{"id":200866,"date":"2025-10-12T21:24:41","date_gmt":"2025-10-12T18:24:41","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=200866"},"modified":"2025-10-12T22:31:08","modified_gmt":"2025-10-12T19:31:08","slug":"sivas-ruzgarini-yesil-enerjiye-cevirecek-anlasma","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sivas-ruzgarini-yesil-enerjiye-cevirecek-anlasma\/","title":{"rendered":"(Turkish) Sivas R\u00fczgar\u0131n\u0131 Ye\u015fil Enerjiye \u00c7evirecek Anla\u015fma"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/200866\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>T\u00fcrkiye\u2019nin \u00f6nde gelen m\u00fchendislik ve teknoloji \u015firketlerinden YEO Teknoloji, T\u00fcrkiye\u2019nin ye\u015fil d\u00f6n\u00fc\u015f\u00fcme katk\u0131 sa\u011flayacak \u00f6nemli bir projeye daha ba\u015fl\u0131yor. YEO Teknoloji, Efor Holding b\u00fcnyesindeki Yellice Elektrik \u00dcretim A.\u015e. ile s\u00f6zle\u015fme imzalad\u0131. Buna g\u00f6re YEO Teknoloji, Sivas\u2019ta in\u015fa edilecek 160 MW kurulu g\u00fcce sahip Yellice R\u00fczg\u00e2r Enerji Santrali\u2019nin, anahtar teslim EPC (M\u00fchendislik, Tedarik, Montaj ve Devreye alma) s\u00fcre\u00e7lerini \u00fcstlenecek.<\/h2>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-200867 size-full\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/10\/1760086435_Efor_Holding_Enerji_Grubu_Genel_Mu__du__ru___Merih_Sakarya_YEO_Teknoloji_I__s___Gelis__tirme_ve_Sat__s___Bas__kan_Yard__mc__s___Bar__s___Esen.jpg\" alt=\"\" width=\"550\" height=\"360\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/10\/1760086435_Efor_Holding_Enerji_Grubu_Genel_Mu__du__ru___Merih_Sakarya_YEO_Teknoloji_I__s___Gelis__tirme_ve_Sat__s___Bas__kan_Yard__mc__s___Bar__s___Esen.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/10\/1760086435_Efor_Holding_Enerji_Grubu_Genel_Mu__du__ru___Merih_Sakarya_YEO_Teknoloji_I__s___Gelis__tirme_ve_Sat__s___Bas__kan_Yard__mc__s___Bar__s___Esen-300x196.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/10\/1760086435_Efor_Holding_Enerji_Grubu_Genel_Mu__du__ru___Merih_Sakarya_YEO_Teknoloji_I__s___Gelis__tirme_ve_Sat__s___Bas__kan_Yard__mc__s___Bar__s___Esen-500x327.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/10\/1760086435_Efor_Holding_Enerji_Grubu_Genel_Mu__du__ru___Merih_Sakarya_YEO_Teknoloji_I__s___Gelis__tirme_ve_Sat__s___Bas__kan_Yard__mc__s___Bar__s___Esen-76x50.jpg 76w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<h3><strong>Y\u0131lda 450 GWh enerji \u00fcretecek<\/strong><\/h3>\n<p>Yenilenebilir Enerji Kaynak Alanlar\u0131 (YEKA) modeliyle geli\u015ftirilen projeler, yerli m\u00fchendislik kapasitesiyle birlikte T\u00fcrkiye\u2019nin enerji ba\u011f\u0131ms\u0131zl\u0131\u011f\u0131na katk\u0131 sa\u011fl\u0131yor. 2050 net s\u0131f\u0131r karbon hedefine ula\u015fma yolunda \u00f6nemli bir ad\u0131m olan Yellice R\u00fczg\u00e2r Enerji Santrali ile, enerji \u00fcretiminde yenilenebilir kaynaklar\u0131n pay\u0131 art\u0131r\u0131l\u0131rken, her y\u0131l 270 bin ton karbondioksit sal\u0131m\u0131 engellenecek. Yellice R\u00fczg\u00e2r Enerji Santrali 7 MW kapasiteli, 23 adet t\u00fcrbinle toplam 160 MW kurulu g\u00fcce ula\u015facak. Santral devreye al\u0131nd\u0131\u011f\u0131nda y\u0131lda yakla\u015f\u0131k 450 GWh elektrik \u00fcretimi sa\u011flanacak.