{"id":200110,"date":"2025-09-09T23:11:09","date_gmt":"2025-09-09T20:11:09","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=200110"},"modified":"2025-09-10T14:45:22","modified_gmt":"2025-09-10T11:45:22","slug":"izmirin-ruzgar-enerjisi-kumelenmesi-tehlikede","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/izmirin-ruzgar-enerjisi-kumelenmesi-tehlikede\/","title":{"rendered":"(Turkish) \u0130zmir&#8217;in R\u00fczg\u00e2r Enerjisi K\u00fcmelenmesi Tehlikede"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/200110\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>R\u00fczg\u00e2r enerjisi end\u00fcstrisinde d\u00fcnyan\u0131n en kapsaml\u0131 k\u00fcmelenme \u00f6rnekleri aras\u0131nda yer alan \u0130zmir\u2019de son bir y\u0131lda d\u00f6rt t\u00fcrbin kanad\u0131 fabrikas\u0131n\u0131n \u00fc\u00e7\u00fcnde \u00fcretim durmak zorunda kald\u0131. Bu durum ba\u015fta YEKA (Yenilenebilir Enerji Kaynaklar\u0131 Destekleme Mekanizmas\u0131) yar\u0131\u015fmalar\u0131nda y\u00fczde 65\u2019lik yerlilik \u015fart\u0131yla Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 ile s\u00f6zle\u015fme imzalayan yat\u0131r\u0131mc\u0131lar a\u00e7\u0131s\u0131ndan b\u00fcy\u00fck sorun olu\u015fturuyor. Bug\u00fcn itibar\u0131yla T\u00fcrkiye\u2019deki ilk t\u00fcrbin kanad\u0131 \u00fcreticisi olan ve Ege Serbest B\u00f6lgesi\u2019nde \u00fcretimini s\u00fcrd\u00fcren Aero R\u00fczg\u00e2r End\u00fcstrisi A.\u015e \u00fcretimine devam edebiliyor.<\/h2>\n<p><img loading=\"lazy\" class=\"size-full wp-image-200112 aligncenter\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/izmir-in-ruzgar-enerjisi-kumelenmesi-tehlikede_1714464-1.jpg\" alt=\"\" width=\"550\" height=\"326\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/izmir-in-ruzgar-enerjisi-kumelenmesi-tehlikede_1714464-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/izmir-in-ruzgar-enerjisi-kumelenmesi-tehlikede_1714464-1-300x178.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/izmir-in-ruzgar-enerjisi-kumelenmesi-tehlikede_1714464-1-500x296.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/izmir-in-ruzgar-enerjisi-kumelenmesi-tehlikede_1714464-1-80x47.jpg 80w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<h3><strong>\u0130zmir K\u00fcmelenmesi Zorda<\/strong><\/h3>\n<p>R\u00fczg\u00e2r enerjisi sekt\u00f6r\u00fcnde ya\u015fanan son durumu de\u011ferlendiren Enerji Sanayicileri ve \u0130\u015f \u0130nsanlar\u0131 Derne\u011fi (ENS\u0130A) Y\u00f6netim Kurulu Ba\u015fkan\u0131 Alper Kalayc\u0131, \u0130zmir\u2019in T\u00fcrkiye\u2019deki d\u00f6rt r\u00fczg\u00e2r t\u00fcrbin kanad\u0131 fabrikas\u0131n\u0131n tamam\u0131na, 7 kule fabrikas\u0131n\u0131n 4\u2019\u00fcne ve sekt\u00f6re farkl\u0131 \u00f6l\u00e7eklerde \u00fcretim yapan y\u00fczlerce firmaya ev sahipli\u011fi yapt\u0131\u011f\u0131n\u0131, 25 y\u0131la yakla\u015fan bir \u00fcretim altyap\u0131s\u0131 oldu\u011funu an\u0131msatt\u0131.<\/p>\n<p>Bergama Organize Sanayi B\u00f6lgesi\u2019nde \u00fcretim yapan ve ge\u00e7en y\u0131l Mart ay\u0131nda kapanan LM Wind Power \u015firketinin ard\u0131ndan \u00c7i\u011fli &#8211; Sasal\u0131 ve \u0130zmir Serbest B\u00f6lgesi\u2019nde iki fabrikas\u0131 bulunan TPI Composites firmas\u0131n\u0131n da May\u0131s ay\u0131 itibar\u0131yla \u00fcretimini durdurdu\u011funu vurgulayan <strong>Kalayc\u0131,<\/strong> <em>\u201cBa\u015fta Derne\u011fimiz olmak \u00fczere yenilenebilir enerji sekt\u00f6r\u00fcne odaklanan pek \u00e7ok sivil toplum \u00f6rg\u00fct\u00fc bu konuda uyar\u0131larda bulundu. T\u00fcrkiye ba\u015fta \u00fcretim maliyetleri olmak \u00fczere pek \u00e7ok ba\u015fl\u0131kta rekabet\u00e7i olmaktan uzakla\u015f\u0131yor. Son y\u0131llarda maliyetler a\u00e7\u0131s\u0131ndan Polonya, Portekiz gibi Avrupa Birli\u011fi \u00fclkelerinin bile gerisine d\u00fc\u015fm\u00fc\u015ft\u00fck. Kanat \u00fcretimi sayesinde \u0130zmir ili ba\u015fta olmak \u00fczere, \u00fclkemizde \u00e7ok ciddi bir tedarik\u00e7i zinciri de olu\u015fmu\u015ftu. Bu firmalar da ciddi zor g\u00fcnler ge\u00e7iriyor. Umar\u0131m en k\u0131sa s\u00fcrede eski \u00fcretim hacimlerine geri d\u00f6nebiliriz.