{"id":20089,"date":"2013-12-30T00:48:49","date_gmt":"2013-12-29T21:48:49","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=20089"},"modified":"2013-12-30T00:50:17","modified_gmt":"2013-12-29T21:50:17","slug":"canakkale-bogazinda-elektrik-uretim-testleri-subatda-baslayacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/canakkale-bogazinda-elektrik-uretim-testleri-subatda-baslayacak\/","title":{"rendered":"(Turkish) \u00c7anakkale Bo\u011faz\u0131`nda Elektrik \u00dcretim Testleri \u015eubat\u2019da Ba\u015flayacak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/20089\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u00c7anakkale Bo\u011faz\u0131`nda Mavi \u0130da Enerji \u015firketi taraf\u0131ndan Ar-Ge \u00e7al\u0131\u015fmalar\u0131 tamamlanan proje kapsam\u0131nda elektrik \u00fcretilebilmesi i\u00e7in \u015eubat ay\u0131nda testlere ba\u015flanaca\u011f\u0131 bildirildi.<\/strong><\/p>\n<p>\u015eirketin ortaklar\u0131ndan Abdullah Erkan, yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, bo\u011fazda elektrik \u00fcretimiyle ilgili haz\u0131rl\u0131klarda son a\u015famaya geldiklerini belirtti.<br \/>\nKepez beldesi a\u00e7\u0131klar\u0131nda kurduklar\u0131 platformla ak\u0131nt\u0131y\u0131 \u00f6l\u00e7t\u00fcklerini ve prototip t\u00fcrbinle elektrik \u00fcretmeyi ba\u015fard\u0131klar\u0131n\u0131 ifade eden Erkan, Ar-Ge \u00e7al\u0131\u015fmalar\u0131n\u0131 tamamlad\u0131klar\u0131n\u0131 kaydetti.<\/p>\n<p><strong>5 MW\u2019LIK SU ALTI ENERJ\u0130 SANTRAL\u0130N\u0130 HAYATA GE\u00c7\u0130R\u0130LECEK<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/canakkale-bogazinda-elektrik-uretim-testleri-subat-ta-baslayacak.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-20090\" title=\"canakkale-bogazinda-elektrik-uretim-testleri-subat-ta-baslayacak\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/canakkale-bogazinda-elektrik-uretim-testleri-subat-ta-baslayacak-300x192.jpg\" alt=\"\" width=\"300\" height=\"192\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/canakkale-bogazinda-elektrik-uretim-testleri-subat-ta-baslayacak-300x192.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/canakkale-bogazinda-elektrik-uretim-testleri-subat-ta-baslayacak-77x50.jpg 77w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/canakkale-bogazinda-elektrik-uretim-testleri-subat-ta-baslayacak.jpg 421w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><br \/>\nBo\u011faz\u0131n trafik hatt\u0131 d\u0131\u015f\u0131nda kalan ve ak\u0131nt\u0131 h\u0131z\u0131n\u0131n en y\u00fcksek oldu\u011fu noktas\u0131ndaki Kepez Burnu`nda yer alan b\u00f6lgeyi 30 y\u0131ll\u0131\u011f\u0131na kiralad\u0131klar\u0131 bilgisini veren Erkan, \u015f\u00f6yle devam etti:<\/p>\n<p>&#8220;B\u00f6lge, T\u00fcrkiye bo\u011fazlar\u0131nda Montr\u00f6 Bo\u011fazlar S\u00f6zle\u015fmesine g\u00f6re bo\u011faz trafi\u011fini engellemeyecek noktalar aras\u0131nda su alt\u0131 ak\u0131nt\u0131 t\u00fcrbin \u00e7iftli\u011fi kurmak i\u00e7in en uygun yerdir. Yerli kaynaklarla herhangi bir teknoloji transferi olmadan ak\u0131nt\u0131 t\u00fcrbini yapmak i\u00e7in \u00e7al\u0131\u015fmalara ba\u015flanm\u0131\u015ft\u0131r. Bunun i\u00e7in \u00e7e\u015fitli modeller dizayn edilmi\u015f ve bunlar\u0131n ger\u00e7ek ko\u015fullarda testlerini yapmak i\u00e7in bir test platformu haz\u0131rlam\u0131\u015ft\u0131r.<\/p>\n<p>T\u00fcrkiye Bilimsel ve Teknolojik Ara\u015ft\u0131rma Kurumu (T\u00dcB\u0130TAK) taraf\u0131ndan da desteklenen projede son a\u015famaya gelinmi\u015ftir. Testler i\u00e7in \u00e7al\u0131\u015fmalar devam etmektedir. Proje kapsam\u0131nda tamam\u0131 firmam\u0131z taraf\u0131ndan \u00fcretilen 30 kilovatl\u0131k t\u00fcrbin, T\u00fcrkiye`nin ilk deniz ak\u0131nt\u0131 t\u00fcrbini olma \u00f6zelli\u011fini ta\u015f\u0131maktad\u0131r. Prototip t\u00fcrbin, test \u00e7al\u0131\u015fmalar\u0131n\u0131n ard\u0131ndan Kepez b\u00f6lgesindeki alana g\u00f6t\u00fcr\u00fcl\u00fcp elektrik \u00fcretimine ba\u015flayacakt\u0131r. \u0130lk elektri\u011fi \u00fcretme tarihi olarak 2014`\u00fcn \u015fubat ay\u0131n\u0131n ilk haftas\u0131n\u0131 hedefliyoruz.&#8221;<\/p>\n<p>Denemelerin ba\u015far\u0131l\u0131 sonu\u00e7lanmas\u0131 durumunda yat\u0131r\u0131m karar\u0131 al\u0131narak prototip t\u00fcrbinin ticari ama\u00e7l\u0131 \u00fcretilece\u011fini kaydeden Erkan, b\u00f6lgede 5 MW\u2019l\u0131k su alt\u0131 enerji santralini hayata ge\u00e7irmeyi hedeflediklerini duyurdu.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/canakkale-bogazinda-elektrik-uretim-testleri-subat_6324.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u00c7anakkale Bo\u011faz\u0131`nda Mavi \u0130da Enerji \u015firketi taraf\u0131ndan Ar-Ge \u00e7al\u0131\u015fmalar\u0131 tamamlanan proje kapsam\u0131nda elektrik \u00fcretilebilmesi i\u00e7in \u015eubat ay\u0131nda testlere ba\u015flanaca\u011f\u0131 bildirildi. \u015eirketin ortaklar\u0131ndan Abdullah [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":20090,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[11684,11683,2083,11686,19,63,67,1009,165,11682,11685,1971,7744],"views":1156,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/20089"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=20089"}],"version-history":[{"count":4,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/20089\/revisions"}],"predecessor-version":[{"id":20094,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/20089\/revisions\/20094"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/20090"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=20089"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=20089"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=20089"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}