<\/p>\n<h3><strong>T\u00fcrkiye\u2019nin ye\u015fil d\u00f6n\u00fc\u015f\u00fcm vizyonuna katk\u0131<\/strong><strong><br \/>\n<\/strong><\/h3>\n<p>9.986.000\u00a0USD bedelindeki\u00a0s\u00f6zle\u015fme kapsam\u0131nda enerji \u00fcretiminden da\u011f\u0131t\u0131ma kadar u\u00e7tan uca \u00e7\u00f6z\u00fcmler geli\u015ftiren YEO Teknoloji, elektrifikasyon ve otomasyon altyap\u0131s\u0131n\u0131n tasar\u0131m, m\u00fchendislik, tedarik, montaj, test ve devreye alma s\u00fcre\u00e7lerinin tamam\u0131n\u0131 \u00fcstlenecek. S\u00f6z konusu proje, YEO Teknoloji\u2019nin r\u00fczg\u00e2r enerjisi alan\u0131ndaki teknik liderli\u011fini g\u00fc\u00e7lendirirken, s\u00fcrd\u00fcr\u00fclebilir enerji d\u00f6n\u00fc\u015f\u00fcm\u00fcnde g\u00fcvenilir \u00e7\u00f6z\u00fcm orta\u011f\u0131 kimli\u011fini peki\u015ftiriyor.<\/p>\n<p><strong>YEO\u00a0Teknoloji \u0130\u015f Geli\u015ftirme ve Sat\u0131\u015f Ba\u015fkan Yard\u0131mc\u0131s\u0131\u00a0Bar\u0131\u015f Esen\u00a0<\/strong>\u015funlar\u0131 dile getirdi<strong>: <em>\u201c<\/em><\/strong><em>YEO Teknoloji olarak, s\u00fcrd\u00fcr\u00fclebilir enerjiye ge\u00e7i\u015fte \u00f6nc\u00fc rol \u00fcstlenme vizyonumuz do\u011frultusunda, 160MW g\u00fcc\u00fcndeki Yellice R\u00fczg\u00e2r Enerji Santrali projesinde g\u00f6rev almak bizim i\u00e7in b\u00fcy\u00fck bir gurur ayn\u0131 zamanda da ciddi bir sorumluluk anlam\u0131na geliyor. Y\u0131ll\u0131k 450 GWh elektrik \u00fcretimi ile 125.000 hanenin elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131layabilecek kapasitedeki r\u00fczg\u00e2r enerji santrali projesinin, 1.350.000 a\u011fac\u0131n \u00e7evresel etkisine e\u015fde\u011fer olacak \u015fekilde y\u0131lda yakla\u015f\u0131k 270.000 ton CO\u2082\u00a0sal\u0131m\u0131n\u0131 \u00f6nlemesi planlan\u0131yor. Bu proje, yaln\u0131zca teknik bir uygulama de\u011fil; ayn\u0131 zamanda T\u00fcrkiye\u2019nin yenilenebilir enerji hedeflerine katk\u0131 sunan, \u00e7evresel s\u00fcrd\u00fcr\u00fclebilirli\u011fi destekleyen ve b\u00f6lgesel kalk\u0131nmay\u0131 te\u015fvik eden stratejik bir ad\u0131m niteli\u011fi ta\u015f\u0131yor.<strong>\u00a0<\/strong>YEO Teknoloji\u2019nin m\u00fchendislikten uygulamaya kadar olan entegre \u00e7\u00f6z\u00fcm yakla\u015f\u0131m\u0131, Yellice R\u00fczg\u00e2r Enerji Santrali projesinde de en y\u00fcksek kalite ve verimlilik standartlar\u0131yla hayata ge\u00e7irilecek. Bu proje, sadece bug\u00fcn\u00fcn de\u011fil, gelece\u011fin enerji ihtiya\u00e7lar\u0131na da cevap verecek bir altyap\u0131n\u0131n temelini olu\u015fturuyor.\u201d<\/em> dedi.<\/p>\n<p><strong>Efor Holding Enerji Grubu Genel M\u00fcd\u00fcr\u00fc Merih Sakarya\u00a0<\/strong>ise \u015funlar\u0131 s\u00f6yledi<strong>:<\/strong><\/p>\n<p><em>\u201cYellice R\u00fczg\u00e2r Enerji Santrali projesi, Efor Holding\u2019in yenilenebilir enerji yat\u0131r\u0131mlar\u0131nda att\u0131\u011f\u0131 en g\u00fc\u00e7l\u00fc ad\u0131mlardan birini temsil ediyor. Sivas\u2019ta hayata ge\u00e7irilecek bu proje, yaln\u0131zca \u00fclkemizin enerji arz g\u00fcvenli\u011fine de\u011fil, ayn\u0131 zamanda s\u00fcrd\u00fcr\u00fclebilir kalk\u0131nma hedeflerine de katk\u0131 sa\u011flayacak. Projeyi h\u0131zl\u0131 bir \u015fekilde hayata ge\u00e7irmek i\u00e7in YEO Teknoloji ile kurdu\u011fumuz i\u015f birli\u011fi, yerli m\u00fchendislik g\u00fcc\u00fcn\u00fc ve teknolojik yetkinli\u011fi bir araya getirerek \u00fclkemizin ye\u015fil d\u00f6n\u00fc\u015f\u00fcm yolculu\u011funa ivme kazand\u0131racak. Biz, Efor Holding Enerji Grubu olarak 2030\u2019a kadar 1000 MW kurulu g\u00fcce ula\u015fma hedefimiz do\u011frultusunda yenilenebilir enerjiye yapt\u0131\u011f\u0131m\u0131z yat\u0131r\u0131mlar\u0131 kararl\u0131l\u0131kla s\u00fcrd\u00fcrece\u011fiz.