{"id":201506,"date":"2025-11-01T21:38:51","date_gmt":"2025-11-01T18:38:51","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=201506"},"modified":"2025-11-01T21:38:51","modified_gmt":"2025-11-01T18:38:51","slug":"buyuk-olcekli-jeotermal-enerji-uretiminde-yeni-bir-donem","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/buyuk-olcekli-jeotermal-enerji-uretiminde-yeni-bir-donem\/","title":{"rendered":"(Turkish) B\u00fcy\u00fck \u00d6l\u00e7ekli Jeotermal Enerji \u00dcretiminde Yeni Bir D\u00f6nem"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/201506\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Exergy&#8217;nin Radial D\u0131\u015f \u00c7\u0131k\u0131\u015fl\u0131 T\u00fcrbin (ROT) teknolojisinde yeni bir kilometre ta\u015f\u0131, tek bir \u015faftta 60 MWe&#8217;ye kadar g\u00fc\u00e7 \u00fcretimi sa\u011fl\u0131yor.<\/strong><\/h2>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-201507\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/11\/image-300x277.jpg\" alt=\"\" width=\"550\" height=\"508\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/11\/image-300x277.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/11\/image-433x400.jpg 433w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/11\/image-54x50.jpg 54w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/11\/image-500x462.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/11\/image.jpg 520w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p>Geli\u015fmi\u015f jeotermal binary enerji santralleri alan\u0131nda k\u00fcresel lider olan Exergy International, bug\u00fcn kendi geli\u015ftirdi\u011fi Radial D\u0131\u015f \u00c7\u0131k\u0131\u015fl\u0131 T\u00fcrbin (ROT) teknolojisinde yeni bir kilometre ta\u015f\u0131n\u0131 tan\u0131tt\u0131: Gemini T\u00fcrbini.<\/p>\n<p>Bu yenilik\u00e7i yap\u0131land\u0131rma, iki t\u00fcrbinin g\u00fcc\u00fcn\u00fc tek bir y\u00fcksek kapasiteli \u00fcnitede birle\u015ftirerek 60 MWe&#8217;ye kadar g\u00fc\u00e7 \u00fcretimi sa\u011fl\u0131yor. Tamamen Exergy&#8217;nin \u0130talya&#8217;daki T\u00fcrbin ekibi taraf\u0131ndan tasarlan\u0131p geli\u015ftirilen Gemini, b\u00fcy\u00fck \u00f6l\u00e7ekli jeotermal enerji \u00fcretiminde verimlilik, \u00f6l\u00e7eklenebilirlik ve rekabet\u00e7ilik a\u00e7\u0131s\u0131ndan yeni bir standart belirliyor ve bu da onu yeni nesil Geli\u015fmi\u015f ve Geli\u015fmi\u015f Jeotermal Sistemler (EGS ve AGS) i\u00e7in ideal bir \u00e7\u00f6z\u00fcm haline getiriyor.<\/p>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-201508\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/11\/RENDER2-288x300.jpg\" alt=\"\" width=\"550\" height=\"573\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/11\/RENDER2-288x300.jpg 288w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/11\/RENDER2-384x400.jpg 384w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/11\/RENDER2-48x50.jpg 48w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/11\/RENDER2.jpg 461w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<h3><strong>Maksimum Performans \u0130\u00e7in Yeni Bir Mimari<\/strong><\/h3>\n<p>Gemini&#8217;nin yenili\u011finin merkezinde, Exergy&#8217;nin patentli ROT mimarisinin evrimi yer al\u0131yor. T\u00fcrbin, \u00e7al\u0131\u015fma ak\u0131\u015fkan\u0131n\u0131n her iki taraftan simetrik olarak girmesini ve merkezi bir rotor diski arac\u0131l\u0131\u011f\u0131yla radyal olarak geni\u015flemesini sa\u011flayan \u00e7ift giri\u015fli bir tasar\u0131ma sahip. Radyal geni\u015flemenin ard\u0131ndan ak\u0131\u015fkan, egzoz flan\u015f\u0131na do\u011fru y\u00f6nelerek tahliye edilir.