{"id":200981,"date":"2025-10-15T16:49:53","date_gmt":"2025-10-15T13:49:53","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=200981"},"modified":"2025-10-15T16:49:53","modified_gmt":"2025-10-15T13:49:53","slug":"salt-river-project-hidroelektrik-modernizasyon-projesini-tamamladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/salt-river-project-hidroelektrik-modernizasyon-projesini-tamamladi\/","title":{"rendered":"(Turkish) &#8217;Salt River Project&#8217; Hidroelektrik Modernizasyon Projesini Tamamlad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/200981\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Geli\u015fmi\u015f otomasyon \u00e7\u00f6z\u00fcmleri sunan end\u00fcstriyel teknoloji lideri Emerson, bug\u00fcn ABD&#8217;nin Arizona eyaletindeki Salt River nehri \u00fczerindeki d\u00f6rt Salt River Project (SRP) hidroelektrik baraj\u0131nda \u00e7ok y\u0131ll\u0131 bir modernizasyon projesinin tamamland\u0131\u011f\u0131n\u0131 duyurdu. SRP&#8217;nin Roosevelt, Horse Mesa, Mormon Flat ve Stewart Mountain barajlar\u0131, y\u0131ll\u0131k 60.000&#8217;den fazla eve elektrik sa\u011flamak i\u00e7in yeterli olan 265 megavatl\u0131k hidroelektrik enerji \u00fcretiyor.<\/h2>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-200982 size-full\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/10\/emerson-roosevelt-dam-en-us-11975028.jpg\" alt=\"\" width=\"550\" height=\"366\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/10\/emerson-roosevelt-dam-en-us-11975028.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/10\/emerson-roosevelt-dam-en-us-11975028-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/10\/emerson-roosevelt-dam-en-us-11975028-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/10\/emerson-roosevelt-dam-en-us-11975028-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/10\/emerson-roosevelt-dam-en-us-11975028-450x300.jpg 450w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p>SRP, enerji \u00fcretimi i\u00e7in hayati \u00f6nem ta\u015f\u0131yan eski ikaz sistemlerini modernize etti ve bunlar\u0131 d\u00f6rt hidroelektrik baraj\u0131nda halihaz\u0131rda mevcut olan da\u011f\u0131t\u0131lm\u0131\u015f kontrol sistemleriyle sorunsuz bir \u015fekilde entegre etti. Emerson&#8217;un\u00a0Ovation\u2122 Otomasyon Platformu&#8217;nu standart hale getirerek ve modern kontrol stratejileri uygulayarak, SRP i\u015fletim ve bak\u0131m maliyetlerini y\u00fczde 30 oran\u0131nda azaltt\u0131 ve sorun giderme s\u00fcresini yar\u0131 yar\u0131ya d\u00fc\u015f\u00fcrd\u00fc. B\u00f6ylece operasyonel s\u00fcreklili\u011fi sa\u011flad\u0131 ve \u015febeke performans\u0131n\u0131 g\u00fc\u00e7lendirdi. Geli\u015fmi\u015f operasyonel g\u00f6r\u00fcn\u00fcrl\u00fck, kritik ba\u015flatma ve durdurma prosed\u00fcrlerinin verimli olmas\u0131n\u0131 sa\u011flar ve s\u00fcrelerini iki kat\u0131na \u00e7\u0131karabilecek gecikmeleri \u00f6nler.<\/p>\n<p><strong>SRP Hydro elektrik m\u00fchendisi Shari Brady<\/strong>, &#8220;<em>Bureau of Reclamation barajlar\u0131n\u0131n uzun s\u00fcredir i\u015fletmecisi olarak, toplumun ihtiya\u00e7 duydu\u011fu g\u00fcvenilir, temiz ve s\u00fcrekli bir g\u00fc\u00e7 kayna\u011f\u0131 sa\u011flamaktan sorumluyuz&#8221;<\/em> dedi.<em> &#8220;Emerson&#8217;un tamamen birle\u015fik Ovation otomasyon platformunu hidroelektrik filomuzda ikaz ve tesis kontrol\u00fc i\u00e7in standart hale getirerek ve proje ekipleri aras\u0131nda yak\u0131n i\u015fbirli\u011fi yaparak, agresif programlara ra\u011fmen t\u00fcm sistem kurulumlar\u0131n\u0131 zaman\u0131nda tamamlad\u0131k. Art\u0131k daha fazla operasyonel i\u00e7g\u00f6r\u00fcye ve daha kolay sorun gidermeye sahibiz, bu da birim g\u00fcvenilirli\u011fini %90&#8217;l\u0131k bir seviyede tutmam\u0131za yard\u0131mc\u0131 oluyor.