\u201d<\/em> dedi.<\/p>\n<h3><strong>Hedef 1 GW ye\u015fil enerji<\/strong><\/h3>\n<p>Bug\u00fcne kadar 272,5 MW yenilenebilir kurulu g\u00fcce ula\u015fan Efor Holding 2030\u2019a kadar 1 GW kapasiteye ula\u015fmay\u0131 hedefliyor.\u00a0YEO Teknoloji de geli\u015fmi\u015f enerji depolama \u00e7\u00f6z\u00fcmlerinden, elektrik \u015febekelerine; y\u00fcksek voltaj trafo merkezlerinden, yenilenebilir enerji santrallerine; end\u00fcstriyel, ticari tesisler ve hanelerin enerji d\u00f6n\u00fc\u015f\u00fcm\u00fcnden hidrojene kadar farkl\u0131 alanlarda b\u00fcy\u00fcyor.\u00a0YEO Teknoloji\u2019nin stratejik enerji yat\u0131r\u0131mlar\u0131 yapan i\u015ftiraki Call Energy de 2030 y\u0131l\u0131na kadar 1,2 GW yenilenebilir enerji kurulu g\u00fcc\u00fcne ula\u015fmay\u0131 hedefliyor. YEO Teknoloji ile Efor Holding aras\u0131ndaki bu i\u015f birli\u011fi, iki grubun s\u00fcrd\u00fcr\u00fclebilir enerji vizyonlar\u0131n\u0131 birle\u015ftirerek, T\u00fcrkiye\u2019nin ye\u015fil d\u00f6n\u00fc\u015f\u00fcm yolculu\u011funda yeni projelere kap\u0131 a\u00e7acak.<\/p>\n<p>Geli\u015fmi\u015f enerji depolama \u00e7\u00f6z\u00fcmlerinden, elektrik \u015febekelerine; y\u00fcksek voltaj trafo merkezlerinden, yenilenebilir enerji santrallerine; end\u00fcstriyel, ticari tesisler ve hanelerin enerji d\u00f6n\u00fc\u015f\u00fcm\u00fcnden hidrojene kadar farkl\u0131 alanlarda projeler y\u00fcr\u00fcten YEO Teknoloji, 3 k\u0131tada ve 30\u2019dan fazla \u00fclkede 400\u2019den fazla proje tamamlad\u0131. YEO Teknoloji, dekarbonizasyon, desantralizasyon ve dijitalizasyon odakl\u0131 \u00e7al\u0131\u015fmalar\u0131yla daha ya\u015fanabilir bir d\u00fcnya i\u00e7in \u2018Bizce m\u00fcmk\u00fcn\u2019 slogan\u0131yla b\u00fcy\u00fcmeye devam ediyor.<\/p>\n<p>Yay\u0131na Alan: Alperen ERTA\u015e-<a href=\"http:\/\/alperen.ertas@enerjigazetesi.ist\">alperen.ertas@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin \u00f6nde gelen m\u00fchendislik ve teknoloji \u015firketlerinden YEO Teknoloji, T\u00fcrkiye\u2019nin ye\u015fil d\u00f6n\u00fc\u015f\u00fcme katk\u0131 sa\u011flayacak \u00f6nemli bir projeye daha ba\u015fl\u0131yor. YEO Teknoloji, Efor [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":200867,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[115662,8173,846,117228,96708],"views":17,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/200866"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=200866"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/200866\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/200867"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=200866"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=200866"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=200866"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}