{"id":201836,"date":"2025-11-14T00:19:23","date_gmt":"2025-11-13T21:19:23","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=201836"},"modified":"2025-11-14T00:19:23","modified_gmt":"2025-11-13T21:19:23","slug":"kirikkalede-enerji-altyapisini-guclendirme-calismalari-suruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kirikkalede-enerji-altyapisini-guclendirme-calismalari-suruyor\/","title":{"rendered":"(Turkish) K\u0131r\u0131kkale\u2019de Enerji Altyap\u0131s\u0131n\u0131 G\u00fc\u00e7lendirme \u00c7al\u0131\u015fmalar\u0131 S\u00fcr\u00fcyor&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/201836\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Sekt\u00f6re \u00f6nc\u00fc teknolojileri ve insan odakl\u0131 \u00e7al\u0131\u015fma anlay\u0131\u015f\u0131yla hareket eden Ba\u015fkent EDA\u015e, 2025 y\u0131l\u0131n\u0131n ilk dokuz ay\u0131nda savunma ve petro-kimya ba\u015fta olmak \u00fczere b\u00f6lgenin \u00f6nemli bir sanayi \u015fehri olan ve 300 bine yak\u0131n n\u00fcfusa sahip K\u0131r\u0131kkale\u2019de\u00a093 milyon\u00a0TL yat\u0131r\u0131m\u0131 hayata ge\u00e7irdi. \u015eirket, kentin kesintisiz enerji ihtiyac\u0131 i\u00e7in bak\u0131m ve onar\u0131m faaliyetlerine de h\u0131z verdi.<\/strong><\/h2>\n<p><strong> <img loading=\"lazy\" class=\"aligncenter wp-image-201837 size-full\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/11\/1763027174_BASKENT2.jpg\" alt=\"\" width=\"550\" height=\"424\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/11\/1763027174_BASKENT2.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/11\/1763027174_BASKENT2-300x231.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/11\/1763027174_BASKENT2-500x385.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/11\/1763027174_BASKENT2-65x50.jpg 65w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/11\/1763027174_BASKENT2-260x200.jpg 260w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/strong><\/p>\n<p>\u2018Herkes i\u00e7in daha iyi bir gelecek\u2019 vizyonuyla s\u00fcrd\u00fcr\u00fclebilir projelerini hayata ge\u00e7iren Enerjisa Da\u011f\u0131t\u0131m \u015eirketleri\u2019nden Ba\u015fkent EDA\u015e, K\u0131r\u0131kkale\u2019de 185 binden fazla aboneye kesintisiz ve kaliteli enerji hizmeti vermek i\u00e7in \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcr\u00fcyor.<\/p>\n<p>2024 y\u0131l\u0131nda en \u00e7ok yat\u0131r\u0131m yapan 4 elektrik da\u011f\u0131t\u0131m \u015firketinden biri olan Ba\u015fkent EDA\u015e, K\u0131r\u0131kkale\u2019de hizmet verdi\u011fi bin 889 trafo ve 8 bin 554 kilometrelik enerji hatt\u0131nda s\u00fcrd\u00fcr\u00fclebilir ve kesintisiz enerji sa\u011flamak i\u00e7in bak\u0131m, yenileme ve yat\u0131r\u0131m \u00e7al\u0131\u015fmalar\u0131na devam etti. Ayr\u0131ca, dijital d\u00f6n\u00fc\u015f\u00fcm \u00e7al\u0131\u015fmalar\u0131 ve karbon ayak izini azaltmak i\u00e7in att\u0131\u011f\u0131 ad\u0131mlar\u0131n\u0131 da s\u00fcrd\u00fcrd\u00fc.<\/p>\n<h3><strong>K\u0131r\u0131kkale\u2019de kesintisiz enerji i\u00e7in altyap\u0131 g\u00fc\u00e7leniyor<\/strong><\/h3>\n<p>Daha ayd\u0131nl\u0131k bir kent hedefi do\u011frultusunda, mevsimsel ve co\u011frafi \u015fartlar\u0131n olumsuz etkilerini en aza indirmek i\u00e7in 2025 y\u0131l\u0131n\u0131n ilk 9 ay\u0131nda da \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcren \u015firket,\u00a0Merkez, Bah\u015fili, Bal\u0131\u015feyh, \u00c7elebi, Karake\u00e7ili, Yah\u015fihan Delice, Keskin ve Sulakyurt\u00a0il\u00e7elerinde ge\u00e7en y\u0131l\u0131n ayn\u0131 d\u00f6nemine g\u00f6re %36\u2019l\u0131k art\u0131\u015fla bin 2.688 ayd\u0131nlatma armat\u00fcr\u00fcn\u00fcn bak\u0131m\u0131n\u0131 tamamlad\u0131. Ba\u015fkent EDA\u015e a 361 kilometrelik enerji nakil hatt\u0131, 52 elektrik da\u011f\u0131t\u0131m panosu ve 22 trafo merkezinin bak\u0131m i\u015flemi yap\u0131larak s\u00fcrd\u00fcr\u00fclebilir enerji da\u011f\u0131t\u0131m\u0131na katk\u0131 sa\u011flad\u0131. Yeni yat\u0131r\u0131mlar kapsam\u0131nda ise 26 kilometrelik kablo d\u00f6\u015femesi, 158 yeni ayd\u0131nlatma armat\u00fcr\u00fc, 5 elektrik da\u011f\u0131t\u0131m panosu ile 1 trafo montaj\u0131 yap\u0131larak enerji altyap\u0131s\u0131 g\u00fc\u00e7lendirildi.