\u201d<\/em> dedi.<\/p>\n<p>T\u00fcrkiye\u2019nin 2035 y\u0131l\u0131nda g\u00fcne\u015f ve r\u00fczg\u00e2r enerjisi toplam\u0131nda 120 bin MW kurulu g\u00fc\u00e7 hedefi belirledi\u011fini s\u00f6zlerine ekleyen Alper Kalayc\u0131, bu hedef kapsam\u0131nda her y\u0131l en az 3 bin MW seviyesinde r\u00fczg\u00e2r enerjisi kurulu g\u00fcc\u00fcn\u00fcn devreye al\u0131nmas\u0131 gerekti\u011fini kaydetti.<\/p>\n<h3>\u00a0<strong>Her Y\u0131l 3 Bin MW RES Kurulu G\u00fcc\u00fc<\/strong><\/h3>\n<p><strong>ENS\u0130A Y\u00f6netim Kurulu Ba\u015fkan\u0131 Alper Kalayc\u0131<\/strong> \u015fu de\u011ferlendirmeyi yapt\u0131: \u201c<em>Bug\u00fcn itibar\u0131yla 13 bin 700 MW seviyesinde olan r\u00fczg\u00e2r enerjisi kurulu g\u00fcc\u00fcm\u00fcz\u00fcn 2035 y\u0131l\u0131nda 43 bin MW olmas\u0131 ulusal hedef olarak t\u00fcm d\u00fcnyaya ilan edilmi\u015fti. Bu hedefin i\u00e7erisinde 5 bin MW seviyesinde deniz\u00fcst\u00fc (offshore) r\u00fczg\u00e2r santralleri de olacak. Bug\u00fcn ula\u015f\u0131lan mevcut kurulu g\u00fc\u00e7 d\u00fc\u015f\u00fcld\u00fc\u011f\u00fcnde, her y\u0131l yakla\u015f\u0131k 3 bin MW kurulu g\u00fcc\u00fc devreye almas\u0131 gereken T\u00fcrk r\u00fczg\u00e2r enerjisi sekt\u00f6r\u00fcnde, t\u00fcrbin kanatlar\u0131n\u0131n yerli \u00fcretimle kar\u015f\u0131lanmas\u0131 kritik \u00f6nem ta\u015f\u0131yor. Ancak bu \u00fcretimi yapacak d\u00f6rt fabrikan\u0131n \u00fc\u00e7\u00fc an itibar\u0131yla \u00fcretim yapm\u0131yor. Oysa ba\u015f d\u00f6nd\u00fcr\u00fcc\u00fc h\u0131zla geli\u015fen teknoloji, santrallerin kurulu g\u00fc\u00e7 kapasitelerini ve dolay\u0131s\u0131yla kanat uzunluklar\u0131n\u0131n artmas\u0131n\u0131 gerekli k\u0131larken, ihtiya\u00e7 duyulan kanatlar\u0131n uzunluklar\u0131 85 metrenin \u00fczerine \u00e7\u0131k\u0131yor. Bug\u00fcn T\u00fcrkiye\u2019nin s\u0131f\u0131r noktas\u0131nda bulundu\u011fu deniz\u00fcst\u00fc santrallerde ise kanat uzunluklar\u0131 120 metreyi buluyor.\u201d<\/em> dedi.<\/p>\n<h3><strong>Kalayc\u0131\u2019ya G\u00f6re T\u00fcrbin Kanad\u0131 \u00dcretiminin Durmas\u0131n\u0131n Sebepleri\u00a0<\/strong><\/h3>\n<p>&#8211; Resmi enflasyonun \u00e7ok \u00fcst\u00fcnde artan girdi maliyetleri<\/p>\n<p>&#8211; Ge\u00e7mi\u015f y\u0131llarda YEKA yar\u0131\u015fma takviminde s\u00fcrekli ertelemeye gidilmesi ve d\u00f6nem i\u00e7inde yeterli hacim olu\u015fturulamamas\u0131<\/p>\n<p>&#8211; Rekabet\u00e7i olmaktan \u00e7ok uzakta olan d\u00f6viz kurlar\u0131<\/p>\n<p>&#8211; Finansman kaynaklar\u0131na eri\u015fimin neredeyse imk\u00e2ns\u0131z olmas\u0131<\/p>\n<p>Yay\u0131na Alan: Alperen ERTA\u015e-<a href=\"http:\/\/alperen.ertas@enerjigazetesi.ist\">alperen.ertas@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. R\u00fczg\u00e2r enerjisi end\u00fcstrisinde d\u00fcnyan\u0131n en kapsaml\u0131 k\u00fcmelenme \u00f6rnekleri aras\u0131nda yer alan \u0130zmir\u2019de son bir y\u0131lda d\u00f6rt t\u00fcrbin kanad\u0131 fabrikas\u0131n\u0131n \u00fc\u00e7\u00fcnde \u00fcretim durmak [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":200112,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[115341,117085],"views":9,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/200110"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=200110"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/200110\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/200112"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=200110"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=200110"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=200110"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}