{"id":200014,"date":"2025-09-01T15:08:30","date_gmt":"2025-09-01T12:08:30","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=200014"},"modified":"2025-09-01T15:08:30","modified_gmt":"2025-09-01T12:08:30","slug":"su-tankerine-gizlenen-kacak-trafo-drondan-saklanamadi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/su-tankerine-gizlenen-kacak-trafo-drondan-saklanamadi\/","title":{"rendered":"(Turkish) Su Tankerine Gizlenen Ka\u00e7ak Trafo Drondan Saklanamad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/200014\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong> Dicle Elektrik, Mardin\u2019in Savur il\u00e7esinde dron ile yapt\u0131\u011f\u0131 kontrollerde, \u00fczeri kesilerek i\u00e7erisine ka\u00e7ak trafo yerle\u015ftirilmi\u015f tekerlekli bir su tankeri tespit etti. Ka\u00e7ak trafonun 430 haneye yetecek g\u00fc\u00e7te oldu\u011fu ve tar\u0131msal sulamada kullan\u0131ld\u0131\u011f\u0131 tespit edildi. Ayn\u0131 b\u00f6lgede ayr\u0131ca 5 ka\u00e7ak trafo daha bulundu.<\/strong><\/h2>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-200015 size-full\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/1756450915_01.jpg\" alt=\"\" width=\"550\" height=\"318\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/1756450915_01.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/1756450915_01-300x173.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/1756450915_01-500x289.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/09\/1756450915_01-80x46.jpg 80w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p>Kay\u0131ps\u0131z, kesintisiz ve kaliteli enerji da\u011f\u0131t\u0131m\u0131 hedefiyle G\u00fcneydo\u011fu Anadolu B\u00f6lgesi\u2019nde yer alan alt\u0131 ilde hizmet veren Dicle Elektrik, ka\u00e7ak elektrikle m\u00fccadele \u00e7al\u0131\u015fmalar\u0131na kararl\u0131l\u0131kla devam ediyor. \u015eirketin sorumluluk b\u00f6lgesinde elektrik \u015febekesine ve ekonomiye zarar veren ka\u00e7ak t\u00fcketimi tespit etmek i\u00e7in olu\u015fturulan dron filosu, denetimini s\u00fcrd\u00fcr\u00fcyor. Son olarak Mardin\u2019in Savur il\u00e7esine ba\u011fl\u0131 k\u0131rsal \u015eenocak Mahallesi\u2019nde yap\u0131lan taramalarda, \u00fczeri kesilerek i\u00e7erisine ka\u00e7ak trafo yerle\u015ftirilen tekerlekli bir su tankeri denetim dronu taraf\u0131ndan tespit edildi.<\/p>\n<h3><strong>430 haneye yetecek elektri\u011fi ka\u00e7ak kulland\u0131lar<\/strong><\/h3>\n<p>Dicle Elektrik ekiplerinin dron ile tespit etti\u011fi ka\u00e7ak trafonun, bir trakt\u00f6re ba\u011fl\u0131 r\u00f6mork \u00fczerindeki tekerlekli su tankeri i\u00e7ine gizlendi\u011fi ortaya \u00e7\u0131kt\u0131. Yerden bak\u0131ld\u0131\u011f\u0131nda s\u0131radan bir su tankeri gibi g\u00f6r\u00fcnen bu d\u00fczenek, detayl\u0131 dron g\u00f6r\u00fcnt\u00fcleriyle bulundu. Yap\u0131lan teknik incelemede, s\u00f6z konusu trafonun 430 hanenin elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131layacak kapasitede oldu\u011fu belirlendi.<\/p>\n<h3><strong>Ayn\u0131 b\u00f6lgede 5 ka\u00e7ak trafo daha tespit edildi<\/strong><\/h3>\n<p>Dicle Elektrik m\u00fchendisleri, bu b\u00fcy\u00fckl\u00fckteki ka\u00e7ak trafolar\u0131n \u00f6zellikle tar\u0131msal sulama alanlar\u0131nda \u015febekeye a\u015f\u0131r\u0131 y\u00fck bindirdi\u011fini, voltaj dalgalanmalar\u0131na neden olarak di\u011fer abonelerin enerji kalitesini olumsuz etkiledi\u011fini ifade etti. Ayn\u0131 b\u00f6lgede yap\u0131lan taramalarda 5 ka\u00e7ak trafo daha tespit edilirken, bu trafolar\u0131n tamam\u0131n\u0131n y\u00fczlerce metre derinlikten su \u00e7ekmek i\u00e7in kullan\u0131ld\u0131\u011f\u0131 anla\u015f\u0131ld\u0131.<\/p>\n<h3><strong>Ekonomiye ve \u00e7evreye de zarar veriyor<\/strong><\/h3>\n<p>Dicle Elektrik yetkilileri, tespit edilen t\u00fcm ka\u00e7ak trafolar i\u00e7in savc\u0131l\u0131\u011fa su\u00e7 duyurusunda bulunuldu\u011funu bildirdi. Ka\u00e7ak elektrik kullan\u0131m\u0131n\u0131n da\u011f\u0131t\u0131m \u015febekesinin yan\u0131 s\u0131ra \u00fclke ekonomisine, \u00e7evreye ve tar\u0131msal \u00fcretime de zarar verdi\u011fini belirten yetkililer, <em>\u201cAmac\u0131m\u0131z t\u00fcm abonelerimizin adil bir \u015fekilde kaliteli ve kesintisiz enerji alabilmesidir. Bu nedenle teknolojiyi de kullanarak ka\u00e7ak t\u00fcketimle m\u00fccadelemizi kararl\u0131l\u0131kla s\u00fcrd\u00fcr\u00fcyoruz\u201d<\/em> \u015feklinde konu\u015ftu.<\/p>\n<p>Yay\u0131na Alan: Alperen ERTA\u015e-<a href=\"http:\/\/alperen.ertas@enerjigazetesi.ist\">alperen.ertas@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Dicle Elektrik, Mardin\u2019in Savur il\u00e7esinde dron ile yapt\u0131\u011f\u0131 kontrollerde, \u00fczeri kesilerek i\u00e7erisine ka\u00e7ak trafo yerle\u015ftirilmi\u015f tekerlekli bir su tankeri tespit etti. Ka\u00e7ak [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":200015,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[12240,117074],"views":19,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/200014"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=200014"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/200014\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/200015"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=200014"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=200014"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=200014"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}