{"id":20157,"date":"2013-12-31T10:13:18","date_gmt":"2013-12-31T07:13:18","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=20157"},"modified":"2013-12-31T10:13:18","modified_gmt":"2013-12-31T07:13:18","slug":"tekirdaga-494-mwlik-kaktus-res-projesi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tekirdaga-494-mwlik-kaktus-res-projesi\/","title":{"rendered":"(Turkish) Tekirda\u011f\u2019a 49,4 MW\u2019l\u0131k Kakt\u00fcs RES Projesi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/20157\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Kakt\u00fcs Yenilenebilir Enerji ve Elektrik \u00dcretim Anonim \u015eirketi Tekirda\u011f\u2019a 49,4 MW\u2019l\u0131k Kakt\u00fcs R\u00fczgar Enerjisi Santrali\u2019nin (RES) kurulmas\u0131na ili\u015fkin \u00e7al\u0131\u015fmalar ba\u015flad\u0131. Proje i\u00e7in \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) s\u00fcrecinin ba\u015flat\u0131lm\u0131\u015f oldu\u011fu ve t<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/tekirdaga-494-mwlik-kaktus-res-projesi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-20158\" title=\"tekirdaga-494-mwlik-kaktus-res-projesi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/tekirdaga-494-mwlik-kaktus-res-projesi-300x216.jpg\" alt=\"\" width=\"300\" height=\"216\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/tekirdaga-494-mwlik-kaktus-res-projesi-300x216.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/tekirdaga-494-mwlik-kaktus-res-projesi-69x50.jpg 69w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/tekirdaga-494-mwlik-kaktus-res-projesi.jpg 406w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>oplant\u0131lar\u0131n yap\u0131laca\u011f\u0131 belirlendi.<\/strong><\/p>\n<p><strong>PROJE\u2019N\u0130N YATIRIM MAL\u0130YET\u0130 98,8 M\u0130LYON TL<\/strong><\/p>\n<p>Proje i\u00e7in haz\u0131rlanan \u00c7ED raporu\u2019na g\u00f6re, Proje\u2019nin yat\u0131r\u0131m maliyeti 98,8 milyon TL olacak.<\/p>\n<p>Tekirda\u011f \u0130li, \u00c7erkezk\u00f6y \u0130l\u00e7esi, Kapakl\u0131, Yan\u0131ka\u011f\u0131l, B\u00fcy\u00fckyoncal\u0131 K\u00f6y\u00fc Mevkii\u2019nde yap\u0131lacak Kakt\u00fcs RES, her biri 2,6 MW kurulu g\u00fcc\u00fcnde 19 t\u00fcrbin kurulacak.<\/p>\n<p>Kakt\u00fcs RES projesi i\u015fletmeye al\u0131nd\u0131\u011f\u0131nda y\u0131lda 173,1 GWh enerji \u00fcretmesi planlan\u0131yor. Proje i\u00e7in; haz\u0131rl\u0131k a\u015famas\u0131 22, in\u015faat d\u00f6nemi 30 ay olmak \u00fczere toplam yat\u0131r\u0131m s\u00fcresi 52 ay olarak planlanmakta olup, projenin in\u015faat a\u015famas\u0131nda 20 ki\u015fi ve i\u015fletme a\u015famas\u0131nda 7 ki\u015fi \u00e7al\u0131\u015facak.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/tekirdaga-494-mwlik-kaktus-res-projesi_6341.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Kakt\u00fcs Yenilenebilir Enerji ve Elektrik \u00dcretim Anonim \u015eirketi Tekirda\u011f\u2019a 49,4 MW\u2019l\u0131k Kakt\u00fcs R\u00fczgar Enerjisi Santrali\u2019nin (RES) kurulmas\u0131na ili\u015fkin \u00e7al\u0131\u015fmalar ba\u015flad\u0131. Proje i\u00e7in \u00c7evresel [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":20158,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[2878,4275,63,67,1009,165,18,11735,11734,474,10595,231,4513],"views":1110,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/20157"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=20157"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/20157\/revisions"}],"predecessor-version":[{"id":20160,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/20157\/revisions\/20160"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/20158"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=20157"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=20157"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=20157"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}