{"id":200023,"date":"2025-09-08T17:22:19","date_gmt":"2025-09-08T14:22:19","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=200023"},"modified":"2025-09-08T17:22:48","modified_gmt":"2025-09-08T14:22:48","slug":"eksim-enerji-kurulu-gucunu-1-030-mwa-cikarmayi-hedefliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/eksim-enerji-kurulu-gucunu-1-030-mwa-cikarmayi-hedefliyor\/","title":{"rendered":"(Turkish) Eksim Enerji Kurulu G\u00fcc\u00fcn\u00fc 1.030 MW&#8217;a \u00c7\u0131karmay\u0131 Hedefliyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/200023\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Ye\u015fil enerji yat\u0131r\u0131mlar\u0131na h\u0131z kazand\u0131ran Eksim Enerji, bir yandan mevcut santrallerinde kapasite art\u0131\u015f\u0131 projeleri y\u00fcr\u00fct\u00fcrken di\u011fer yandan yeni santral yat\u0131r\u0131mlar\u0131na devam ediyor. \u015eirket, Silivri RES\u2019te 10 yeni r\u00fczgar t\u00fcrbini ilavesiyle kapasitesini 129 MW\u2019a \u00e7\u0131karmay\u0131 ama\u00e7l\u0131yor. Ayr\u0131ca, Tokat\u2019\u0131n Killik il\u00e7esindeki RES tesisinde kapasite art\u0131\u015f\u0131 \u00e7al\u0131\u015fmalar\u0131 ise tamamlan\u0131rken, Karaman ve Yozgat\u2019ta yeni santral kurulumlar\u0131 da t\u00fcm h\u0131z\u0131yla devam ediyor. Yurt i\u00e7i ve d\u0131\u015f\u0131 yat\u0131r\u0131mlar\u0131yla y\u0131lsonunda yenilenebilir enerjide toplam kurulu g\u00fcc\u00fcn\u00fc 1.030 MW&#8217;a \u00e7\u0131karmay\u0131 planlayan Eksim Enerji, \u00fcretti\u011fi enerjiyle yakla\u015f\u0131k 1 milyon 230 bin hanenin enerji ihtiyac\u0131n\u0131 kar\u015f\u0131lamay\u0131 hedefliyor.\u00a0<\/strong><\/h2>\n<p><img loading=\"lazy\" class=\"size-full wp-image-200024 aligncenter\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/1757321947_Eksim_Enerji_Silivri_Res__2_.jpg\" alt=\"\" width=\"550\" height=\"367\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/1757321947_Eksim_Enerji_Silivri_Res__2_.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/1757321947_Eksim_Enerji_Silivri_Res__2_-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/1757321947_Eksim_Enerji_Silivri_Res__2_-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/1757321947_Eksim_Enerji_Silivri_Res__2_-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/1757321947_Eksim_Enerji_Silivri_Res__2_-450x300.jpg 450w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p>T\u00fcrkiye&#8217;nin ye\u015fil enerji d\u00f6n\u00fc\u015f\u00fcm\u00fcne katk\u0131 sunmay\u0131 misyon edinen Eksim Enerji, yeni projelerini devreye almaya ve kurulu g\u00fcc\u00fcn\u00fc y\u00fckseltmeye devam ediyor. \u015eirket, &#8220;2035 Yenilenebilir Enerji Hedefleri&#8221; do\u011frultusunda kapasite art\u0131r\u0131m \u00e7al\u0131\u015fmalar\u0131na h\u0131z verdi. Bu \u00e7al\u0131\u015fmalar aras\u0131nda yer alan ve y\u00fcksek r\u00fczgar verimlili\u011fiyle bilinen \u0130stanbul-Silivri\u2019deki Eksim Enerji RES tesisi, kapasite art\u0131\u015f\u0131yla 2025 sonunda 108 MW kurulu g\u00fcce ula\u015farak b\u00f6lgenin enerji ihtiyac\u0131na \u00f6nemli bir katk\u0131 sunacak.<\/p>\n<div id=\"attachment_200025\" style=\"width: 560px\" class=\"wp-caption aligncenter\"><img aria-describedby=\"caption-attachment-200025\" loading=\"lazy\" class=\"wp-image-200025 size-full\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/Eksim_Enerji_CEO_Ark__n_Akbay-kesilmis-fotograf.jpg\" alt=\"\" width=\"550\" height=\"414\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/Eksim_Enerji_CEO_Ark__n_Akbay-kesilmis-fotograf.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/Eksim_Enerji_CEO_Ark__n_Akbay-kesilmis-fotograf-300x226.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/Eksim_Enerji_CEO_Ark__n_Akbay-kesilmis-fotograf-500x376.