c7ED <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/cenal-enerjiye-yeniden-ced-karari.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-20194\" title=\"cenal-enerjiye-yeniden-ced-karari\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/cenal-enerjiye-yeniden-ced-karari-300x195.jpg\" alt=\"\" width=\"300\" height=\"195\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/cenal-enerjiye-yeniden-ced-karari-300x195.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/cenal-enerjiye-yeniden-ced-karari-500x325.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/cenal-enerjiye-yeniden-ced-karari-76x50.jpg 76w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/cenal-enerjiye-yeniden-ced-karari.jpg 540w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>olumlu karar\u0131 ald\u0131.<\/strong><\/p>\n<p>10 Aral\u0131k 2013 tarihi itibar\u0131yla projeye yeniden \u00c7ED karar\u0131 verilmi\u015f oldu.<\/p>\n<p><strong>DAHA \u00d6NCEK\u0130 \u00c7ED KARARI DURDURULMU\u015eTU<\/strong><\/p>\n<p>Alarko taraf\u0131ndan daha \u00f6nce Kamuyu Ayd\u0131nlatma Platformu\u2019nda (KAP) yap\u0131lan a\u00e7\u0131klama ile \u00c7anakkale \u0130dare Mahkemesi taraf\u0131ndan santral\u0131n \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) olumlu karar\u0131n\u0131n durduruldu\u011fu duyurulmu\u015ftu.<\/p>\n<p><strong>PROJE\u2019N\u0130N YATIRIM MAL\u0130YET\u0130 1,7 M\u0130LYAR TL<\/strong><\/p>\n<p>Proje\u2019nin haz\u0131rlanan revize \u00c7ED ba\u015fvurusuna g\u00f6re, Projenin yakla\u015f\u0131k yat\u0131r\u0131m maliyeti 1.710.200.000 TL olarak belirlendi. Kad\u0131o\u011flu Mahallesinde, 471.025 m2lik alanda 5229, 5230 nolu parsellerinde, 1.320 MWe (2&#215;660 MWe) \/ 1.380 MWm \/ 2.926MWt kurulu g\u00fcc\u00fcnde kurulmas\u0131 hedeflenen Santral yan\u0131nda Liman, K\u00fcl Depolama Sahas\u0131 ve Derin Deniz De\u015farj\u0131 yap\u0131larak i\u015fletilmesi planlan\u0131yor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/cenal-enerjiye-yeniden-ced-karari_6342.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Cengiz Enerji ve Alsim-Alarko firmalar\u0131n\u0131n kurdu\u011fu Cenal Enerji A.\u015e. firmas\u0131n\u0131n \u00c7anakkale\u2019nin Karabiga il\u00e7esinde in\u015fa edece\u011fi ithal k\u00f6m\u00fcr santrali i\u00e7in yeniden \u00c7ED raporu verildi. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":20194,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[11758,4427,2878,5465,11757,2890,8055,63,67,1009,165,9018,11759,11760],"views":1066,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/20193"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=20193"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/20193\/revisions"}],"predecessor-version":[{"id":20196,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/20193\/revisions\/20196"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/20194"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=20193"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=20193"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=20193"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}