{"id":201236,"date":"2025-10-23T16:58:00","date_gmt":"2025-10-23T13:58:00","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=201236"},"modified":"2025-10-23T16:58:00","modified_gmt":"2025-10-23T13:58:00","slug":"dicle-elektrikin-dronlari-yer-altindaki-kacak-trafolari-yakaladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/dicle-elektrikin-dronlari-yer-altindaki-kacak-trafolari-yakaladi\/","title":{"rendered":"(Turkish) &#8217;Dicle Elektrik&#8217;in Dronlar\u0131 Yer Alt\u0131ndaki Ka\u00e7ak Trafolar\u0131 Yakalad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/201236\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Dicle Elektrik, \u015eanl\u0131urfa\u2019da Tar\u0131m ve Orman Bakanl\u0131\u011f\u0131\u2019n\u0131n m\u0131s\u0131r ekimi yasa\u011f\u0131na ra\u011fmen ka\u00e7ak sulama yapan \u00e7ift\u00e7ilerin yer alt\u0131na gizledi\u011fi 3 ka\u00e7ak trafoyu dron destekli kontrollerle ortaya \u00e7\u0131kard\u0131. Yakla\u015f\u0131k 250 hanenin elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131layabilecek kapasitede olan trafolara el konulabilmesi i\u00e7in savc\u0131l\u0131\u011fa su\u00e7 duyurusunda bulunuldu. Konuyla ilgili a\u00e7\u0131klamalarda bulunan Dicle Elektrik Genel M\u00fcd\u00fcr\u00fc Ya\u015far Arvas, \u201cKa\u00e7akla m\u00fccadele, kaynak israf\u0131na kar\u015f\u0131 s\u00fcrd\u00fcr\u00fclen bir kamu hizmetidir\u201d dedi.<\/strong><\/h2>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-201237 size-full\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/10\/1761204816_Topra__a_g__m__l___ka__ak_trafolar___Dicle_Elektrik_dronlar___buldu__4_.jpg\" alt=\"\" width=\"550\" height=\"402\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/10\/1761204816_Topra__a_g__m__l___ka__ak_trafolar___Dicle_Elektrik_dronlar___buldu__4_.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/10\/1761204816_Topra__a_g__m__l___ka__ak_trafolar___Dicle_Elektrik_dronlar___buldu__4_-300x219.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/10\/1761204816_Topra__a_g__m__l___ka__ak_trafolar___Dicle_Elektrik_dronlar___buldu__4_-500x365.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/10\/1761204816_Topra__a_g__m__l___ka__ak_trafolar___Dicle_Elektrik_dronlar___buldu__4_-68x50.jpg 68w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p>Kay\u0131ps\u0131z, kesintisiz ve kaliteli enerji da\u011f\u0131t\u0131m\u0131 hedefiyle \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcren Dicle Elektrik, sorumluluk b\u00f6lgesinde ka\u00e7ak elektrik kullan\u0131m\u0131n\u0131 \u00f6nlemeye y\u00f6nelik teknolojik operasyonlar\u0131na h\u0131z kesmeden devam ediyor. Bu kapsamda \u015eanl\u0131urfa\u2019da ka\u00e7ak trafo tespitine y\u00f6nelik havadan denetimler yapan \u015firket, yapay zeka destekli dronlar\u0131yla tar\u0131m arazilerinde ka\u00e7ak kullan\u0131m tespit etti. Viran\u015fehir il\u00e7esindeki k\u0131rsal mahallelerde yap\u0131lan kontrollerde, m\u0131s\u0131r ekimi yasa\u011f\u0131n\u0131n delinerek sulama amac\u0131yla kullan\u0131lan yer alt\u0131na gizlenmi\u015f 3 adet ka\u00e7ak trafoya ula\u015f\u0131ld\u0131.<\/p>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-201238 size-full\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/10\/1761204813_Topra__a_g__m__l___ka__ak_trafolar___Dicle_Elektrik_dronlar___buldu__1_.jpg\" alt=\"\" width=\"550\" height=\"343\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/10\/1761204813_Topra__a_g__m__l___ka__ak_trafolar___Dicle_Elektrik_dronlar___buldu__1_.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/10\/1761204813_Topra__a_g__m__l___ka__ak_trafolar___Dicle_Elektrik_dronlar___buldu__1_-300x187.