&#8221; <\/em>dedi.<\/p>\n<p>Phoenix b\u00f6lgesindeki rekor b\u00fcy\u00fcme ve hizmet alan\u0131ndaki a\u015f\u0131r\u0131 s\u0131cakl\u0131klar nedeniyle artan elektrik t\u00fcketimi, SRP gibi enerji sa\u011flay\u0131c\u0131lar\u0131n\u0131n jenerat\u00f6r ikaz dahil altyap\u0131s\u0131n\u0131 iyile\u015ftirmeye yat\u0131r\u0131m yapmaya devam etmesini gerektirmi\u015ftir.<\/p>\n<p><strong>Emerson&#8217;un enerji ve su \u00e7\u00f6z\u00fcmleri ba\u015fkan\u0131 Bob Yeager,<\/strong> &#8220;<em>Hidroelektrik operasyonlar\u0131n\u0131n g\u00f6r\u00fcn\u00fcrl\u00fc\u011f\u00fcn\u00fcn ve g\u00fcvenilirli\u011finin artmas\u0131, SRP&#8217;in m\u00fc\u015fterilerine 7\/24 ihtiya\u00e7 duyduklar\u0131 enerjiyi verimli bir \u015fekilde sa\u011flamak i\u00e7in kesintisiz \u00e7al\u0131\u015fmas\u0131n\u0131 sa\u011flamaya yard\u0131mc\u0131 oluyor&#8221; dedi. &#8220;SRP&#8217;nin tamamen entegre bir otomasyon sistemini standartla\u015ft\u0131rma vizyonu, de\u011fi\u015fen enerji piyasalar\u0131 ve artan enerji ihtiyac\u0131 kar\u015f\u0131s\u0131nda bile, \u00f6n\u00fcm\u00fczdeki on y\u0131llar boyunca ba\u015far\u0131ya ula\u015fmalar\u0131n\u0131 sa\u011flayacak d\u00f6n\u00fc\u015ft\u00fcr\u00fcc\u00fc bir ad\u0131md\u0131.&#8221;<\/em> dedi.<\/p>\n<p>\u0130kisi pompa moduna ge\u00e7erken benzersiz entegrasyon gerektiren pompa ve enerji depolama \u00fcniteleri i\u00e7in olan \u00d6zel\u00a0Ovation Excitation Systems, (Jenerat\u00f6r \u0130kaz Sistemleri), mevcut Ovation da\u011f\u0131t\u0131k kontrollere sorunsuz bir \u015fekilde entegre edilmi\u015ftir. Yeni uyumlu tesis sistemi, SRP&#8217;nin hidroelektrik kapasitesini art\u0131rarak \u015febeke g\u00fcvenilirli\u011fini g\u00fc\u00e7lendirmeye ve g\u00fcne\u015f ve r\u00fczgar gibi daha fazla yenilenebilir enerji kayna\u011f\u0131 kullanan geli\u015fen \u015febekenin taleplerini kar\u015f\u0131lamaya yard\u0131mc\u0131 olur.<\/p>\n<p>SRP&#8217;nin yeni, tamamen entegre otomasyon platformu, ayn\u0131 yedek par\u00e7alar\u0131 kullanarak, e\u011fitimi kolayla\u015ft\u0131rarak, operat\u00f6rlerin a\u015final\u0131\u011f\u0131n\u0131 koruyarak ve otomasyon deste\u011fi ve servisi i\u00e7in tek bir ileti\u015fim noktas\u0131n\u0131 y\u00f6neterek operasyonlar\u0131 ve bak\u0131m\u0131 basitle\u015ftirir.<\/p>\n<p>Yay\u0131na Alan: Alperen ERTA\u015e-<a href=\"http:\/\/alperen.ertas@enerjigazetesi.ist\">alperen.ertas@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Geli\u015fmi\u015f otomasyon \u00e7\u00f6z\u00fcmleri sunan end\u00fcstriyel teknoloji lideri Emerson, bug\u00fcn ABD&#8217;nin Arizona eyaletindeki Salt River nehri \u00fczerindeki d\u00f6rt Salt River Project (SRP) hidroelektrik [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":200982,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[117273,44770,117270,117272,117271],"views":9,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/200981"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=200981"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/200981\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/200982"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=200981"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=200981"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=200981"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}