{"id":20072,"date":"2013-12-30T00:21:32","date_gmt":"2013-12-29T21:21:32","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=20072"},"modified":"2013-12-30T00:21:32","modified_gmt":"2013-12-29T21:21:32","slug":"enerjisadan-bu-yil-500-mwlik-hes-yatirimi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/enerjisadan-bu-yil-500-mwlik-hes-yatirimi\/","title":{"rendered":"(Turkish) Enerjisa\u2019dan Bu Y\u0131l 500 MW\u2019l\u0131k HES Yat\u0131r\u0131m\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/20072\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Enerjisa, 2013 y\u0131l\u0131nda yakla\u015f\u0131k 500 mw\u2019l\u0131k yedi Hidroelektrik santralini devreye ald\u0131. Sabanc\u0131 Holding ve E.ON ortakl\u0131\u011f\u0131nda Enerjisa, 2015 y\u0131l\u0131 i\u00e7in belirledi\u011fi 5.000 MW kurulu g\u00fc\u00e7 hedefi do\u011frultusunda \u00fcretim santrallerini devreye almaya devam ediyor.<\/strong><\/p>\n<p>T\u00fcrkiye\u2019nin elektrik enerjisi ihtiyac\u0131n\u0131 en <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/enerjisadan-bu-yil-500-mwlik-hes-yatirimi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-20073\" title=\"enerjisadan-bu-yil-500-mwlik-hes-yatirimi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/enerjisadan-bu-yil-500-mwlik-hes-yatirimi-300x215.jpg\" alt=\"\" width=\"300\" height=\"215\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/enerjisadan-bu-yil-500-mwlik-hes-yatirimi-300x215.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/enerjisadan-bu-yil-500-mwlik-hes-yatirimi-69x50.jpg 69w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/enerjisadan-bu-yil-500-mwlik-hes-yatirimi.jpg 407w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>g\u00fcvenilir ve \u00e7evreyle uyumlu bir \u015fekilde kar\u015f\u0131lamak i\u00e7in kaynak \u00e7e\u015fitli\u011fi yaratan Enerjisa, yenilenebilir enerji portf\u00f6y\u00fcn\u00fc geni\u015fletiyor.<\/p>\n<p>Enerjisa, ge\u00e7ti\u011fimiz aylarda Da\u011fdelen HES (8 MW), Kandil HES (207 MW), Ku\u015fakl\u0131 HES (20 MW), K\u00f6pr\u00fc HES (156 MW), Sar\u0131g\u00fczel HES (103 MW) santrallar\u0131n\u0131 devreye alm\u0131\u015ft\u0131.<\/p>\n<p>Son olarak, 20 Aral\u0131k 2013\u2019te t\u00fcm \u00fcniteleri ile \u00c7amba\u015f\u0131 HES (45 MW) ve 1. \u00fcnitesi ile Kav\u015fak Bendi HES (62 MW) santrallar\u0131n\u0131 devreye alan Enerjisa, bug\u00fcn geldi\u011fi noktada 2435 MW kurulu g\u00fcce ula\u015ft\u0131.<\/p>\n<p>Enerjisa CEO\u2019su Yetik K. Mert, konuyla ilgili yapt\u0131\u011f\u0131 a\u00e7\u0131klamada; \u201cDevreye ald\u0131\u011f\u0131m\u0131z t\u00fcm projelerde, T\u00fcrkiye\u2019nin enerji ihtiyac\u0131n\u0131 yenilik\u00e7i teknolojiler ile kar\u015f\u0131lamaya yard\u0131mc\u0131 olmay\u0131 ama\u00e7l\u0131yoruz. Bu kapsamda, karbon sal\u0131n\u0131m\u0131n\u0131n azalt\u0131lmas\u0131na katk\u0131da bulunuyor ve yenilenebilir enerji kaynaklar\u0131n\u0131 \u00fcretim portfoy\u00fcm\u00fcze katmaya devam ediyoruz. 2013\u2019de yenilenebilir enerjinin portf\u00f6y\u00fcm\u00fczdeki pay\u0131n\u0131 y\u00fczde 23\u2019den y\u00fczde 51\u2019e y\u00fckselttik&#8221; dedi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/enerjisadan-bu-yil-500-mwlik-hes-yatirimi_6314.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Enerjisa, 2013 y\u0131l\u0131nda yakla\u015f\u0131k 500 mw\u2019l\u0131k yedi Hidroelektrik santralini devreye ald\u0131. Sabanc\u0131 Holding ve E.ON ortakl\u0131\u011f\u0131nda Enerjisa, 2015 y\u0131l\u0131 i\u00e7in belirledi\u011fi 5.000 MW [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":20073,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[1129,63,67,1009,165,18,422,35370,2578,1090,9133,11671],"views":1191,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/20072"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=20072"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/20072\/revisions"}],"predecessor-version":[{"id":20074,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/20072\/revisions\/20074"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/20073"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=20072"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=20072"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=20072"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}