<\/p>\n<p>Bu yeni yap\u0131land\u0131rmada, stator kanatlar\u0131 yan stator disklerine monte edilirken, rotor, geleneksel asma kurulum yerine yataklar aras\u0131 bir d\u00fczenle destekleniyor. Bu yap\u0131sal geli\u015fme, t\u00fcrbinin mekanik stabilitesini \u00f6nemli \u00f6l\u00e7\u00fcde art\u0131r\u0131r, titre\u015fimi azalt\u0131r ve operasyonel g\u00fcvenilirli\u011fi iyile\u015ftirir.<\/p>\n<h3><strong>Avantajlar ve Temel Faydalar<\/strong><\/h3>\n<p>Gemini t\u00fcrbininin benzersiz yap\u0131land\u0131rmas\u0131, geli\u015ftiriciler ve operat\u00f6rler i\u00e7in ger\u00e7ek de\u011fer sa\u011flayan bir dizi teknik, operasyonel ve ekonomik avantaj sunar:<\/p>\n<p>&#8211; Tek bir \u015faftta \u00e7ok y\u00fcksek hacimsel debileri (50 m\u00b3\/s&#8217;yi a\u015fan) i\u015fleme yetene\u011fi<\/p>\n<p>&#8211; y\u00fczde 90&#8217;\u0131n \u00fczerinde izentropik verimlilik, kompakt bir makinede \u00e7oklu t\u00fcrbin sistemlerine e\u015fde\u011fer<\/p>\n<p>&#8211; Basitle\u015ftirilmi\u015f tesis d\u00fczeni ve azalt\u0131lm\u0131\u015f mekanik karma\u015f\u0131kl\u0131k<\/p>\n<p>&#8211; Kolay ve h\u0131zl\u0131 bak\u0131m i\u00e7in \u015faft kilitleme sistemi<\/p>\n<p>&#8211; Exergy&#8217;nin kan\u0131tlanm\u0131\u015f ROT teknolojisine dayal\u0131 g\u00fcvenilirlik (&gt;550 MWe d\u00fcnya \u00e7ap\u0131nda kurulu)<\/p>\n<p>&#8211; Konvansiyonel \u00e7oklu t\u00fcrbin yap\u0131land\u0131rmalar\u0131na g\u00f6re y\u00fczde 30&#8217;a kadar daha d\u00fc\u015f\u00fck santral maliyeti<\/p>\n<p>&#8211; K\u00fc\u00e7\u00fck ayak izi ve daha y\u00fcksek s\u00fcrd\u00fcr\u00fclebilirlik ile azalt\u0131lm\u0131\u015f montaj ve in\u015faat i\u015fleri<\/p>\n<p>&#8211; Daha h\u0131zl\u0131 yat\u0131r\u0131m geri d\u00f6n\u00fc\u015f\u00fc (ROI) ile iyile\u015ftirilmi\u015f proje ekonomisi<\/p>\n<p><strong>Exergy Uluslararas\u0131 CEO Yard\u0131mc\u0131s\u0131 Luca Pozzoni \u015f\u00f6yle yorumlad\u0131:<\/strong><em>&#8220;Gemini t\u00fcrbini, Exergy&#8217;nin teknolojik evriminde \u00f6nemli bir kilometre ta\u015f\u0131n\u0131 i\u015faret ediyor. M\u00fchendislik uzmanl\u0131\u011f\u0131m\u0131z\u0131n g\u00fcc\u00fcn\u00fc ve ekibimizin yarat\u0131c\u0131l\u0131\u011f\u0131n\u0131 sergiliyor; bu ekip s\u00fcrekli olarak teknolojimizin neler ba\u015farabilece\u011finin s\u0131n\u0131rlar\u0131n\u0131 zorluyor. Gemini ile daha y\u00fcksek performans, daha d\u00fc\u015f\u00fck maliyetler ve azalt\u0131lm\u0131\u015f \u00e7evresel ayak izi sunuyoruz \u2014 bunlar\u0131n hepsi b\u00fcy\u00fck \u00f6l\u00e7ekli jeotermal enerji \u00fcretiminin gelece\u011fi i\u00e7in hayati \u00f6neme sahip.&#8221;<\/em> dedi.