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/10\/1761204813_Topra__a_g__m__l___ka__ak_trafolar___Dicle_Elektrik_dronlar___buldu__1_-500x312.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/10\/1761204813_Topra__a_g__m__l___ka__ak_trafolar___Dicle_Elektrik_dronlar___buldu__1_-80x50.jpg 80w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<h3><strong>Ka\u00e7ak kullan\u0131m, kamu kaynaklar\u0131n\u0131n israf\u0131d\u0131r<\/strong><\/h3>\n<p>Y\u00fcksek enerji \u00e7eki\u015fiyle hem \u015febekeye zarar veren hem de di\u011fer abonelerin hizmet kalitesini d\u00fc\u015f\u00fcren ka\u00e7ak trafolara el konulmas\u0131 i\u00e7in Dicle Elektrik taraf\u0131ndan savc\u0131l\u0131\u011fa su\u00e7 duyurusunda bulunuldu. Konuya ili\u015fkin de\u011ferlendirme yapan\u00a0<strong>Dicle Elektrik Genel M\u00fcd\u00fcr\u00fc Ya\u015far Arvas<\/strong>, <em>\u201cYaln\u0131zca ka\u00e7ak elektrikle de\u011fil, ayn\u0131 zamanda do\u011fan\u0131n, tar\u0131m\u0131n ve kamu kaynaklar\u0131n\u0131n bilin\u00e7sizce kullan\u0131m\u0131na kar\u015f\u0131 da m\u00fccadele veriyoruz. Bu, enerji \u015firketi olman\u0131n yan\u0131 s\u0131ra topluma kar\u015f\u0131 sorumlulu\u011fumuzun da bir gere\u011fidir. Zira ka\u00e7akla m\u00fccadele, kaynak israf\u0131na kar\u015f\u0131 s\u00fcrd\u00fcr\u00fclen bir kamu hizmetidir\u201d<\/em> ifadelerini kulland\u0131.<\/p>\n<h3><strong>Ka\u00e7ak trafolar yerin alt\u0131nda gizlense dahi bulunuyor<\/strong><\/h3>\n<p>Dicle Elektrik\u2019in yapay zeka destekli dron filosu, \u015eanl\u0131urfa\u2019n\u0131n Viran\u015fehir il\u00e7esine ba\u011fl\u0131 K\u0131zlarsaray\u0131 ve Samanl\u0131 mahallelerinde ger\u00e7ekle\u015ftirilen kontrollerde yer alt\u0131na g\u00f6m\u00fclerek \u00fczeri ta\u015f, toprak ve sulama borular\u0131yla kapat\u0131lm\u0131\u015f iki ayr\u0131 ka\u00e7ak trafoyu ortaya \u00e7\u0131kard\u0131. Her biri 160 KVA g\u00fcc\u00fcnde olan bu trafolarla toplam 250 d\u00f6n\u00fcm m\u0131s\u0131r tarlas\u0131n\u0131n yasa d\u0131\u015f\u0131 \u015fekilde suland\u0131\u011f\u0131 tespit edildi. Ayn\u0131 b\u00f6lgede yer alan Yay\u0131k Mahallesi\u2019nde yap\u0131lan yer kontrol\u00fcnde ise kayalar alt\u0131na gizlenmi\u015f ve \u00fcst\u00fc ta\u015flarla kamufle edilmi\u015f bir ba\u015fka ka\u00e7ak trafo daha bulundu. Bu trafoyla ise 50 d\u00f6n\u00fcm arazinin suland\u0131\u011f\u0131 belirlendi. Toplam g\u00fc\u00e7leri 480 KVA olan \u00fc\u00e7 ka\u00e7ak trafonun, yakla\u015f\u0131k 250 hanenin elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131layabilecek kapasitede oldu\u011fu kaydedildi.<\/p>\n<p>Yay\u0131na Alan: Alperen ERTA\u015e-<a href=\"http:\/\/alperen.ertas@enerjigazetesi.ist\">alperen.ertas@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Dicle Elektrik, \u015eanl\u0131urfa\u2019da Tar\u0131m ve Orman Bakanl\u0131\u011f\u0131\u2019n\u0131n m\u0131s\u0131r ekimi yasa\u011f\u0131na ra\u011fmen ka\u00e7ak sulama yapan \u00e7ift\u00e7ilerin yer alt\u0131na gizledi\u011fi 3 ka\u00e7ak trafoyu dron [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":201237,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[117375,12240,117374,2097,45699],"views":24,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/201236"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=201236"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/201236\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/201237"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=201236"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=201236"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=201236"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}