{"id":200289,"date":"2025-09-17T00:16:49","date_gmt":"2025-09-16T21:16:49","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=200289"},"modified":"2025-09-17T00:16:50","modified_gmt":"2025-09-16T21:16:50","slug":"ic-enterra-yeka-erzin-2-gunes-projesi-icin-finansman-anlasmasini-imzaladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ic-enterra-yeka-erzin-2-gunes-projesi-icin-finansman-anlasmasini-imzaladi\/","title":{"rendered":"(Turkish) &#8217;IC Enterra&#8217; YEKA Erzin-2 G\u00fcne\u015f Projesi \u0130\u00e7in Finansman Anla\u015fmas\u0131n\u0131 \u0130mzalad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/200289\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>IC Enterra Yenilenebilir Enerji, Hatay\u2019da hayata ge\u00e7irdi\u011fi 100 MW kapasiteli YEKA Erzin-2 G\u00fcne\u015f Enerjisi Santrali (GES) i\u00e7in Asya Altyap\u0131 Yat\u0131r\u0131m Bankas\u0131 (AIIB) ve T\u00fcrkiye S\u0131nai Kalk\u0131nma Bankas\u0131 (TSKB) ile toplam 65 milyon ABD dolar\u0131 tutar\u0131nda finansman anla\u015fmas\u0131na imza att\u0131.<\/strong><\/h2>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-200291 size-full\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/1757924200_Erzin_2_GES.jpg\" alt=\"\" width=\"550\" height=\"412\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/1757924200_Erzin_2_GES.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/1757924200_Erzin_2_GES-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/1757924200_Erzin_2_GES-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/1757924200_Erzin_2_GES-67x50.jpg 67w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p>T\u00fcrkiye\u2019nin enerji d\u00f6n\u00fc\u015f\u00fcm\u00fcnde \u00f6nc\u00fc rol \u00fcstlenen IC Enterra, Hatay\u2019da in\u015fa etti\u011fi YEKA Erzin-II G\u00fcne\u015f Enerjisi Santrali i\u00e7in sa\u011flad\u0131\u011f\u0131 65 milyon dolarl\u0131k uluslararas\u0131 finansmanla yat\u0131r\u0131mlar\u0131na ivme kazand\u0131r\u0131yor. Asya Altyap\u0131 Yat\u0131r\u0131m Bankas\u0131 (AIIB) ve T\u00fcrkiye S\u0131nai Kalk\u0131nma Bankas\u0131 (TSKB) ile yap\u0131lan anla\u015fma, IC Enterra\u2019n\u0131n s\u00fcrd\u00fcr\u00fclebilir b\u00fcy\u00fcme yolunda att\u0131\u011f\u0131 \u00f6nemli ad\u0131mlardan biri olarak dikkat \u00e7ekiyor. Y\u0131ll\u0131k ortalama 248.000 MWh elektrik \u00fcretmesi \u00f6ng\u00f6r\u00fclen santral, yakla\u015f\u0131k 155 bin hanenin enerji ihtiyac\u0131n\u0131 kar\u015f\u0131layacak. \u00a0Y\u0131ll\u0131k 157 bin ton karbon emisyonunun \u00f6n\u00fcne ge\u00e7ecek santral, T\u00fcrkiye\u2019nin s\u00fcrd\u00fcr\u00fclebilir elektrik arz\u0131na katk\u0131 sa\u011flayacak.<\/p>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-200292\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/img1-1.jpg\" alt=\"\" width=\"550\" height=\"532\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/img1-1.jpg 496w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/img1-1-300x290.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/img1-1-413x400.jpg 413w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/img1-1-52x50.jpg 52w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p><strong>IC Enterra Yenilenebilir Enerji CEO\u2019su<\/strong>\u00a0<strong>Cem A\u015f\u0131k<\/strong>, anla\u015fmaya ili\u015fkin \u015fu de\u011ferlendirmelerde bulundu:<em> \u201cYat\u0131r\u0131mlar\u0131m\u0131za h\u0131z verdi\u011fimiz bu d\u00f6nemde, AIIB ve TSKB gibi g\u00fc\u00e7l\u00fc finansal kurumlarla ger\u00e7ekle\u015ftirdi\u011fimiz i\u015f birli\u011fi bizim i\u00e7in b\u00fcy\u00fck bir anlam ta\u015f\u0131yor. Erzin-2 GES, yaln\u0131zca IC Enterra\u2019n\u0131n b\u00fcy\u00fcme yol haritas\u0131nda stratejik bir yere sahip olmakla kalm\u0131yor. Ayn\u0131 zamanda T\u00fcrkiye\u2019nin enerji arz g\u00fcvenli\u011fine katk\u0131 sa\u011flayan, s\u00fcrd\u00fcr\u00fclebilir b\u00fcy\u00fcmeyi ve b\u00f6lgesel kalk\u0131nmay\u0131 destekleyen bir yat\u0131r\u0131m olarak \u00f6ne \u00e7\u0131k\u0131yor. <\/em><em>Bu anla\u015fma sayesinde kredi maliyetlerimizi d\u00fc\u015f\u00fcr\u00fcrken vade avantaj\u0131 da elde ettik. B\u00f6ylece gelecek d\u00f6nemde ger\u00e7ekle\u015ftirece\u011fimiz yeni yat\u0131r\u0131mlar i\u00e7in de daha sa\u011flam bir finansal zemin olu\u015fturmu\u015f olduk. 2023\u2019te b\u00fcy\u00fck bir felaket ya\u015fayan Hatay\u2019da ekonomik ve sosyal hayat\u0131n yeniden canlanmas\u0131na katk\u0131 sunacak bir projeyi hayata ge\u00e7irmekten de b\u00fcy\u00fck gurur duyuyoruz. YEKA Erzin-2 GES ile T\u00fcrkiye\u2019nin sahip oldu\u011fu y\u00fcksek g\u00fcne\u015f potansiyelini de\u011ferlendirerek karbon sal\u0131mlar\u0131n\u0131 azalt\u0131yor, gelecek nesiller i\u00e7in temiz, g\u00fcvenilir ve eri\u015filebilir enerji kaynaklar\u0131n\u0131 g\u00fcvence alt\u0131na al\u0131yoruz.\u201d<\/em> dedi.<\/p>\n<p>Yay\u0131na Alan: Alperen ERTA\u015e-<a href=\"http:\/\/alperen.ertas@enerjigazetesi.ist\">alperen.ertas@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. IC Enterra Yenilenebilir Enerji, Hatay\u2019da hayata ge\u00e7irdi\u011fi 100 MW kapasiteli YEKA Erzin-2 G\u00fcne\u015f Enerjisi Santrali (GES) i\u00e7in Asya Altyap\u0131 Yat\u0131r\u0131m Bankas\u0131 (AIIB) [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":200291,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[111932,117123],"views":16,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/200289"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=200289"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/200289\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/200291"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=200289"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=200289"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=200289"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}