<\/p>\n<p>Ba\u015fkent EDA\u015e, K\u0131r\u0131kkale\u2019de k\u0131\u015f aylar\u0131nda ya\u015fanabilecek olumsuz hava ko\u015fullar\u0131na kar\u015f\u0131 enerji arz\u0131n\u0131n s\u00fcreklili\u011fini sa\u011flamak amac\u0131yla haz\u0131rl\u0131klar\u0131n\u0131 s\u00fcrd\u00fcr\u00fcyor. \u015eirket, y\u0131l boyunca ger\u00e7ekle\u015ftirdi\u011fi bak\u0131m, onar\u0131m ve yenileme \u00e7al\u0131\u015fmalar\u0131yla \u00f6zellikle k\u0131rsal b\u00f6lgelerde altyap\u0131 dayan\u0131kl\u0131l\u0131\u011f\u0131n\u0131 art\u0131r\u0131rken, olas\u0131 ar\u0131zalara kar\u015f\u0131 \u00f6nleyici bak\u0131m programlar\u0131n\u0131 devreye ald\u0131.<\/p>\n<h3><strong>Zorlu K\u0131\u015f \u015eartlar\u0131 \u0130\u00e7in Haz\u0131rl\u0131klara Devam Edildi<\/strong><\/h3>\n<p>Ba\u015fkent EDA\u015e, K\u0131r\u0131kkale\u2019de k\u0131\u015f aylar\u0131nda ya\u015fanabilecek olumsuz hava ko\u015fullar\u0131na kar\u015f\u0131 enerji arz\u0131n\u0131n s\u00fcreklili\u011fini sa\u011flamak amac\u0131yla kapsaml\u0131 haz\u0131rl\u0131klar\u0131n\u0131 s\u00fcrd\u00fcr\u00fcyor. \u015eirket, y\u0131l boyunca ger\u00e7ekle\u015ftirdi\u011fi bak\u0131m, onar\u0131m ve yenileme \u00e7al\u0131\u015fmalar\u0131yla \u00f6zellikle y\u00fcksek kesimlerde altyap\u0131 dayan\u0131kl\u0131l\u0131\u011f\u0131n\u0131 art\u0131r\u0131rken, olas\u0131 ar\u0131zalara kar\u015f\u0131 \u00f6nleyici bak\u0131m programlar\u0131n\u0131 y\u0131l boyunca hayata ge\u00e7irdi.<\/p>\n<p>Kritik \u00f6neme sahip direk, iletken ve topraklama sistemlerinde yap\u0131lan kontrollerin yan\u0131 s\u0131ra, alternatif enerji hatlar\u0131 ve yer alt\u0131 kablo tesisleriyle kesinti risklerinin en aza indirilmesi hedefleniyor. Ekipler, yakla\u015fan k\u0131\u015f \u015fartlar\u0131nda ortaya \u00e7\u0131kabilecek yo\u011fun kar ya\u011f\u0131\u015f\u0131 ve f\u0131rt\u0131na gibi zorlu hava ko\u015fullar\u0131nda da kesintisiz hizmet verebilmek i\u00e7in 7\/24 esas\u0131na g\u00f6re haz\u0131r \u015fekilde g\u00f6rev yap\u0131yor.<\/p>\n<p>Ba\u015fkent EDA\u015e, k\u0131\u015f mevsimi boyunca g\u00fcvenli ve s\u00fcrd\u00fcr\u00fclebilir enerji arz\u0131n\u0131 korumak i\u00e7in K\u0131r\u0131kkale\u2019de bulunan t\u00fcm il\u00e7elerde operasyonel haz\u0131rl\u0131klar\u0131n\u0131 devam ederek, m\u00fc\u015fterilerine kaliteli hizmet sunma kararl\u0131l\u0131\u011f\u0131n\u0131 s\u00fcrd\u00fcr\u00fcyor.<\/p>\n<p>Yay\u0131na Alan: Alperen ERTA\u015e-<a href=\"http:\/\/alperen.ertas@enerjigazetesi.ist\">alperen.ertas@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Sekt\u00f6re \u00f6nc\u00fc teknolojileri ve insan odakl\u0131 \u00e7al\u0131\u015fma anlay\u0131\u015f\u0131yla hareket eden Ba\u015fkent EDA\u015e, 2025 y\u0131l\u0131n\u0131n ilk dokuz ay\u0131nda savunma ve petro-kimya ba\u015fta olmak [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":201837,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[4420,61,1009,4474,846],"views":16,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/201836"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=201836"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/201836\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/201837"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=201836"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=201836"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=201836"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}