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/Eksim_Enerji_CEO_Ark__n_Akbay-kesilmis-fotograf-66x50.jpg 66w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><p id=\"caption-attachment-200025\" class=\"wp-caption-text\">Eksim Enerji CEO&#8217;su Ark\u0131n Akbay<\/p><\/div>\n<h3><strong>\u00dcretti\u011fimiz temiz enerjiyle 1 milyon 230 bin hanenin ihtiyac\u0131 kar\u015f\u0131lanacak<\/strong><\/h3>\n<p>T\u00fcrkiye\u2019nin bir\u00e7ok b\u00f6lgesinde stratejik yat\u0131r\u0131mlar\u0131 hayata ge\u00e7irirken Silivri\u2019nin ayr\u0131 bir \u00f6neme sahip oldu\u011funun alt\u0131n\u0131 \u00e7izen\u00a0<strong>Eksim Enerji CEO&#8217;su Ark\u0131n Akbay\u00a0<\/strong>\u015funlar\u0131 s\u00f6yledi:<\/p>\n<p><em>&#8220;Silivri\u2019de yer alan RES tesisimiz, 2014 y\u0131l\u0131ndan bu yana \u015firketimizin en y\u00fcksek verimlilikle \u00e7al\u0131\u015fan ve en fazla elektrik \u00fcreten santrallerinden biri konumunda.\u00a0Bu tesiste g\u00fcn\u00fcm\u00fcze kadar 2,2 milyon MWh elektrik \u00fcretildi ve yakla\u015f\u0131k 760 bin hanenin elektrik ihtiyac\u0131 kar\u015f\u0131land\u0131. \u015eimdi ise\u00a0i\u015fletmedeki 23 t\u00fcrbinimize ek olarak, 3 t\u00fcrbinimizi Bakanl\u0131k kabul\u00fc ile i\u015fletmeye ald\u0131k. \u0130n\u015fa halindeki 40,3 MW&#8217;l\u0131k kapasite art\u0131r\u0131m projemizi tamamlama yolunda ilerliyoruz. Kurulu\u015fundan bu yana 100 Milyon USD yat\u0131r\u0131m ger\u00e7ekle\u015ftirdi\u011fimiz santralimizde, y\u0131l sonuna kadar 5, \u00f6n\u00fcm\u00fczdeki y\u0131l ise 2 t\u00fcrbini daha devreye alaca\u011f\u0131z&#8221;<\/em> dedi.<\/p>\n<p>R\u00fczgar, g\u00fcne\u015f ve hidroelektrik santralleri olmak \u00fczere yurt i\u00e7i ve yurt d\u0131\u015f\u0131nda yakla\u015f\u0131k 1.000 MW&#8217;l\u0131k kurulu g\u00fcce ula\u015ft\u0131klar\u0131n\u0131 belirten\u00a0<strong>Ark\u0131n Akbay<\/strong>, <em>\u201cYurtd\u0131\u015f\u0131 yat\u0131r\u0131mlar\u0131m\u0131zla birlikte 930 MW olan kurulu g\u00fcc\u00fcm\u00fcz\u00fc, y\u0131l sonunda 1.030 MW&#8217;a \u00e7\u0131karmay\u0131 hedefliyoruz. Bu b\u00fcy\u00fcme, \u015firketimizi yenilenebilir enerjide ilk 10 ve r\u00fczgar enerjisinde ise ilk 3 oyuncu aras\u0131na ta\u015f\u0131yacak. Yakla\u015f\u0131k 1 milyon 230 bin hanenin enerji ihtiyac\u0131n\u0131 yenilenebilir enerjiden kar\u015f\u0131lanm\u0131\u015f olacak\u201d<\/em> ifadelerini kulland\u0131.<\/p>\n<h3><strong>\u0130\u00e7 Anadolu\u2019nun r\u00fczgar\u0131 Eksim ile artacak<\/strong><\/h3>\n<p>Eksim Enerji\u2019nin yat\u0131r\u0131m hamleleri, yaln\u0131zca kapasite art\u0131\u015f\u0131yla s\u0131n\u0131rl\u0131 de\u011fil. Tokat\u2018\u0131n Killik il\u00e7esinde kapasite art\u0131\u015f\u0131n\u0131 tamamlayarak 101 MW\u2019a ula\u015fan \u015eirket, Yozgat ve Karaman\u2019da yeni santral in\u015falar\u0131na da devam ediyor. Karaman\u2019da 70 MW ve Yozgat\u2019ta 56 MW kurulu g\u00fcc\u00fc hedefleyen \u015firket, bu y\u0131l i\u00e7erisinde tamamlad\u0131\u011f\u0131 150 MW\u2019l\u0131k Geyve RES ve 191 MW\u2019l\u0131k Viran\u015fehir GES projeleriyle birlikte y\u0131l\u0131n enerji \u015firketi olmaya aday.<\/p>\n<p>Yay\u0131na Alan: Alperen ERTA\u015e-<a href=\"http:\/\/alperen.ertas@enerjigazetesi.ist\">alperen.ertas@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Ye\u015fil enerji yat\u0131r\u0131mlar\u0131na h\u0131z kazand\u0131ran Eksim Enerji, bir yandan mevcut santrallerinde kapasite art\u0131\u015f\u0131 projeleri y\u00fcr\u00fct\u00fcrken di\u011fer yandan yeni santral yat\u0131r\u0131mlar\u0131na devam ediyor. [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":200024,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[97192,9359],"views":18,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/200023"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=200023"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/200023\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/200024"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=200023"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=200023"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=200023"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}