<\/p>\n<p><strong>Exergy T\u00fcrbin Departman\u0131 M\u00fcd\u00fcr\u00fc Luca Vanini ekledi:<\/strong><em>&#8220;S\u00fcrekli iyile\u015ftirme, Exergy&#8217;de temel bir ilkedir. T\u00fcrbin M\u00fchendisimiz Giorgia Ruffato&#8217;nun bir fikriyle ba\u015flayan Gemini projesi, t\u00fcrbin departman\u0131m\u0131z i\u00e7inde geli\u015ftirildi ve t\u00fcm teknik ekiplerimizle yak\u0131n i\u015fbirli\u011fi i\u00e7inde rafine edildi. Bu, yenilik k\u00fclt\u00fcr\u00fcm\u00fcz\u00fc ve pratik, y\u00fcksek performansl\u0131 \u00e7\u00f6z\u00fcmlere olan ba\u011fl\u0131l\u0131\u011f\u0131m\u0131z\u0131 yans\u0131tan bir ba\u015far\u0131d\u0131r. Ger\u00e7ekle\u015fti\u011fini g\u00f6rmek, herkes i\u00e7in gurur verici bir an\u0131d\u0131r.&#8221;<\/em> dedi.<\/p>\n<h3><strong>Uygulamalar ve Pazar G\u00f6r\u00fcn\u00fcm\u00fc<\/strong><\/h3>\n<p>Gemini T\u00fcrbini, \u00e7ok y\u00fcksek debili jeotermal kaynaklar\u0131 daha verimli bir \u015fekilde kullanma konusunda yeni olanaklar sunuyor ve paralel \u00e7al\u0131\u015fan iki ROT t\u00fcrbini kullanan geleneksel yap\u0131land\u0131rmalar\u0131n yerini al\u0131yor. 30\u201360 MW aral\u0131\u011f\u0131ndaki b\u00fcy\u00fck \u00f6l\u00e7ekli jeotermal enerji santralleri i\u00e7in rekabet\u00e7i, maliyet etkin ve y\u00fcksek performansl\u0131 bir \u00e7\u00f6z\u00fcm sa\u011fl\u0131yor.<\/p>\n<p>Gemini, d\u00fcnya \u00e7ap\u0131nda jeotermal geli\u015fimin en umut verici s\u0131n\u0131r\u0131 olarak ortaya \u00e7\u0131kan yeni nesil EGS ve AGS teknolojilerine dayal\u0131 jeotermal sistemler i\u00e7in \u00f6zellikle uygundur. Bu sistemler, daha \u00f6nce jeotermal kullan\u0131m i\u00e7in uygun olmayan b\u00f6lgelerde enerji \u00fcretimine olanak tan\u0131r.<\/p>\n<p>2017&#8217;den bu yana, yeni nesil jeotermal teknolojilere yap\u0131lan yat\u0131r\u0131m h\u0131zla artt\u0131 \u2014 2024&#8217;te 2 milyar ABD dolar\u0131 seviyelerine y\u00fckseldi (Wood Mackenzie) \u2014 hem \u00f6zel hem de kamu sekt\u00f6r\u00fcn\u00fcn deste\u011fiyle. Uluslararas\u0131 Enerji Ajans\u0131&#8217;na g\u00f6re, k\u00fcresel jeotermal kapasite 2050 y\u0131l\u0131na kadar 800 GW&#8217;\u0131 a\u015fabilir ve d\u00fcnya elektri\u011finin yakla\u015f\u0131k y\u00fczde 8&#8217;ini sa\u011flayabilir \u2014 bu da jeotermal enerjiyi d\u00fcnyan\u0131n temiz enerji gelece\u011finde anahtar bir s\u00fctun olarak onayl\u0131yor.<\/p>\n<p>Yay\u0131na Alan: Alperen ERTA\u015e-<a href=\"http:\/\/alperen.ertas@enerjigazetesi.ist\">alperen.ertas@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Exergy&#8217;nin Radial D\u0131\u015f \u00c7\u0131k\u0131\u015fl\u0131 T\u00fcrbin (ROT) teknolojisinde yeni bir kilometre ta\u015f\u0131, tek bir \u015faftta 60 MWe&#8217;ye kadar g\u00fc\u00e7 \u00fcretimi sa\u011fl\u0131yor. Geli\u015fmi\u015f jeotermal [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":201507,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[117498,67,26866,117496,117497],"views":21,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/201506"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=201506"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/201506\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/201507"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=201506"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=201506"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=201506"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}